roofy

141 Avenue A

Manhattan, NY 10009BBL 1-00436-0029Map

Owner of record: 141 Ave A LLC

141 Avenue A is a walk-up apartment building built in 1888 in Manhattan, 10009. It has 8 residential units across 5 floors. The owner of record is 141 Ave A LLC. HPD has recorded 33 housing violations here, most recently on July 10, 2024. 3 of the 33 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2024.

HPD violations
33
DOB violations
33
ECB violations
31
HPD complaints
112

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jul 10, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
1
About 13% of the building's 8 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 33

  • C

    Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 5, 3rd story, 1st apartment from north at east

    Jul 10, 2024 · Apt 5

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5, 3rd story, 1st apartment from north at east

    Jul 10, 2024 · Apt 5

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 5, 3rd story, 1st apartment from north at east

    Jul 10, 2024 · Apt 5

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5, 3rd story, 1st apartment from north at east

    Jul 10, 2024 · Apt 5

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 5, 3rd story, 1st apartment from north at east

    Jul 10, 2024 · Apt 5

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at the ceiling and all walls in the kitchen located at apt 5, 3rd story, 1st apartment from north at east

    Jul 10, 2024 · Apt 5

    Closed — Violation dismissed
  • B

    Provide an adequate supply of gas to the fixtures at range. in the entire apartment located at apt 5, 3rd story, 1st apartment from south at west

    Jul 3, 2024 · Apt 5

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 5, 3rd story, 1st apartment from south at west

    Jul 3, 2024 · Apt 5

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5, 3rd story, 1st apartment from south at west

    Jul 3, 2024 · Apt 5

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 5, 3rd story, 1st apartment from south at west

    Jul 3, 2024 · Apt 5

    Open — Notice of issuance sent to tenant
Show 23 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5, 3rd story, 1st apartment from south at west

    Jul 3, 2024 · Apt 5

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 1st room from east located at apt 5, 3rd story, 1st apartment from south at west

    Jul 3, 2024 · Apt 5

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 2nd room from east located at apt 5, 3rd story, 1st apartment from south at west

    Jul 3, 2024 · Apt 5

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 3rd room from east located at apt 5, 3rd story, 1st apartment from south at west

    Jul 3, 2024 · Apt 5

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroom located at apt 5, 3rd story, 1st apartment from south at west

    Jul 3, 2024 · Apt 5

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the kitchen located at apt 5, 3rd story, 1st apartment from south at west

    Jul 3, 2024 · Apt 5

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Jul 3, 2024

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jul 3, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Jul 3, 2024

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Jul 3, 2024

    Closed — Violation dismissed
  • A

    File with this department a registration statement for building.

    Jul 3, 2024

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jul 3, 2024

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jul 3, 2024

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5, 3rd story, 1st apartment from south at west

    Jul 3, 2024 · Apt 5

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 15, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 2, 2022

    Closed — Violation dismissed
  • C

    Provide a safe and adequate supply of electric service to the fixtures at electrical outlets at all ceilinga and all walls in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Mar 6, 2022 · Apt 2

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of lock at door to fire escape in the 4th room from east located at apt 2, 2nd story, 1st apartment from east at south

    Mar 6, 2022 · Apt 2

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioning unit protuding more than 4 inches at window sill at 2nd story balcony at north fire escape , 2nd story

    Mar 6, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 15, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 15, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 1, 2015

    Closed — Violation dismissed
  • B

    Section 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition consisting of increase of occupancy in the building (11 apartments as per c of o 8 aparments)

    Jul 11, 2012

    Closed — Violation dismissed

DOB building violations · 33

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Imegncy-immediate emergency anythingoptional

    Nov 28, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
Show 23 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jul 10, 2001

    Vw-violation work without permit - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 23, 1995

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 23, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Plumbing none

    P-plumbing none

    Aug 9, 1991

    Dob violation - dismissed
  • Plumbing none

    P-plumbing none

    Aug 9, 1991

    Dob violation - active
  • Elevator elevatoroptional

    Ll16-local law 16/84 - elevator elevatoroptional

    Feb 26, 1991

    Vp*-violation unserved ecb- dismissed

ECB violations · 31

  • Class - 2

    I observed in hallway on 4th floor for apt #5 gas piping installed in hallway and union installed on main gas line for house side is prohibited and not code compliant as per fgc 404.3 sections 1 and 5 and fgc 4

    Aug 10, 2023

    Resolve
  • Class - 1

    Cease use gas hot water heater pgxh50 248// flue not connected to the chimneyýgas pipe connected+water pipes connected¨-saftey relief valve defective, maintain boiler; correct all hazardous conditions immediate

    Oct 2, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Correct violation and submit the certificate of correction

    Oct 2, 2020 · Penalty $312

    Resolve
  • Class - 2

    The hot water storage tank safety valve is incorrect ý1" valve on 3/4 tap¨; correct violation and submit the certificate of correction

    Oct 2, 2020 · Penalty $312

    Resolve
  • Class - 2

    15,24,34,50a. (50a)improper flue support. correct all listed violation & submit c of c.

