roofy

47 East 3 Street

Manhattan, NY 10003BBL 1-00445-0062Map

Owner of record: Aee Family LLC

47 East 3 Street is a walk-up apartment building built in 1901 in Manhattan, 10003. It has 15 residential units across 5 floors. The owner of record is Aee Family LLC. HPD has recorded 4 housing violations here, most recently on November 6, 2017. 3 of the 4 most recent violations are still open.

HPD violations
4
DOB violations
16
ECB violations
10
HPD complaints
76

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Nov 6, 2017

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 4

  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 6, 2017

    Closed — Violation dismissed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 200 watts minimum required (light fixtures present)

    Apr 21, 2014

    Open — Invalid certification
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 8, 3rd story, 1st apartment from east at south

    Jan 7, 2009 · Apt 8

    Open — Certification postponment denied
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 8, 3rd story, 1st apartment from east at south

    Jan 7, 2009 · Apt 8

    Open — Certification postponment denied

DOB building violations · 16

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 28, 2017

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2011 inspection/test

    Oct 1, 2012

    Dob violation - dismissed
  • Construction other optional

    Boro-comm

    Jan 19, 2012

    Dob violation - dismissed
Show 6 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Sep 1, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Dec 2, 1992

    Vp-violation unserved ecb-active
  • Construction other optional

    C-construction other optional

    Dec 2, 1992

    Dob violation - dismissed

ECB violations · 10

  • Class - 3

    B354 15 24b 48a 32a 50 50abc 50-missing dar kit on oil boiler 50a-salt off valve on oil return line 50b-unions on fill and urat pipe 50-weep holes on vaulted or tank cemented closed

    Nov 28, 2008 · Penalty $200

    Resolve
  • Non-hazardous

    Work does not conform to approved plans. non-conforming work noted on 1st fl, bathrm lay. living rm non-conforming & 3rd fl non-conforming under approved plans dated 11/7/05 job #104199458. remedy: stop all wor

    Feb 8, 2007 · Penalty $2,500

    Resolve
  • Non-hazardous

    Work does not conform to approved plans.date amend 11/07/2005.apt#3 1fl.layout not as per approved plans #104199458 issued 12/19/07.remedy:conform to plans.

    Feb 7, 2007 · Penalty $130

    Resolve
  • Hazardous

    Failure to provide adequate protection for sidewalks & walkways duringconst operations in that no protection has been provided for rear yardof 60-62 2nd ave & the roof tops 45 e 3 st & 51 e 3rd st as required

    Aug 23, 2006 · Penalty $2,000

    Resolve
  • Hazardous

    Failure to safeguard public & property.upon insp parapti wall @ roof areas under reconstruction.@ rear of bldg in open area used by tenantsfor garabage disposal.on going work over head w/o any overhead protect

    Aug 4, 2006 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to provide a contractor's sign.upon inspection interior alteration of apt & exterior facade work & parapit replacement 5 story bldg.no contractor's sign provided at site.

    Aug 4, 2006

    Resolve
  • Hazardous

    Design drawing. upon inspection one sheet of pipe scaffolding sitting on top of sidewalk shed to 5th fl- 10 ft wide by 50 ft high into 15' high shed no design srawing on site provided.

    Aug 4, 2006 · Penalty $500

    Resolve
  • Non-hazardous

    Work w/o permit-work noted: constructed a platform at first floor rear,made of q-decking three steel columns and concrete w/o first obtaining permits and approvals as required by this dept. remedy: remove on le

    Apr 17, 2005 · Penalty $2,500

    Resolve
  • Non-hazardous

    50 50>insulation around boiler missing

    Jul 14, 2003 · Penalty $180

    Resolve
  • Non-hazardous

    Work w/o permit : noted, at rear of building at 1st fl a platform approx 18' x 5' has been constructed using 3 10ft lally clums (3) 6" i beams ( into rear facade ) + metal q decking and concrete has been const

