113 1 Avenue
Manhattan, NY 10003BBL 1-00448-0027Map
Owner of record: 113 First Avenue Partners LLC
113 1 Avenue is a walk-up apartment building built in 1920 in Manhattan, 10003. It has 8 residential units across 5 floors. The owner of record is 113 First Avenue Partners LLC. HPD has recorded 77 housing violations here, most recently on July 21, 2026. 6 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 77
- DOB violations
- 9
- ECB violations
- 29
- HPD complaints
- 35
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 77
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame in the entrance located at apt 7, 5th story, 2nd apartment from west at north
Jul 21, 2026 · Apt 7
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Jul 13, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Apr 19, 2026 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Apr 19, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Jan 16, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 7, 5th story, 2nd apartment from west at north
Jan 16, 2026 · Apt 7
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4, 3rd story, 1st apartment from west at north
Jan 16, 2026 · Apt 4
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story, 2nd apartment from west at north
Oct 14, 2025 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7, 5th story, 2nd apartment from west at north
Oct 14, 2025 · Apt 7
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at rang in the kitchen located at apt 1, 2nd story, 1st apartment from east at south
Feb 27, 2025 · Apt 1
Open — First no access to re- inspect violation
Show 40 more ↓
- CImmediately hazardous
Remove device preventing door from being self-closing kick stand at door leading to basement at public hall, 1st story
Feb 14, 2025
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3, 3rd story, 2nd apartment from west at north
Feb 14, 2025 · Apt 3
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3, 3rd story, 2nd apartment from west at north
Feb 14, 2025 · Apt 3
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3, 3rd story, 2nd apartment from west at north
Feb 14, 2025 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5a, 4th story, 1st apartment from west at north
Feb 14, 2025 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked to basement at boiler room
Feb 14, 2025
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5a, 4th story, 1st apartment from west at north
Feb 14, 2025 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system to locked door at boiler room
Feb 10, 2025
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3, 3rd story, 2nd apartment from west at north
Feb 10, 2025 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on the door in the entrance located at apt 7, 5th story, 2nd apartment from west at north
Feb 10, 2025 · Apt 7
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective 20 amp circuit breaker for room # 2 at box at south wall in the 1st room from north located at apt 3, 3rd story, 2nd apartment from west at north
Feb 10, 2025 · Apt 3
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures to range in the kitchen located at apt 3, 3rd story, 2nd apartment from west at north
Feb 10, 2025 · Apt 3
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of gas to the fixtures to the range in the kitchen located at apt 7, 5th story, 2nd apartment from west at north
Feb 10, 2025 · Apt 7
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7, 5th story, 2nd apartment from west at north
Feb 10, 2025 · Apt 7
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 7, 5th story, 2nd apartment from west at north
Feb 10, 2025 · Apt 7
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5a, 4th story, 2nd apartment from west at north
Feb 5, 2025 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5a, 4th story, 2nd apartment from west at north
Feb 5, 2025 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5a, 4th story, 2nd apartment from west at north
Feb 5, 2025 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of a hook and eye device installed at building entrance door
Feb 5, 2025
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of a hook and eye device installed at vestibule door at public hall, 1st story
Feb 5, 2025
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of a kick stand device installed at fire door leading to yard at south at public hall, 1st story
Feb 5, 2025
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration ..gas range converted to electric range in the kitchen located at apt 5a, 4th story, 2nd apartment from west at north
Feb 5, 2025 · Apt 5A
Open — Not complied with - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar at boiler room
Feb 5, 2025
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 3, 3rd story, 2nd apartment from west at north
