roofy

54 East 4 Street

Manhattan, NY 10003BBL 1-00459-0012Map

Owner of record: East Manhattan Holdings LLC

54 East 4 Street is a walk-up apartment building built in 1878 in Manhattan, 10003. It has 22 residential units across 5 floors. The owner of record is East Manhattan Holdings LLC. HPD has recorded 7 housing violations here, most recently on December 22, 2023. 6 of the 7 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2020.

HPD violations
7
DOB violations
3
ECB violations
21
HPD complaints
20

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Dec 22, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2020
1
About 5% of the building's 22 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 7

  • C

    Replace or repair the self-closing doors that is missing or defective at door leading to basement. at public hall, 1st story

    Dec 22, 2023

    Closed — Violation closed
  • C

    Remove the illegal fastening consisting of an unacceptable electric magnetic lock set at bldg. door form street to vestibule

    Nov 28, 2011

    Open — Nov sent out
  • B

    Provide mechanical lock set at bldg. door from street to vestibule for security the event of power outage at magnetic lock

    Nov 28, 2011

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of electical expose wires at west wall at public hall, 3rd story

    Mar 31, 2007

    Open — Nov certified late
  • B

    Replace with new the broken or defective air vent valve at radiator in the 1st room from north located at apt 19, 5th story, 1st apartment from north at east

    Mar 11, 2007 · Apt 19

    Open — Nov certified late
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint front fire escape all stys.

    Jun 1, 1999

    Open — Not complied with
  • A

    Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration door removed and opening sealed with masonry 3 sty public hall east center.

    Jun 13, 1997

    Open — Not complied with

DOB building violations · 3

  • Construction other optional

    C-construction other optional

    Sep 20, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active

ECB violations · 21

  • Hazardous

    Work does not conform w/ approved plans. noted: no amended plans provided to show cited non conforming as built condominiums cited in ecb #'s 34267417j,34236837y,342564804x,34257715z. bldg renovation was

    Jun 7, 2007 · Penalty $250

    Active
  • Hazardous

    Failure to maintain bldg. noted: cracks in stairwell wall. remedy: repair defective conditions immediately.

    Jun 7, 2006

    Resolve
  • Hazardous

    Failure to safe guard public & property affected by construction operations.noted:construction including use of gas governor above 2 occupied apts. as well as missing & off level joist under 2 ocuppied apts. ba

    Dec 11, 2000

    Resolve
  • Non-hazardous

    Work does not conform to approved plans. noted: first floor framing does not conform to plan #102831731 of 4/28/00. w 8x24 i beams run parallel for approx 1/2 the depth of basement level & then only a single w

    Nov 6, 2000 · Penalty $250

    Active
  • Hazardous

    Failure to safely & properly remove debris from construction site:hazardous: noted:demolition debris being thrown out of windows & donnair shaft to ground fl. creating danger to tenants whose windows are in sha

    Oct 10, 2000 · Penalty $500

    Active
  • Non-hazardous

    Work does not conform to approved plans.noted:2nd and 4th floor elevators 101/4"higher than existing elevation.plans call for new construction work to belevel with existing construction.improper joist splices +

    Sep 19, 2000 · Penalty $130

    Active
  • Hazardous

    Failure to safely and properly remove material and debris from construction site.noted:4th floor full rubble chutes not being used to reach dumpster (no sidewalk shed) open shafts at 2nd and 3rd floor.some rubb

    Sep 19, 2000 · Penalty $500

    Active
  • Hazardous

    Exit door: total obstruction. noted: basement exit dor to front yard(approx 10ft x 4ft + 1 1/2 ft below sidewalk) to totally blocked by 2 broken refrigerators. broken throught iron gates thrown on yard surface,

    Sep 12, 2000

    Resolve
  • Non-hazardous

    Failure to maintain exterior building wall. noted:fire escape at front of bldg. corroded on ail floors. columns of front stoop full of holes with missing concrete surfaces + broken brick work exposed. piece of

    Sep 12, 2000

    Resolve
  • Hazardous

    No fire proof enclosure for boiler. noted: boiler room has only asingle sheet of 5/8" sheet rock on ceiling. openings + joints in sheet rock not sealed. not proper fire proof self closing door in boiler room. b

    Sep 12, 2000

    Resolve
Show 11 more ↓
  • Non-hazardous

    Work does not conform to approved plans-hazardous noted:stell column st beams, wood joists & studwalls installed contrary to plans, installed contrary to plans. dangere showing of structural members. 2nd, 3rd

    Aug 2, 2000 · Penalty $500

    Active
  • Hazardous

    Failure to safely and properly remove material/debris from construction site.noted:debris from gut renovation(except 3 occupied apts)being thrown and left in rear court yard and down exterior shaft.piles of deb

