216 East 5 Street
Manhattan, NY 10003BBL 1-00460-0019Map
Owner of record: Moll, Stephan
216 East 5 Street is a walk-up apartment building built in 1866 in Manhattan, 10003. It has 12 residential units across 5 floors. The owner of record is Moll, Stephan. HPD has recorded 220 housing violations here, most recently on August 19, 2026. 18 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 220
- DOB violations
- 9
- ECB violations
- 22
- HPD complaints
- 220
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 220
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall at bulkhead at public hall stairs, 5th story
Aug 19, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at bulkhead at public hall stairs, 5th story
Aug 19, 2026
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of air conditioner bracket at 1st window from east, 4th story at building front
Aug 19, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door leading at south yard , 1st story
Aug 19, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at the public hall , 1st story
Aug 19, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked at door leading to boiler room at boiler room, 1st story
Aug 19, 2026
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective missing electrical outlet cover at south wall in the kitchenette located at apt 9, 5th story, 1st apartment from east at south
Aug 19, 2026 · Apt 9
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective shut off knob at radiator in the kitchenette located at apt 9, 5th story, 1st apartment from east at south
Aug 19, 2026 · Apt 9
Open — Nov sent out - ANon-hazardous
Properly secure the loose upper escutcheon plate at heat riser in the bathroom located at apt 9, 5th story, 1st apartment from east at south
Aug 19, 2026 · Apt 9
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 3rd room from north located at apt 9, 5th story, 1st apartment from east at south
Aug 19, 2026 · Apt 9
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9, 5th story, 1st apartment from east at south
Aug 19, 2026 · Apt 9
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at east wall in the kitchenette located at apt 9, 5th story, 1st apartment from east at south
Aug 19, 2026 · Apt 9
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at door in the 1st entrance from north located at bsmt-apt gfw, 2nd bsmt-apt from east at south
Aug 7, 2026 · Apt GFW
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation steam riser at north wall in the 1st room from north located at bsmt-apt gfw, 2nd bsmt-apt from east at south
Aug 7, 2026 · Apt GFW
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at bsmt-apt gfw, 2nd bsmt-apt from east at south
Aug 7, 2026 · Apt GFW
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the landing and stairs at all stories at public hall
Apr 7, 2026
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchenette located at apt 9, 5th story, 1st apartment from east at south
Apr 7, 2026 · Apt 9
Open — First no access to re- inspect violation - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Apr 7, 2026
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9, 5th story, 1st apartment from east at south
Apr 6, 2026 · Apt 9
Closed — Violation closed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at ... in the 1st entrance from east located at bsmt-apt gfw, 1st bsmt-apt from east at south
Mar 30, 2026 · Apt GFW
Open — Not complied with - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at bsmt-apt gfw, 1st story, 1st bsmt-apt from east at south
Mar 3, 2026 · Apt GFW
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical outlet at south wall in the bathroom located at bsmt-apt gfw, 1st bsmt-apt from east at south
Mar 3, 2026 · Apt GFW
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the 2nd room from north located at bsmt-apt gfw, 1st bsmt-apt from east at south
Mar 3, 2026 · Apt GFW
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt gfw, 1st apartment from east at south
Mar 3, 2026 · Apt GFW
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation at riser at north wall in the 2nd room from north located at apt gfw, 2nd apartment from east at south