    Mar 20, 2018 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain bldg walls or appurtenances. noted: on left side (exp 2) near front stucco is cracking large and missing between 1st & 3rd flrs. remedy: maintain bldg, make all repairs.

    Jul 17, 2009 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain lighting under sidewalk shed with vandle proof fixtures noted lighting under shed with permit 110420866 at exp 1 has no vandle proof fixtures remedy: maintain sidewalk shed lighting

    Mar 4, 2009 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to remove sidewalk shed promptly after work has been completed noted facade work is complete as per landlord and visional inspection shed remains and is being used for staging area for work being done

    Mar 4, 2009

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected const operations noted supported scaffold erected improperly on sidewalk shed missing diagonal bracing and planks scaffold in near of bldg is missing plank

    Mar 4, 2009 · Penalty $12,000

    Resolve
  • Class - 1

    Failure to maintain bldg wall(s) or appurtenances. defects noted: corner of front wall & east wall (exp #12 #2) cracked. between 1st fl & 3rd fl. roof cornice ( ) rotted. remedy: repair and/or replace defects.

    Nov 28, 2008 · Penalty $5,000

    Resolve
Show 21 more ↓
  • Class - 1

    Failure to maintain exterior of bldg. on inspection approx 5 windows have been installed on rear south side of bldg from ground floor to roof w/o lintels in place to support loose brick over window openings.

    Aug 1, 2008 · Penalty $5,000

    Resolve
  • Non-hazardous

    Having signage in violation of sign for residence districts (c1-5) located in the residential portion of a mixed bldg. remedy:remove illegal signage.

    Sep 2, 2006 · Penalty $800

    Resolve
  • Non-hazardous

    Having signage w/ a surface area greater than 150 sq ft in a c1-5 district. remedy:remove illegal signage.

    Sep 2, 2006 · Penalty $800

    Resolve
  • Non-hazardous

    Having prohibited advertising signage in a c1-5 district. remedy:remove illegal signage.

    Sep 2, 2006 · Penalty $800

    Resolve
  • Non-hazardous

    Having signage which is located on a portion of frontage that is w/in 20 ft of frontage on the same side of street in a residence district c1-5.remedy:remove illegal signage .

    Sep 2, 2006 · Penalty $800

    Resolve
  • Non-hazardous

    Work w/o a permit. work noted: approx 35' x 15' sign attached to bldg.remedy:obtain a permit or restore to prior legal condition.

    Sep 2, 2006 · Penalty $2,500

    Resolve
  • Non-hazardous

    Having signage extending higher then 25ft above curb level in a c1-5 district. remedy: remove illegal signage

    Sep 2, 2006 · Penalty $800

    Resolve
  • Hazardous

    Exit passage or corridor:required width decreased by obstruction noted:at 1st fl of premises front entrance corridor (lobby) obstructed by sheetrock.remedy:remove obstruction

    Jun 8, 2006 · Penalty $180

    Resolve
  • Hazardous

    Failure to maintain exterior bldg noted:the metal cornice and ornamental window treatments on the north and east walls are broken,missing and rusting at different locations.throughout the facade creating a haz

    Apr 22, 2003 · Penalty $800

    Resolve
  • Hazardous

    Use or installation of plumbing materials which do not comply with rs-16- quick vents are not allowed! 3-quick vents installed for venting of newly installed no hub cast iron roughing. remedy: remove quick vent

    Apr 21, 2003 · Penalty $400

    Resolve
  • Hazardous

    Failure to have new or altered plumbing system tested. on 2nd floor - this apartment is getting split into two apartments and the demolition and then new installation of no hub-cast-iron roughing for 2-toilets

    Apr 21, 2003 · Penalty $400

    Resolve
  • Hazardous

    Plumbing work performed was required to be performed by a licensed master plumber. on 2nd floor-this apartment is getting split into two apartments and the demolition and then new installation of no-hub cast

    Apr 21, 2003 · Penalty $400

    Resolve
  • Hazardous

    Plumbing work without a permit. on 2nd floor - this apartment is getting split into two apartments and the demolition and thhen new installation of no - hub cast iron roughing for 2-toilets, 2-tubs,

    Apr 21, 2003 · Penalty $800

    Resolve
  • Non-hazardous

    Failure to provide approved set of plans at time of inspection permit#103119876 exp 3/30/03 posted noted: 2 apartments on the 2nd floor south side of building has been gutted all floors and walls an partitions

    Apr 1, 2002

    Resolve
  • Non-hazardous

    Work without a permit (25% of work completed) noted: enlarging opening of one rear window making it approx 6" wider + 6" higher. glazing removed brick work completed.