    Aug 2, 2000

    Resolve
  • Hazardous

    Failure to safeguard public and property affected by construction operations creating hazardous conditions.noted:entire bldg (except 3 occupied apts:6,11,12)undergut renovation no separation of work sites from

    Aug 2, 2000 · Penalty $1,000

    Active
  • Hazardous

    No guard rails.noted:old dumbwaiter shaft open and unprotected from top floors to basement creating hazardous conditions for workers.construction size open to public corridors of partially inhabitated bldg.loca

    Aug 2, 2000 · Penalty $1,000

    Active
  • Hazardous

    Failure to maintain building hazardous.noted:walls separating from ceiling and floors.holes in plaster and falling plaster.furnace room ceiling entirely open to upper floor and has no door only wood joists in c

    Aug 2, 2000 · Penalty $800

    Active
  • Non-hazardous

    Work does not conform to approved plan # 102831731-alt 2/25/00 noted: temporary sharing continued to 2fl level contrary to plan which show to 1 fl only .2 and 10 and 3 and 10 transfer beams not installed w8 and

    Apr 26, 2000 · Penalty $500

    Active
  • Non-hazardous

    Failure to maintain adequate housekeeping : noted: work in progress at cellar level thru 1fl ceiling .under permit # 102831731 for structural work .cellar level thru 1 fl .floors walls open level public hallway

    Apr 26, 2000 · Penalty $350

    Active
  • Non-hazardous

    No tanant safety plan, noted: structural work in progress under permit # 102831731 cellar thru 1 fl with upper floors occupied with tenants , no tenant safety plan available .remedy: provide a tenant safety pla

    Apr 26, 2000 · Penalty $200

    Active
  • Non-hazardous

    Work wihtout a oermit- 15% of work done noted: entire demo and removal of interior partition walls and ceiling and walls stripped to studs and firerating removed at basement level entire and 1fl entire 2nd floo

    Jan 21, 2000 · Penalty $500

    Resolve
  • Hazardous

    Failure to maintain building. noted: at roof level west side front chimney leaning inward out of plumb approx. 6". 2) at west side para- pet wall approx. 30' section leaning inward w/ bulging brickwork at

    Mar 26, 1999 · Penalty $800

    Resolve
  • Hazardous

    Failure to maintain bldg exterior. noted: at roof level east side chimney leaning out of plumb (outward) ranging approx 8"x12". west side front chimney leaning inward out of plumb approx 6".

    Dec 30, 1998 · Penalty $800

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Dec 20, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 6, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 4, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 12, 2021 · Apt 12

    Close
  • Door/window

    Window frame

    Feb 7, 2021 · Apt 18

    Close
  • Door/window

    Door

    Feb 7, 2021 · Apt 18

    Close
  • Heat/hot water

    Apartment only

    Mar 12, 2018 · Apt 19

    Close
  • Nonconst

    Vermin

    Nov 1, 2011 · Apt 21

    Close
  • Plumbing

    Toilet

    Nov 1, 2011 · Apt 21

    Close
  • Electric

    Wiring

    Nov 1, 2011 · Apt 21

    Close
Show 10 more ↓
  • Paint/plaster

    Wall

    Nov 1, 2011 · Apt 21

    Close
  • Nonconst

    Vermin

    Nov 1, 2011 · Apt 21

    Close
  • Plumbing

    Water-leaks

    May 2, 2009 · Apt 7

    Close
  • Electric

    Lighting

    May 2, 2009 · Apt 7

    Close
  • Nonconst

    Vermin

    May 2, 2009 · Apt 7

    Close
  • Paint/plaster

    Wall

    May 2, 2009 · Apt 7

    Close
  • Heating

    Heat related

    Mar 27, 2007 · Apt 19

    Close
  • Heating

    Heat related

    Mar 22, 2007 · Apt 19

    Close
  • Plumbing

    Radiator

    Mar 5, 2007 · Apt 19

    Close
  • Plumbing

    Radiator

    Mar 5, 2007 · Apt 19

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1878
Floors
5
Residential units
22
Building area
12,045 ft²
Lot area
2,880 ft²
Zoning
R8B
Community board
103
Council district
2
Block / lot
459 / 12
Assessed value
$2,597,400
Landmark / historic district
East Village / Lower East Side Historic District

HPD registration #107448, last renewed Jul 14, 2026.

Questions about 54 East 4 Street

Who owns 54 East 4 Street?

The owner of record in NYC Department of City Planning PLUTO data is East Manhattan Holdings LLC.

Does 54 East 4 Street have violations?

Yes. NYC HPD has recorded 7 housing violations at this property.

Is 54 East 4 Street rent stabilized?

NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2020 (about 5% of its 22 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 54 East 4 Street built?

City records list 1878 as the year it was built.

How many apartments are in 54 East 4 Street?

It has 22 residential units and 24 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.