341 East 6 Street
Manhattan, NY 10003BBL 1-00448-0035Map
Owner of record: 341 East 6th Street LLC
341 East 6 Street is a walk-up apartment building built in 1852 in Manhattan, 10003. It has 20 residential units across 5 floors. The owner of record is 341 East 6th Street LLC. HPD has recorded 397 housing violations here, most recently on January 4, 2026. 4 of the 50 most recent violations are still open. City tax records listed 17 rent-stabilized apartments here in 2024.
- HPD violations
- 397
- DOB violations
- 24
- ECB violations
- 25
- HPD complaints
- 214
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 397
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latchset at vestibule door
Jan 4, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door leading to north yard at public hall, 1st story
Jan 4, 2026
Open — Nov sent out - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing detatched top return rail at southeast corner of 3rd story balcony at 1st fire escape from east at south at fire escape
Aug 7, 2025
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing detatched top return rail at southwest corner of 4th story balcony at 1st fire escape from east at south at fire escape
Aug 7, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the kitchen located at apt 1c, 1st story, 1st apartment from south at west
Jul 25, 2025 · Apt 1C
Open — Invalid certification - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1b, 2nd story, 1st apartment from north at east
Jul 18, 2025 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective defective latch and latch assembly at building front entrance at public hall, 1st story
Jun 1, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story
Feb 25, 2025
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories, all balconies, and all components at building front at 1st fire escape from east at south
Aug 30, 2023
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing hook and latch installed on bottom of vestibule door at public hall, 1st story
Apr 23, 2023
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story
Apr 5, 2023
Open — Violation will be reinspected - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door to rear yard , 1st story
Apr 5, 2023
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening panic bar installed on bulkhead door preventing re-entry into the public hall , 5th story
Apr 5, 2023
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at the ceiling in the closet at west wall.. in the kitchen located at apt 4a, 5th story, 1st apartment from east at south
Jan 19, 2023 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling at the closet at west wall in the kitchen located at apt 4a, 5th story, 1st apartment from east at south
Jan 19, 2023 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 4d, 4th story, 1st apartment from north at east
Dec 20, 2022 · Apt 4D
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 4d, 4th story, 1st apartment from north at east
Dec 20, 2022 · Apt 4D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 4d, 4th story, 1st apartment from north at east
Dec 20, 2022 · Apt 4D
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 4d, 4th story, 1st apartment from north at east
Dec 20, 2022 · Apt 4D
Closed — Violation dismissed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 1b, 2nd story, 1st apartment from west at north
May 31, 2022 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 2nd story, 1st apartment from west at north
May 31, 2022 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Refit door in the entrance located at apt 1b, 2nd story, 1st apartment from west at north
May 31, 2022 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing located at apt 1b, 2nd story, 1st apartment from west at north
May 31, 2022 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1b, 2nd story, 1st apartment from west at north
May 31, 2022 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective lower sash counter balance at east wall window in the bathroom located at apt 4a, 4th story, 1st apartment from east at south
May 27, 2022 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... 1 sqft. at ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from east at south
May 27, 2022 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroom located at apt 4a, 4th story, 1st apartment from east at south
May 27, 2022 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story
May 25, 2022
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of house hold items, bicycle and construction materials at public hall, 1st story
May 25, 2022
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all balconies, all stories, front stack at fire escape
May 17, 2022
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate ... in the entire apartment located at apt b, 1st story, 1st apartment from north at east
May 17, 2022 · Apt B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement
May 17, 2022
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees fahrenheit at all hot water fixture at sink in the kitchenette located at apt 4d, 5th story, 1st apartment from west at north
May 17, 2022 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective leading to rear yard at public hall, 1st story
May 17, 2022
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story
May 17, 2022
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of construction materials at public hall, 1st story
May 17, 2022
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective bell, return buzzer and intercom system from front building entrance door to apartment in the entire apartment located at apt b, 1st story, 1st apartment from north at east
May 17, 2022 · Apt B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt b, 1st story, 1st apartment from north at east
May 17, 2022 · Apt B
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective bell, return buzzer and intercom system from front building entrance door to apartment in the entire apartment located at apt 4d, 5th story, 1st apartment from west at north
May 17, 2022 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing metal bottom rail at 5th story balcony at building front
May 3, 2022
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at bulkhead
May 3, 2022
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door .... in the entrance located at apt 1c, 2nd story, 1st apartment from south at west