Feb 5, 2025 · Apt 3
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3, 3rd story, 2nd apartment from west at north
Feb 5, 2025 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story, 2nd apartment from west at north
Feb 5, 2025 · Apt 3
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 3rd story, 2nd apartment from north at east
Apr 3, 2019 · Apt 3
Closed — Violation closed - BHazardous
Properly secure the loose wash basin in the bathroom located at apt 3, 3rd story, 2nd apartment from north at east
Apr 3, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective porcelean enamel glaze at bathtub in the bathroom located at apt 3, 3rd story, 2nd apartment from north at east
Apr 3, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings ,walls and trim in the entire apartment located at apt 3, 3rd story, 2nd apartment from north at east
Apr 3, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 3rd story, 2nd apartment from north at east
Apr 3, 2019 · Apt 3
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3, 3rd story, 2nd apartment from north at east
Apr 3, 2019 · Apt 3
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3, 3rd story, 2nd apartment from north at east
Apr 3, 2019 · Apt 3
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3, 3rd story, 2nd apartment from north at east
Apr 3, 2019 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color holes at ceiling s in the entire apartment located at apt 3, 3rd story, 2nd apartment from north at east
Apr 3, 2019 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color holes at walls in the entire apartment located at apt 3, 3rd story, 2nd apartment from north at east
Apr 3, 2019 · Apt 3
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in at wash basin and bathtub waste line in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
Apr 3, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the entire apartment located at apt 3, 3rd story, 2nd apartment from north at east
Apr 3, 2019 · Apt 3
Closed — Violation closed
DOB building violations · 9
- Immediate emergency anythingoptional
Remedy: provide approximately 75 linear feet of sidewalk.shed along exposure #1 to safeguard.pedestrians and protect adjacent property from.potential falling debris. measurement includes required code-comp liant end extensions
Jun 1, 2026
Dob violation - dismissed - Construction other optional
Failure to maintain bldg in code compliant manner. atoi observed 5' x 4' brick wall section fallen onto sidewalk submit engineer's report to [email protected] evaluatin g conds w/pics and repair timeframe within 4 days
May 30, 2026
Dob violation - active - Construction other optional
Structure rendered non-complaint due to 84 east 7 street wall in disrepair with stucco fallen into court yard area.
May 30, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 10, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 10, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Plumbing none
P-plumbing none
Oct 18, 1991
Dob violation - dismissed
ECB violations · 29
- Class - 1
Failure to maintain building in code-compliant manner. as noted: at time of inpsection observed at exo #1 a section of brick veneer approx 5' x 4' that has fallen onto the sidewalk. fd on site has closed street
May 30, 2026 · Penalty $12,530
Active - Class - 2
Work without a permit. outdoor advertising sign "find me on bumble", 1st sign on left facing east 7th street. advertising panel installed under dob job 123859761 is not a window. remedy: obtain all permits.
Oct 6, 2025 · Penalty $1,250
Active - Class - 2
Work without a permit. outdoor sign with bumble advertising slogan "looking for someone to bring calm to the ny chaos". 2nd sign from the left facing east 7th street. advertising panel installed under dob job 1
Oct 6, 2025 · Penalty $1,250
Active - Class - 2
Work without a permit. outdoor advertising sign, "find me on bumble". 3rd sign from the left facing east 7th street. advertising panel installed under dob job 123859761 is not a window. remedy: obtain all permi
Oct 6, 2025 · Penalty $1,250
Active - Class - 2
Work without a permit. outdoor sign with bumble advertising slogan "dating in new york is a constant adventure". 4th sign from the left facing east 7th street. advertising panel installed under dob job 12385976
Oct 6, 2025 · Penalty $1,250
Active - Class - 2
Work wihout a permit. outdoor advertising sign "find me on bumble" 5thsign from fleft facing east 7th street. advertising panel installed under dob job 123859761 is not a window. remedy: obtain all permits.
Oct 6, 2025 · Penalty $1,250
Active - Class - 2
Work without a permit. outdoor advertising sign with bumble slogan. 6th sign from the left facing east 17th street. advertising panel installed under job 123859761 is not a window. remedy: obtain all permits.