Jan 29, 2026 · Apt GFW
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at bsmt-apt gfw, 2nd bsmt-apt from south at west
Jan 29, 2026 · Apt GFW
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Jan 29, 2026
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of water exceeding 130 degrree at all water fixtures in the entire apartment located at bsmt-apt gfw, 2nd bsmt-apt from east at south
Jan 29, 2026 · Apt GFW
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at basement at boiler room
Jan 29, 2026
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective light fixtier at ceiling in the 1st room from north located at bsmt-apt gfw, 2nd bsmt-apt from south at west
Jan 29, 2026 · Apt GFW
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at bsmt-apt gfw, 2nd bsmt-apt from east at south
Jan 29, 2026 · Apt GFW
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door hinges in the 2nd entrance from east at north located at bsmt-apt gfw, 2nd bsmt-apt from east at south
Jan 29, 2026 · Apt GFW
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 9, 5th story, 1st apartment from east at south
Dec 24, 2025 · Apt 9
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at entrance door located at bsmt-apt gfw, 1st bsmt-apt from east at south
Dec 16, 2025 · Apt GFW
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation heat riser pipe in the 1st room from north located at bsmt-apt gfw, 1st bsmt-apt from east at south
Dec 16, 2025 · Apt GFW
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective ceramic-tiles at ceiling in the bathroom located at apt 9, 5th story, 1st apartment from east at south
Sep 28, 2025 · Apt 9
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 9, 5th story, 1st apartment from east at south
Sep 28, 2025 · Apt 9
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 9, 5th story, 1st apartment from east at south
Sep 28, 2025 · Apt 9
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 9, 5th story, 1st apartment from east at south
Sep 27, 2025 · Apt 9
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective bell/buzzer intercom system from the building entrance door to tenant's mobile device located at bsmt-apt gfw, 1st bsmt-apt from east at south
Sep 27, 2025 · Apt GFW
Closed — Violation closed - BHazardous
Refit the door at entrance located at bsmt-apt gfw, 1st bsmt-apt from east at south
Sep 27, 2025 · Apt GFW
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north located at bsmt-apt gfw, 1st bsmt-apt from east at south
Sep 27, 2025 · Apt GFW
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 9, 5th story, 1st apartment from east at south
Sep 27, 2025 · Apt 9
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 9, 5th story, 1st apartment from east at south
Sep 27, 2025 · Apt 9
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 9, 5th story, 1st apartment from north at east
Sep 6, 2025 · Apt 9
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood floors in the foyer located at apt gfw, 1st apartment from east at south
Jul 7, 2025 · Apt GFW
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at entrance located at bsmt-apt gfw, 1st bsmt-apt from east at south
Jul 7, 2025 · Apt GFW
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation riser at west wall in the 3rd room from north located at apt gfw, 1st apartment from east at south
Jul 7, 2025 · Apt GFW
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door , 5th story
Jun 20, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door to the roof
Jun 12, 2025
Closed — Violation closed
DOB building violations · 9
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 7, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed
ECB violations · 22
- Class - 1
Atoi observed an improperly mounted 1st-floor ac unit leaking water, with a cracked, weathered window sill and deteriorated exterior facade at exp 1., repair and/replace; remove and/or properly secure ac unit,
Aug 7, 2026 · Penalty $2,500
Resolve - Class - 2