May 3, 2022 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door ... in the entrance located at apt 4b, 5th story, 1st apartment from north at east
May 3, 2022 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 5th story
Sep 29, 2021
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt 4d, 5th story, 1st apartment from west at north
Sep 29, 2021 · Apt 4D
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story
Sep 29, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story
Sep 29, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from north located at apt 4d, 5th story, 1st apartment from west at north
Sep 29, 2021 · Apt 4D
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective paving at rear yard at north
Sep 8, 2021
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story
Sep 8, 2021
Closed — Violation dismissed
DOB building violations · 24
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 16, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 22, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 1, 2021
Dob violation - dismissed - Construction other optional
Ftm bldg safe cond:all flrs sagged down towrds central stair case;door frmes to apts in pblc stair hall rack@all flrs,intr partns w/crkd fins expd in ceil of apt 1a,3fl joist failed w/splits in wd.see dob 042219 ownr retn nyspe-eval entr bldg&dob reg contr-rpr undr prmt.subm rpt by 8/6/21.subm dwg rprsby 8/20/21.fil app 9/1/21 bgn 12/1/21.cmplt 6/1/22
Jul 30, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 9, 2019
Dob violation - dismissed - Construction other optional
Ftm:all flrs racked down towards the central staircase/hall,door frams to apts in pub stair hall rack@all flrs,int part crack due to sagging flrs.roof leaks above hall&apts.rear part of bldg appear to lean twrds exp4 gap btwn exp2 wall&adj bldg.bulge@exp4 wall.own retain pe to eval entire bldg&develp comp repr plans&repr bldg und prmt.file plan 8/1/19
Apr 22, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed
Show 14 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 25
- Class - 2
Lighting not provided under sidewalk shedprovided lighting dusk-dawn
Jul 18, 2022 · Penalty $2,400
Resolve - Class - 1
Work w/o permit.note:at time of inspection observed pipe scaffold built from ground to 5th story job already started winding out the mortal joints at exp #3 (rear yard) scaffold well over 40 feet no permit foun
Apr 12, 2022 · Penalty $625
Resolve - Class - 2
At time of inspection observed stored roofing materials membrane, cement board, styrofoam insulation inadequate manner. all materials exposed no roof protection underneath, loose & flyable with high wind., repa
Apr 7, 2022
Resolve - Class - 2
Failure to comply w/the commissioner's order contained in summons/violation #35631994y issued on 12/17/21 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.failure to maintain bldg in co
Feb 24, 2022 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code-compliant manner.note at rear of building exp#3 the gutter from roof is disconnect near the top creating a potential hazard of falling water.also the rear facade is in disre
Dec 17, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#35592083y issued on 9/25/21 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.no c/of/o on file.remedy:c
Nov 6, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to maintain bldg in codecompliant manner.atoi observed damageddrain pipe@exp3@top level pipe connection missing,cracked missing stucco&missing mortar joint&exposed brick on nearest wall surface.repair &
Sep 25, 2021 · Penalty $3,125
Resolve - Class - 1
Work without permit. note:at time of inspection,observed demolition work in unit 1a (removal of firestopping from ceiling and perimeter walls) with no permit filed for the performed work. remedy:file for permit
Aug 18, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/v39042073j issued5/26/21 &to file c/c pursuant to28-201.1&1rcny102-01.comply w/commissioner's order &/or file c/c.
Jul 31, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code compliant manner.no firestopping note:at time of inspection observed firestopping on ceiling of unit*(1a)on the second floor removed and not replaced causing immediate dange
Jul 27, 2021 · Penalty $2,500
Resolve
Show 15 more ↓
- Class - 2
Failure to maintain building in code compliant manner. no firestoppingper bc 712.3,27-345. at the time of inspection,i observed missing fireprotection on the ceiling,approx 30% and missing fire protection in th
Jul 13, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in a code compliant manner. at time of inspection, observed damaged drain pipe at exposure #3, cracked/missing stucco along with missing mortar joint around the exposed brick on the
May 26, 2021 · Penalty $1,250
Resolve - Class - 2
No shut off on fuel oil supply valve ; correct all violating conditions, submit a certificate of correction.
Feb 4, 2020 · Penalty $625
Resolve - Class - 3
Failure to maintain bld. in code compliant manner,at time of inspection,noted:minor damage to floors 1-5 @ceiling from water penetration & (broken)chipped steps,@staircase at 2nd/3rd floor.rem:repair/replace.
Jul 1, 2019 · Penalty $250
Resolve - Class - 1
Failure to maintain building in code compliant manner.noted: staircaseof building in severe disrepair with cracked floor on all levels 5th floor is sagging 2 inches on 4 foot span,wall plaster on first
Apr 17, 2019 · Penalty $3,125
Resolve - Class - 2
Failure to maintain building in code compliant manner.noted: gutter detached in rear of building exp 3 east side of building on 4th fl level and broken pieces of gutter on 1st floor level pavers in rear
Apr 17, 2019 · Penalty $1,562
Resolve - Class - 2
Failure to comply w/ commissioner's order contained in summons/violation#35250319l issued on 4/20/18,and to file a certificate of correctionpursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certificate
Feb 14, 2019 · Penalty $1,250
Resolve - Class - 2
Work without a permit. work noted inspection conducted construction work done on 3rd story apartment #3 partition removed new gypsum board installed. new bx wires, electric panel box, wall outlets and light swi
Apr 20, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to maintain bldg in a code-compliant manner. noted: @ the rearexposure the chimney has broken off and fallen. chimney does not reachthe roof level. remedy: maintain bldg.
