roofy

319 East 9 Street

Manhattan, NY 10003BBL 1-00451-0052Map

Owner of record: Thermald Realty Associates I, L.p.

319 East 9 Street is a walk-up apartment building built in 1900 in Manhattan, 10003. It has 12 residential units across 4 floors. The owner of record is Thermald Realty Associates I, L.p.. HPD has recorded 15 housing violations here, most recently on November 17, 2025. 13 of the 15 most recent violations are still open. City tax records listed 3 rent-stabilized apartments here in 2024.

HPD violations
15
DOB violations
0
ECB violations
9
HPD complaints
60

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Nov 17, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
3
About 25% of the building's 12 apartments
Down from 4 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 15

  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Closed — Violation dismissed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum of 100 watts as required (light fixture(s) present). at front areaway

    May 5, 2019

    Closed — Violation dismissed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 2, 1st story, 1st apartment from north at east

    Jan 23, 2014 · Apt 2

    Open — First no access to re- inspect violation
  • B

    Replace with new the broken or defective radiator air valve in the kitchen located at apt 2, 1st story, 1st apartment from north at east

    Jan 23, 2014 · Apt 2

    Open — First no access to re- inspect violation
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 2, 1st story, 1st apartment from north at east

    Jan 23, 2014 · Apt 2

    Open — Nov certified late
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at north wall, in the 2nd room from north located at apt 3, 1st story, 1st apartment from west at north

    Apr 17, 2007 · Apt 3

    Open — First no access to re- inspect violation
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3, 1st story

    Jul 15, 2006 · Apt 3

    Open — First no access to re- inspect violation
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3, 1st story

    Jul 15, 2006 · Apt 3

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at apt 3, 1st story

    Jul 15, 2006 · Apt 3

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north located at apt 3, 1st story

    Jul 15, 2006 · Apt 3

    Open — First no access to re- inspect violation
Show 5 more ↓
  • B

    Properly repair the broken or defective paving rear yard at east , 1st story

    Jul 15, 2006

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective ceramic tile at public hall, 1st story

    Jul 15, 2006

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 1st room from north located at apt 3, 1st story

    Jul 15, 2006 · Apt 3

    Open — First no access to re- inspect violation
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3, 1st story, 1st apartment from west at north

    Nov 4, 2005 · Apt 3

    Open — Nov certified late
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3, 1st story, 1st apartment from west at north

    Nov 4, 2005 · Apt 3

    Open — Nov certified late

DOB building violations · 0

No DOB violations on record

ECB violations · 9

  • Class - 3

    B354,16,32a,15,2b,38.

    Sep 15, 2009 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to maintain in that granite stones @ raer yard near metal steps are cracked broke & defective rear yard draw @ rear of yd is cloggedwith debris & dirt preventing water to drain from yd note:granite

    Sep 15, 2006 · Penalty $350

    Resolve
  • Non-hazardous

    Failure to maintain bldg.in that drain at rear yard cellar level at steps has been covered over w/dirt & debris leader at rear east is not properly connected & is underminning a portion of yard @ steps entrance

    Jul 17, 2006 · Penalty $180

    Resolve
  • Non-hazardous

    Failure to maintain building- in that water is leaking into the basements store fronts, water and mud found at rear of basement at time of inspection, due to heavy rain. remedy: make all required repairs to

    Oct 14, 2005 · Penalty $2,500

    Resolve
  • Non-hazardous

    Altered bldg occupied w/o a valid c of o. noted: bldg altered under alt #101611784 apt at 2nd fl front west side occupied prior to issuance of c of o. remedy: discontinue illegal use, obtain a valid c

    Jun 8, 1999

    Resolve
  • Non-hazardous

    Work w/o a permit. noted: at cellar level corridor eastside excavationcreating a trench approx 2 1/2'x10'. work approx 25% completed. remedy: stop all work, obtain all necessary permits, make area safe.

    Jun 4, 1999

    Resolve
  • Hazardous

    Exit passager total obstuctuction noted egress to area of refuge from rear side fire escape obstructed 1 w/no acess to agj property resr yard less than 30 excavation at cellar corridor 4 illegal laurdry device

    Jun 4, 1999

    Resolve
  • Non-hazardous

    Fialure to provide approved plans at premises at time of inspection. noted: no approved plans at premises at time of inspection for permit #101611784. remedy: stop all work, make area safe, provide approved

    Apr 22, 1999

    Resolve
  • Hazardous

    Exit passageway: total obstruction. noted: removal of portion of in- terior 2/3rd staircase. 2) construction debris at various locations inpublic hallway. no approved plans/no tenant safety plan. remedy: stop