Failure to maintain building in code compliant manner: atoi, observed at cellar, piles and bags of garbage, debris, used and unused construction materials, bags of cements, fire extinguishers and numerous other
Sep 24, 2024
Resolve - Class - 2
Failure to maintain building in code compliant manner: at the time of inspection, observed at 5th floor level, boxes and construction material blocking access to apartment door. at stairway leading to roof, fir
Sep 12, 2024 · Penalty $625
Resolve - Class - 2
In apartment #7 new installation of outlets and switches no application on file with d.o.b., obtain permit
Aug 23, 2023
Resolve - Class - 1
At the time of inspection i observed throughout apartments 3, 5, and 7 water damaged and deuterating fixtures outlets panel boxes with breakers and wires from the last flood., comply with ec
Aug 23, 2023
Resolve - Class - 1
Failure to maintain building in code compliant manner. observed water leaking from lights and outlets in apt#3 at time of inspection., repair and/replace
Aug 21, 2023
Resolve - Class - 2
Failure to maintain building in code complaint manner: observed access door from exterior staircase to the roof was not locked and alarm was off. open edge on the roof (exposure 3) no parapet walls no guardrail
Aug 17, 2023
Resolve - Class - 2
Work with out permit : at time of inspection of a 5 story building on the roof observed electrical work done on the wall at expo.#4 ( new electrical line and gang box installed) connected to a/c units. dob reco
Aug 17, 2023
Resolve - Class - 1
Failure to maintain. improper exit/exit access doorway, comply with code; remove obstruction
Aug 8, 2023
Resolve - Class - 2
Oil bnr poor flame odor@start/blr flue plate needs bolts+gasketýcement not acceptable¨/oil shutoff vlv miss top of tank/heat controller not calibrated@<55*outside+@68*inside/debris inside+outside blr room/unuse
Feb 23, 2023 · Penalty $312
Resolve
Show 12 more ↓
- Class - 2
Failure to post or properly post permit for work at premises.note:at time of inspection at occupied family dwelling construction activity in apt #1 under job #m00818458-i1 cc have not been posted.active permits
Feb 1, 2023
Resolve - Class - 2
Occupancy contrary to that allowed by cofo. noted: job # 140969281 to renovate apt # 1,2,5,6,and 8 was signed off on 08/29/2022. apt #2 is occupied entirely to store construction materials contrary to cofo# 775
Oct 14, 2022
Resolve - Class - 2
Failure to maintain building in code-compliant manner: at time of inspection observed in occupied building excessive dust throughout. hallways, stairwells, handrails and recycling trash bins covered with dust.
Aug 27, 2021 · Penalty $625
Resolve - Class - 1
Work w/o permit atoi,i observed on expire permit in bldg active const work in bldg w/o valid dob permit.permit expired5/28/21&issued to kenny watson.stop all work&make site safe&clean&secure obtain permit
Aug 17, 2021 · Penalty $1,250
Resolve - Class - 2
Electrical work without a permit.observed at 8am removal of electricalwiring in apartment 2.no application on file for electrical work.remedy:obtain permit.
Jun 16, 2021 · Penalty $800
Resolve - Class - 2
I observed in basement worker digging and installing sanitary waste piping and no permits on file for any plumbing work being performed in basement at time of inspection, work was about 25% complete, obtain all
Jun 16, 2021
Resolve - Class - 2
Observed excessive construction demo debris stored / piled in apt # 1 inadequate manner on 1st floor level., maintain adequate construction housekeeping
Apr 7, 2021
Resolve - Class - 1
28-201.1 inadequate tenant protection plan.note at time of inspection observed work had begun under the aforementioned job number.the submitted tpp lacks specific means and methods of protection tenants on the
Apr 7, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to provide effective continuity for metal raceways enclosures cable armor.raceway to emergency lights in hallway not continuous.rem:provide effective electrical continuity.
Apr 7, 2021 · Penalty $250
Resolve - Class - 2
Prohibitted use of electrical metalic tubing(emt)electrical matalic raceway used for outdoor lighting rear of building.rem:comply with ec code.