May 12, 2011 · Penalty $2,500
Resolve - Class - 3
Failure to maintain bldg in a code compliant mannernoted:at street facing elevation 5th fl west top window glazing shattered with shards loose and in danger of falling to street and sidewalk.remedy:make safe
Apr 25, 2010 · Penalty $500
Resolve - Hazardous
Failure to maintian exterior building wall : noted (1) the east exterior wall is bulging approx 2" at center of bulge which starts at the second fland extends to the fifth floor. (2) also noted the stucco is lo
Nov 19, 2002 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior building wall.noted:tenent lowering a/c unit from top level of rear fire escape fell whom fire escape railing broke loose.rem:make all necessary reparis immediately throughout entir
Nov 14, 2000 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain.defect is:rear fire escape 5fl railing collpsed.fire escape rotted and defective.no rails or pertection entire rear roof.rem:immediately repair and replace defective fire escape provide safe
Nov 11, 2000
Resolve - Non-hazardous
Failure to provide approved plans at premises at time of inspection.note:permit #102880866 on file. new sheetrock ceilings and sheetrock walls in progress at 5th fl. west rear apt. replacikng removal lathe &
May 18, 2000 · Penalty $130
Active - Non-hazardous
Work without a permit; approx 30% of work done . note; reconstruction of firerated shaft without any permits or approval from this department . location : cellar thru roof shaft remedy: stop all work ,obtain pe
Mar 30, 2000
Resolve
Complaints
- Electric
Outlet/switch
Jun 1, 2026 · Apt 1C
Close - Unsanitary condition
Garbage/recycling storage
Feb 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 1, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 20, 2025 · Apt 2C
Close - Heat/hot water
Entire building
Dec 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 20, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt 3B
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 7, 2025 · Apt BLDG
Close - General
Bell/buzzer/intercom
May 23, 2025 · Apt 4DA
Close - General
Bell/buzzer/intercom
May 15, 2025 · Apt MAINDO
Close - Heat/hot water
Entire building
Feb 21, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 24, 2024 · Apt BLDG
Close - General
Bell/buzzer/intercom
Oct 26, 2023 · Apt 2A
Close - General
Bell/buzzer/intercom
Oct 18, 2023 · Apt 2A
Close - Water leak
Slow leak
Aug 4, 2023 · Apt 4A
Close - Electric
No lighting
Apr 4, 2023 · Apt 4D
Close - Door/window
Door
Apr 4, 2023 · Apt 2C
Close - General
Bell/buzzer/intercom
Apr 4, 2023 · Apt 1B
Close - Unsanitary condition
Pests
Apr 4, 2023 · Apt 1B
Close - Unsanitary condition
Pests
Apr 4, 2023 · Apt 1B
Close - Outside building
Roofing
Apr 4, 2023 · Apt BLDNG
Close - Safety
Fire escape
Apr 4, 2023 · Apt BLDNG
Close - Flooring/stairs
Floor
Mar 16, 2023 · Apt GROUND
Close - Unsanitary condition
Garbage/recycling storage
Mar 12, 2023 · Apt BLDG
Close - Electric
Power outage
Jan 26, 2023 · Apt WHOLEB
Close - Electric
Power outage
Jan 26, 2023 · Apt BLDG
Close - Water leak
Slow leak
Dec 27, 2022 · Apt 4A
Close - Heat/hot water
Apartment only
Dec 25, 2022 · Apt 3D
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt BLDG
Close - Water leak
Damp spot
Dec 16, 2022 · Apt TOPFLO
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1852
- Floors
- 5
- Residential units
- 20
- Building area
- 10,860 ft²
- Lot area
- 2,835 ft²
- Zoning
- R8B
- Community board
- 103
- Council district
- 2
- Block / lot
- 448 / 35
- Assessed value
- $519,300
- Landmark / historic district
- East Village / Lower East Side Historic District
HPD registration #107621, last renewed Aug 12, 2025.
Questions about 341 East 6 Street
Who owns 341 East 6 Street?
The owner of record in NYC Department of City Planning PLUTO data is 341 East 6th Street LLC.
Does 341 East 6 Street have violations?
Yes. NYC HPD has recorded 397 housing violations at this property.
Is 341 East 6 Street rent stabilized?
NYC Department of Finance tax bills listed 17 rent-stabilized units here in 2024 (about 85% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 341 East 6 Street built?
City records list 1852 as the year it was built.
How many apartments are in 341 East 6 Street?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.