    Jun 12, 2002 · Penalty $500

    Resolve

Complaints

  • Plumbing

    Water supply

    Sep 2, 2016 · Apt 3

    Close
  • Plumbing

    Water supply

    Sep 2, 2016 · Apt 3

    Close
  • Heating

    Heat related

    Feb 6, 2009 · Apt 2

    Close
  • Heating

    Heat related

    Jan 10, 2009 · Apt 8

    Close
  • Heating

    Heat related

    Jan 2, 2009 · Apt 8

    Close
  • Heating

    Heat related

    Dec 19, 2008 · Apt 8

    Close
  • Heating

    Heat related

    Dec 18, 2008 · Apt 8

    Close
  • Heating

    Heat related

    Dec 18, 2008 · Apt 15

    Close
  • Heating

    Heat-plant

    Dec 18, 2008 · Apt 15

    Close
  • Heating

    Heat related

    Dec 18, 2008 · Apt 8

    Close
Show 40 more ↓
  • Electric

    Lighting

    Nov 14, 2008 · Apt 8

    Close
  • Heating

    Heat related

    Nov 4, 2008 · Apt 15

    Close
  • Heating

    Heat related

    Oct 29, 2008 · Apt 15

    Close
  • Heating

    Heat related

    Oct 29, 2008 · Apt 4

    Close
  • Heating

    Heat related

    Oct 25, 2008 · Apt 8

    Close
  • Heating

    Heat related

    Oct 21, 2008 · Apt 15

    Close
  • Heating

    Heat related

    Oct 19, 2008 · Apt 2

    Close
  • Heating

    Heat related

    Nov 28, 2007 · Apt 2

    Close
  • General

    Mailbox

    Nov 8, 2007 · Apt 13

    Close
  • Plumbing

    Water supply

    Jan 30, 2007 · Apt 13

    Close
  • Heating

    Heat related

    Jan 21, 2007 · Apt 8

    Close
  • Heating

    Heat related

    Dec 18, 2006 · Apt 12

    Close
  • Plumbing

    Water supply

    Aug 28, 2006 · Apt 15

    Close
  • Heating

    Heat related

    Aug 24, 2006 · Apt APT1

    Close
  • Nonconst

    Rubbish

    Aug 2, 2006 · Apt APT1

    Close
  • Nonconst

    Rubbish

    Jul 17, 2006 · Apt 1

    Close
  • Heating

    Heat related

    Mar 2, 2006 · Apt 8

    Close
  • Paint/plaster

    Wall

    Feb 7, 2006 · Apt 8

    Close
  • Heating

    Heat related

    Jan 26, 2006 · Apt 12

    Close
  • Heating

    Heat related

    Jan 16, 2006 · Apt 15

    Close
  • Heating

    Heat related

    Jan 16, 2006 · Apt 8

    Close
  • Heating

    Heat related

    Jan 15, 2006 · Apt 8

    Close
  • Paint/plaster

    Ceiling

    Oct 13, 2005 · Apt 15

    Close
  • Plumbing

    Water-leaks

    Oct 13, 2005 · Apt 13

    Close
  • Heating

    Heat related

    Oct 12, 2005 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Oct 12, 2005 · Apt 8

    Close
  • Paint/plaster

    Ceiling

    Oct 9, 2005 · Apt 8

    Close
  • Plumbing

    Water-leaks

    Oct 9, 2005 · Apt 8

    Close
  • Paint/plaster

    Ceiling

    Sep 16, 2005 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Sep 16, 2005 · Apt 2

    Close
  • Heating

    Heat related

    Mar 11, 2005 · Apt 2

    Close
  • Heating

    Heat related

    Mar 11, 2005 · Apt 15

    Close
  • Heating

    Heat related

    Mar 11, 2005 · Apt 12

    Close
  • Nonconst

    Rubbish

    Aug 30, 2004 · Apt APT1

    Close
  • Nonconst

    Janitor/super

    Aug 30, 2004 · Apt APT1

    Close
  • Plumbing

    Water-leaks

    Aug 15, 2004 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Aug 13, 2004 · Apt 2

    Close
  • Construction

    Roof

    Aug 13, 2004 · Apt 12

    Close
  • Plumbing

    Water-leaks

    Aug 13, 2004 · Apt 12

    Close
  • Plumbing

    Water-leaks

    Aug 13, 2004 · Apt 13

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1901
Floors
5
Residential units
15
Building area
11,604 ft²
Lot area
3,080 ft²
Zoning
R8B
Community board
103
Council district
2
Block / lot
445 / 62
Assessed value
$1,060,200
Landmark / historic district
East Village / Lower East Side Historic District

HPD registration #119064, last renewed Oct 20, 2016.

Questions about 47 East 3 Street

Who owns 47 East 3 Street?

The owner of record in NYC Department of City Planning PLUTO data is Aee Family LLC.

Does 47 East 3 Street have violations?

Yes. NYC HPD has recorded 4 housing violations at this property.

Is 47 East 3 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 47 East 3 Street built?

City records list 1901 as the year it was built.

How many apartments are in 47 East 3 Street?

It has 15 residential units and 17 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.