Oct 6, 2025 · Penalty $1,250
Active - Class - 2
Prohibited sign in c2-5 zoning district with bumble advertising slogan. 6th sign from the left facing east 7th street. advertising panel installed under dob ob 123859761 is not a window. remedy: remove or legal
Oct 6, 2025 · Penalty $800
Active - Class - 2
Prohibited sign in c2-5 zoning district advertising "find me on bumble". 7th sign on left facing east 7th street. advertisng panel installedunder dob job 123859761 is not a window. remedy: remove of legalize si
Oct 6, 2025 · Penalty $800
Active - Class - 2
Work without a permit. outdoor advertising sign "find me on bumble", 7th sign on left facing east 7th street. advertising panel installed under dob job 123859761 is not a window. remedy: obtain all permits.
Oct 6, 2025 · Penalty $1,250
Active
Show 19 more ↓
- Class - 2
Prohibited sign in c2-5 zoning district advertising "find me on bumble". 1st sign on left facing east 7th street. advertisng panel installedunder dob job 123859761 is not a window. remedy: remove of legalize si
Oct 6, 2025 · Penalty $800
Active - Class - 2
Prohibited sign in c2-5 zoning district advertising slogan "looking for someone to bring cal to the ny chaos". 2nd sign from the left facing, east 7th street. advertising panel installed a under job 123859761 i
Oct 6, 2025 · Penalty $800
Active - Class - 2
Prohibited sign in c2-5 zoning district advertising "find me on bumble". 3rd sign on left facing east 7th street. advertisng panel installedunder dob job 123859761 is not a window. remedy: remove of legalize si
Oct 6, 2025 · Penalty $800
Active - Class - 2
Prohibited sign in c2-5 zoning district advertising "find me on bumble". 5th sign on left facing east 7th street. advertisng panel installedunder dob job 123859761 is not a window. remedy: remove of legalize si
Oct 6, 2025 · Penalty $800
Active - Class - 2
Prohibited sign in c2-5 zoning district with bumble advertising slogan"dating in new york is a constant adventure". 4th sign from the left facing east 7th street. advertising panel installed under dob job 12385
Oct 6, 2025 · Penalty $800
Active - Class - 3
Work w/o permit-on exposure four(4)-7th st. at the time of inspection and review of conditions,i observed an outdoor display panel or steel framing attached to the building and projecting more than four(4)" at
Oct 28, 2020
Resolve - Class - 2
Work without a permit. noted, at the time of inspection observed erect of separate metal black frame for new advertising cabinet projected around 6'' out of the property line on the side walk, work done 40 % wi
Dec 2, 2019
Resolve - Class - 2
Work does not conform to approved construction documents and/or amendments. noted, at time of inspection observed the facade bearing wall should be supported by steel columns 4'' *4''*0.5 each and top steel ang
Dec 2, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to comply with commissioner order contained in summons/violat on#39005785p issued on 07-17-2019 and to file certificate of correc ion pursuant to 28-201.1 and 1rcny 102-01.comply with commissioners or
Oct 4, 2019
Resolve - Class - 2
Failure to maintain work area in safe condition. a full stop work order issued for front facade demo done approx. 30'-0" x 8'-0" area without permit. workers left work area with debris, exposed/unprotected and
Jul 25, 2019 · Penalty $312
Resolve - Class - 1
Observed approx. 30'-0" x 8'-0" and 7" deep area masonry facade wall removed in 1st floor level to create storefront at expo # 01 along east 7th street without a permit. installed no shoring to hold overhang br
Jul 17, 2019
Resolve - Class - 2
Work without a permit. noted, at the time of inspection observed in the commercial store in the 1st. floor installed ac unit with exposed metal ducts and electric connections without permit. work done 100 %., o
Jul 1, 2019 · Penalty $1,250
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments; noted, at the time of inspection observed construction work under job #123859761 for the store front renovation but the plans