    Apr 22, 1999

    Resolve

Complaints

  • Heating

    Heat related

    Feb 11, 2014 · Apt 2

    Close
  • Heating

    Heat related

    Jan 26, 2014 · Apt 9

    Close
  • Heating

    Heat related

    Jan 23, 2014 · Apt NA

    Close
  • Heating

    Heat-plant

    Jan 17, 2014 · Apt 2

    Close
  • Plumbing

    Toilet

    Jan 17, 2014 · Apt 2

    Close
  • Plumbing

    Radiator

    Jan 17, 2014 · Apt 2

    Close
  • Heating

    Heat related

    Jan 17, 2014 · Apt 2

    Close
  • General

    Doors

    Jan 10, 2014 · Apt BLDG

    Close
  • Heating

    Heat related

    Jan 10, 2014 · Apt NA

    Close
  • Plumbing

    Water-leaks

    Jan 5, 2014 · Apt 7A

    Close
Show 40 more ↓
  • Heating

    Heat related

    Jan 4, 2014 · Apt NA

    Close
  • Heating

    Heat related

    Jan 1, 2014 · Apt 9

    Close
  • Heating

    Heat related

    Dec 13, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Dec 12, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Dec 4, 2013 · Apt 5

    Close
  • Heating

    Heat related

    Feb 10, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Feb 8, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Jan 23, 2012 · Apt 7A

    Close
  • Heating

    Heat related

    Sep 8, 2009 · Apt BLDG

    Close
  • Heating

    Heat related

    Sep 5, 2009 · Apt 3

    Close
  • General

    Doors

    Sep 4, 2009 · Apt 3

    Close
  • General

    Ceramic-tile

    Jul 10, 2007 · Apt 3

    Close
  • General

    Floor

    Jul 10, 2007 · Apt 3

    Close
  • Paint/plaster

    Wall

    Jul 10, 2007 · Apt 3

    Close
  • Plumbing

    Water-leaks

    Jul 10, 2007 · Apt 3

    Close
  • Plumbing

    Water-leaks

    May 14, 2007 · Apt 3

    Close
  • General

    Mold

    May 14, 2007 · Apt 3

    Close
  • Plumbing

    Water-leaks

    May 14, 2007 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    May 14, 2007 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    May 14, 2007 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    May 14, 2007 · Apt 3

    Close
  • Paint/plaster

    Wall

    May 14, 2007 · Apt 3

    Close
  • General

    Mold

    Apr 13, 2007 · Apt 3

    Close
  • General

    Mold

    Mar 23, 2007 · Apt 3

    Close
  • General

    Mold

    Mar 23, 2007 · Apt 3

    Close
  • Heating

    Heat related

    Jan 18, 2007 · Apt 3

    Close
  • Heating

    Heat related

    Dec 20, 2006 · Apt 3

    Close
  • Heating

    Heat related

    Dec 12, 2006 · Apt 3

    Close
  • Heating

    Heat related

    Dec 11, 2006 · Apt 3

    Close
  • Heating

    Heat related

    Oct 26, 2006 · Apt 3

    Close
  • Nonconst

    Carbon monoxide

    Jul 13, 2006 · Apt 3

    Close
  • Nonconst

    Smoke detector

    Jul 13, 2006 · Apt 3

    Close
  • Plumbing

    Water-leaks

    Jul 13, 2006 · Apt 3

    Close
  • Plumbing

    Water-leaks

    Jul 13, 2006 · Apt 3

    Close
  • Heating

    Heat related

    Oct 26, 2005 · Apt 3

    Close
  • Nonconst

    Vermin

    Sep 12, 2005 · Apt 6

    Close
  • Heating

    Heat related

    Feb 5, 2005 · Apt 3

    Close
  • Heating

    Heat related

    Feb 5, 2005 · Apt BASE

    Close
  • Heating

    Heat related

    Feb 3, 2005 · Apt 00

    Close
  • Heating

    Heat related

    Jan 23, 2005 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1900
Floors
4
Residential units
12
Building area
7,536 ft²
Lot area
2,306 ft²
Zoning
R8B
Community board
103
Council district
2
Block / lot
451 / 52
Assessed value
$1,021,500
Landmark / historic district
No

HPD registration #113050, last renewed Nov 21, 2025.

Questions about 319 East 9 Street

Who owns 319 East 9 Street?

The owner of record in NYC Department of City Planning PLUTO data is Thermald Realty Associates I, L.p..

Does 319 East 9 Street have violations?

Yes. NYC HPD has recorded 15 housing violations at this property.

Is 319 East 9 Street rent stabilized?

NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 25% of its 12 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 319 East 9 Street built?

City records list 1900 as the year it was built.

How many apartments are in 319 East 9 Street?

It has 12 residential units and 14 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.