61 Cooper Square
Manhattan, NY 10003BBL 1-00463-0001Map
Owner of record: Ukrainian Evangelical Assemblies
61 Cooper Square is a religious facility built in 1867 in Manhattan, 10003. The owner of record is Ukrainian Evangelical Assemblies. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 33
- ECB violations
- 21
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 33
- Construction other optional
Failure to maintain building in a code compliant manner. observed severly corroded cornice on exposure 1 and 2. also spalled stone work in mulitple locations on exposure 1 and 2. remedy: repair and or replace
Jan 28, 2026
Dob violation - active - Construction other optional
Failure to maintain building in a code compliant manner. observed severly corroded cornice with rust holes on exposures 1 and 2 south & west elevations. also spalled/spalling stone work in multiple locations. remedy: repair and or replace
Aug 19, 2025
Dob violation - active - Construction other optional
Ftm bldg in a code compliant manner. observed severly corroded cornice with rust holes on exposures 1 and 2 south and west elevations. also spalled/spalling stone work in multiple locations. remedy: repair and or replace
Aug 14, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 26, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 13, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 24, 2021
Dob violation - dismissed
Show 23 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 10, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 29, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 1, 2021
Dob violation - active - Emergency none
Provide approximately 80 linear feet of sidewalk shed for overhead pedestrian protection at exposure 4 (east 7th street side)to protect public and property
Jun 8, 2021
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 7, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 4, 2012
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - active
ECB violations · 21
- Class - 1
Failure to maintain building in code compliant manner. at time of inspection, i observed severely corroded cornice with rust holes on exposure 1 & 4 spalled/spalling stone work throughout facade. steps at main
Oct 10, 2025 · Penalty $6,280
Active - Class - 2
Failure to comply with commissioner's order contained in summons #35591846z issued on 9/23/2021, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable certi
Aug 26, 2024 · Penalty $1,250
Active - Class - 1
Inadequate egress at the time of inspection i observed multiple dwelling areas on the 2nd,3rd, and 4th floor, i also observed only one staircase/ 1 means of egress. 1 means of egress is inadequate for the 18 oc
Apr 16, 2024
Resolve - Class - 1
At the time of inspection i observed buildings occupancy contrary to lno# 1750 dated on 03/25/11. i observed 11 rooms/ living areas with 30 mattress between the 2nd,3rd, and 4th floor. partial vacate issued for
Apr 16, 2024
Resolve - Class - 1
At the time of inspection i observed 3 fully functional kitchen areas with 2 gas stoves and 1 electric stove. according to dob records no permits where pulled for the installation of these stoves., obtain permi
Apr 16, 2024
Resolve - Class - 2
I responded to complaint and observed installed sws in place.i searched dob system and appears that permit # m00561948 for sws expired on 03/30/2023.such permit shall be active when sws is in place.
Apr 22, 2023 · Penalty $620
Resolve - Class - 2
Safe condition.i responded to complaint # 1634810 and observed minor damaged of sws( parapet panel)at corner of exp. # 1 and exp. # 4.sws shall be maintained in a safe conditions and used in a manner that elimi
Apr 22, 2023 · Penalty $620
Resolve - Class - 1
Failure to maintain building in code compliant manner.noted at time ofmy inspection i observed at exp4 exterior wall cornice in disrepair.a broken defective cornice section has cracks spalling stone section is
Jan 12, 2022 · Penalty $625
Active - Class - 2
Failure to maintain bldg in codecompliant manner noted:bldg facade in state of disrepair.@exp4 (7st) damaged/missing decorative stones cornice&around windows in various locations,rusted/disrepair metal cornice&
Sep 23, 2021 · Penalty $625
Active - Class - 1
Failure to maintain bldg in codecompliant manner.exterior wall,cornice&7st side stapes are disrepair.atoi observed broken,defective cornice secs/cracked spalled stone secs corroded,eroded steps of stair to main
Aug 30, 2021
Resolve
Show 11 more ↓
- Class - 2
Failure to maintain building in code compliant manner.note:at time of inspection observed broken defective cornice sections/cracked spalled stone sections corroded eroded steps of stair to main entrance door at
Aug 18, 2021 · Penalty $625
Active - Class - 1
Failure to maintain building exterior walls in code compliance:note:at time of inspection view at exp #1 west elevations corrosions of cornice,cracks and damaged stone joints exp #4 south elevation at e 7 stree
Jul 10, 2021 · Penalty $625
Active - Class - 1
Failure to comply with order of commissioner.note:at present time no acceptable structural stability evaluation report of building facade was submitted to dob as directed in commissioner's order #060221ll ns04
Jul 10, 2021 · Penalty $12,500
Active - Class - 1
Failure to maintain building in a code-compliant manner. at time of inspection, observed damaged/missing piece of the decorative stone cornice over the window on the 3rd floor of the facade at exposure #4. dama
Jun 4, 2021
Resolve - Class - 1
Failure to maintain building exterior walls/facade appurtenances:observed at building cornice damaged metal.corrosions.cornice is in a stateof collapsing at exposure 1 and exposure 4.rem:maintain building exter
Jun 2, 2021 · Penalty $2,500
Active - Class - 1
Failure to maintain bldg walls or appurtenances. noted: windows crown at 3 to 5 floors are rotten,spalling & in danger to collapse at exp#1 side(south side) remedy: repair &/or replace defects.
Jul 18, 2015
Resolve - Class - 2
Occupancy contrary to that allowed by bldg dept records illegal occupancy. noted: create recreation area at roof of 1 floor restaurant(east side). remedy: discontinue illegal occupancy.
Jul 18, 2015
Resolve - Class - 2
Sec. 32-653 having causing signage a not limited to the name & address of establishment for corner deli awning sign. remedy: remove illegal signage.
Jul 18, 2015
Resolve - Non-hazardous
Failure to provide adequate emergency power exit light pursuant to becstandards remedy: provide adequate emergency power exit light pursua-nt to bec standards
Jul 12, 1993
Resolve - Non-hazardous
Failure to provide power exut light in staircases, and emergencvy power exit light not adequate in corridor on floors 2,3,5,6 remedy: provide emergency lighting to meet b.e.c. standard
Jan 25, 1991 · Penalty $400
Active - Non-hazardous
Operation of a pa without a current permit. remedy: obtain a permit.emergency lighting is inadequate. does not conform with ll41/78. remedy; complete installation of emergency lighting.
Jul 6, 1988 · Penalty $1,285
Active
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Religious facility (M1)
- Year built
- 1867
- Floors
- 4
- Residential units
- —
- Building area
- 12,556 ft²
- Lot area
- 3,139 ft²
- Zoning
- C6-1
- Community board
- 103
- Council district
- 2
- Block / lot
- 463 / 1
- Assessed value
- $595,800
- Landmark / historic district
- INDIVIDUAL LANDMARK
Questions about 61 Cooper Square
Who owns 61 Cooper Square?
The owner of record in NYC Department of City Planning PLUTO data is Ukrainian Evangelical Assemblies.
Does 61 Cooper Square have violations?
NYC HPD has no housing violations on record for this property.
Is 61 Cooper Square rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 61 Cooper Square built?
City records list 1867 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.