Jun 4, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to provide approved / accepted construction documents at job site at time of inspection; noted, at the time of inspection observed construction work under job# 123859761 inside and outside the commercia
Jun 4, 2019 · Penalty $625
Resolve - Class - 2
Work w/o permit. noted in commercial space on 1st floor at corner of building (1st av and e 7 st) observed new store front with new metal frames installed at 2 sides w/o permit. size apprx: 18'l x 8'h at 1st
Jan 29, 2018
Resolve - Class - 3
Work w/o permit. front facade at 2nd fl double face projecting sign approx 2feet in diameter(the cafe)also noted: street level storm inclosure projecting across the street line approx 3feet. as per 3202.4.2
Dec 22, 2017 · Penalty $230
Resolve - Class - 1
Filed a certificate from application etc. containig a material false statement. noted: on application #122366386 pw-1(plan/work application)sec 26 regarding owners certification occupied housing: marked"no"in
Nov 18, 2015 · Penalty $4,800
Resolve - Class - 1
Filed a certificate from application etc containing a materials false statement. noted: on appl#121873080 pw-1(plan/work application)section26 regarding owners certification occupied housing. marked"no"in all
Nov 18, 2015
Resolve - Class - 2
Work w/o a permit. note: at time of inspection observed a new diamond electric cook top w/exhaust hood which is connected to a metal duct. the metal duct is erected along the entire front and section of side
Jun 8, 2013 · Penalty $800
Resolve
Complaints
- Electric
No lighting
Apr 23, 2026 · Apt BLDG
Close - Electric
No lighting
Apr 23, 2026 · Apt BLDG
Close - Plumbing
Water supply
Mar 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 26, 2025 · Apt BLDG
Close
Show 25 more ↓
- Heat/hot water
Apartment only
Feb 26, 2025 · Apt 5A
Close - Heat/hot water
Entire building
Feb 26, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 25, 2025 · Apt 5A
Close - Heat/hot water
Apartment only
Feb 25, 2025 · Apt 5A
Close - Heat/hot water
Apartment only
Feb 12, 2025 · Apt 5A
Close - Heat/hot water
Entire building
Feb 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 11, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 8, 2025 · Apt 7
Close - Appliance
Electric/gas range
Feb 8, 2025 · Apt 7
Close - Heat/hot water
Entire building
Feb 8, 2025 · Apt 7
Close - Heat/hot water
Entire building
Feb 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2025 · Apt 1
Close - Paint/plaster
Ceiling
Mar 25, 2019 · Apt 3
Close - Unsanitary condition
Pests
Mar 25, 2019 · Apt 3
Close - Heat/hot water
Entire building
Jan 6, 2018 · Apt APT6
Close - Heat/hot water
Apartment only
Jan 5, 2018 · Apt 4
Close - Plumbing
Toilet
Sep 23, 2017 · Apt 3
Close - Plumbing
Basin/sink
Sep 23, 2017 · Apt 3
Close - Plumbing
Basin/sink
Sep 23, 2017 · Apt 3
Close - Plumbing
Toilet
Sep 23, 2017 · Apt 3
Close - Water leak
Slow leak
Sep 16, 2017 · Apt 1
Close - Nonconst
Vermin
Dec 7, 2009 · Apt 5
Close - Heating
Heat related
Apr 2, 2008 · Apt 2
Close - Heating
Heat related
Nov 29, 2003 · Apt 6
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1920
- Floors
- 5
- Residential units
- 8
- Building area
- 6,226 ft²
- Lot area
- 1,557 ft²
- Zoning
- R7A
- Community board
- 103
- Council district
- 2
- Block / lot
- 448 / 27
- Assessed value
- $2,413,350
- Landmark / historic district
- No
HPD registration #108044, last renewed Aug 30, 2025.
Questions about 113 1 Avenue
Who owns 113 1 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 113 First Avenue Partners LLC.
Does 113 1 Avenue have violations?
Yes. NYC HPD has recorded 77 housing violations at this property.
Is 113 1 Avenue rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 75% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 113 1 Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 113 1 Avenue?
It has 8 residential units and 10 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.