Apr 7, 2021 · Penalty $250
Resolve - Class - 2
Failure to maintian bldg in code compliant manner walls & appurtenancenote at exposure #1 front facade 1st fl decorative concrete above window has deteriorated & fallen off.not in danger of any more spalling
Sep 28, 2020 · Penalty $625
Resolve - Class - 1
Failure to maintain building in code compliant manner. at front of building the decorative stone is deteriorating, repair and/replace
May 30, 2020 · Penalty $3,125
Resolve
Complaints
- Safety
Fire escape
Oct 9, 2026 · Apt 1STFLO
Open - Door/window
Door
Oct 9, 2026 · Apt 1STFLO
Open - Flooring/stairs
Stairs
Oct 9, 2026 · Apt 1STFLO
Open - Heat/hot water
Apartment only
Aug 5, 2026 · Apt 9
Close - Door/window
Door
Aug 1, 2026 · Apt LOBBY
Close - Door/window
Door
Aug 1, 2026 · Apt 9
Close - Unsanitary condition
Garbage/recycling storage
Jul 28, 2026 · Apt BLDG
Close - Paint/plaster
Wall
Jul 28, 2026 · Apt 9
Close - Plumbing
Basin/sink
Jul 28, 2026 · Apt 9
Close - Paint/plaster
Radiator
Jul 27, 2026 · Apt GFW
Close
Show 40 more ↓
- Flooring/stairs
Floor
Jul 27, 2026 · Apt GFW
Close - Paint/plaster
Ceiling
Jul 27, 2026 · Apt GFW
Close - Paint/plaster
Door/frame
Jul 27, 2026 · Apt GFW
Close - Paint/plaster
Wall
Jul 23, 2026 · Apt 9
Close - Unsanitary condition
Garbage/recycling storage
Jul 20, 2026 · Apt BLDG
Close - Water leak
Damp spot
Jul 3, 2026 · Apt 9
Close - Heat/hot water
Apartment only
Mar 18, 2026 · Apt APT9
Close - Unsanitary condition
Mold
Mar 18, 2026 · Apt APT9
Close - Plumbing
Basin/sink
Mar 18, 2026 · Apt APT9
Close - Plumbing
Radiator
Mar 18, 2026 · Apt APT9
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Flooring/stairs
Floor
Mar 10, 2026 · Apt GFW
Close - Flooring/stairs
Floor
Mar 10, 2026 · Apt GFW
Close - Door/window
Door
Mar 9, 2026 · Apt LOBBY
Close - Door/window
Door
Mar 9, 2026 · Apt LOBBY
Close - Door/window
Door
Feb 27, 2026 · Apt GFW
Close - Plumbing
Radiator
Feb 27, 2026 · Apt GFW
Close - Electric
Outlet/switch
Feb 27, 2026 · Apt GFW
Close - Electric
Outlet/switch
Feb 27, 2026 · Apt GFW
Close - Flooring/stairs
Floor
Feb 27, 2026 · Apt GFW
Close - Plumbing
Bathtub/shower
Feb 27, 2026 · Apt GFW
Close - Paint/plaster
Ceiling
Feb 27, 2026 · Apt GFW
Close - Door/window
Door
Feb 23, 2026 · Apt LOBBY
Close - Door/window
Door
Feb 23, 2026 · Apt LOBBY
Close - Electric
Outlet/switch
Feb 12, 2026 · Apt GFW
Close - Paint/plaster
Ceiling
Feb 12, 2026 · Apt GFW
Close - Plumbing
Bathtub/shower
Feb 12, 2026 · Apt GFW
Close - Door/window
Door
Jan 28, 2026 · Apt GFW
Close - Door/window
Door frame
Jan 28, 2026 · Apt GFW
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt GFW
Close - Electric
Outlet/switch
Jan 22, 2026 · Apt GFW
Close - Plumbing
Bathtub/shower
Jan 22, 2026 · Apt GFW
Close - Electric
Lighting
Jan 22, 2026 · Apt GFW
Close - Paint/plaster
Ceiling
Jan 22, 2026 · Apt GFW
Close - Water leak
Damp spot
Jan 19, 2026 · Apt 9
Close - Safety
Fire escape
Jan 18, 2026 · Apt 1STFLO
Close - Electric
Lighting
Jan 13, 2026 · Apt GFW
Close - Paint/plaster
Ceiling
Jan 13, 2026 · Apt GFW
Close - Paint/plaster
Radiator
Jan 13, 2026 · Apt GFW
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1866
- Floors
- 5
- Residential units
- 12
- Building area
- 6,853 ft²
- Lot area
- 2,308 ft²
- Zoning
- R8B
- Community board
- 103
- Council district
- 2
- Block / lot
- 460 / 19
- Assessed value
- $728,100
- Landmark / historic district
- East Village / Lower East Side Historic District
HPD registration #117329, last renewed Oct 16, 2025.
Questions about 216 East 5 Street
Who owns 216 East 5 Street?
The owner of record in NYC Department of City Planning PLUTO data is Moll, Stephan.
Does 216 East 5 Street have violations?
Yes. NYC HPD has recorded 220 housing violations at this property.
Is 216 East 5 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 50% of its 12 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 216 East 5 Street built?
City records list 1866 as the year it was built.
How many apartments are in 216 East 5 Street?
It has 12 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.