    Jul 10, 2001 · Penalty $500

    Resolve
  • Hazardous

    Failure to maintain plumbing and / r appurtenances -hazardous. remedy: maintain plumbing and /or appurtanances

    Dec 23, 1999 · Penalty $2,500

    Resolve
  • Non-hazardous

    Work withou ta permit noted at rear of bldg exhaust chimney duction constucted of metal isntalled from 1st fl lecel to 5 fl compliance of prior violation remedy onbtain all necessary permits and approvals

    Jul 14, 1999

    Resolve
  • Non-hazardous

    Work without a permit. noted. installed exaust chimney (metal) from 1st through 5th floor at rear of bldg. remedy: obtain all permits if feasible or restore premises to prior legal condition.

    Dec 27, 1995 · Penalty $350

    Resolve
  • Non-hazardous

    Occupying altered builing without a new certificate of occupancy . alt. #1393/81 1st floor eatin and drinking establishment. remedy: obtain new c of o or discontine liiegal use.

    Apr 20, 1994 · Penalty $350

    Resolve
  • Non-hazardous

    Work without a permit. work noted. installation of an exhaust chimney 1st to 5th story at rear of building. remedy. obtain all required permit or restore to prior legal condition.

    Sep 28, 1992 · Penalty $350

    Resolve
  • Non-hazardous

    Occupying altered building without a new c of o. remedy: obtain a new c of o from this department.

    Jun 16, 1988 · Penalty $250

    Resolve

Complaints

  • Appliance

    Electric/gas range

    Jun 28, 2024 · Apt 5

    Close
  • General

    Cooking gas

    Jun 27, 2024 · Apt 5

    Close
  • Water leak

    Heavy flow

    May 1, 2023 · Apt 5

    Close
  • Electric

    Power outage

    Mar 5, 2022 · Apt 2

    Close
  • Electric

    Power outage

    Mar 5, 2022 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Oct 31, 2020 · Apt 5

    Close
  • Heat/hot water

    Apartment only

    Dec 30, 2019 · Apt 5

    Close
  • Water leak

    Heavy flow

    Jun 24, 2018 · Apt GROUND

    Close
  • Heat/hot water

    Entire building

    Dec 28, 2017 · Apt 8

    Close
  • Water leak

    Slow leak

    Nov 7, 2017 · Apt 2

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Dec 16, 2016 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2016 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Nov 15, 2016 · Apt 5

    Close
  • Water leak

    Heavy flow

    Oct 18, 2016 · Apt BLDG

    Close
  • Electric

    Lighting

    Oct 18, 2016 · Apt BLDG

    Close
  • Paint/plaster

    Ceiling

    Oct 18, 2016 · Apt BLDG

    Close
  • Electric

    Lighting

    Oct 18, 2016 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Oct 18, 2016 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Oct 18, 2016 · Apt 1

    Close
  • Water leak

    Slow leak

    Oct 18, 2016 · Apt 1

    Close
  • Water leak

    Heavy flow

    Oct 18, 2016 · Apt 1

    Close
  • Water leak

    Slow leak

    Oct 18, 2016 · Apt 2

    Close
  • Water leak

    Heavy flow

    Oct 18, 2016 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Jun 23, 2012 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Jun 23, 2012 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Jun 23, 2012 · Apt 2

    Close
  • Heating

    Heat related

    Feb 22, 2011 · Apt BLDG

    Close
  • Heating

    Heat related

    Feb 22, 2011 · Apt 3

    Close
  • Nonconst

    Vermin

    Oct 1, 2009 · Apt 3

    Close
  • Paint/plaster

    Wall

    Oct 1, 2009 · Apt 3

    Close
  • Appliance

    Refrigerator

    Oct 1, 2009 · Apt 3

    Close
  • Plumbing

    Toilet

    Oct 1, 2009 · Apt 3

    Close
  • General

    Doors

    Oct 1, 2009 · Apt 3

    Close
  • Plumbing

    Toilet

    Oct 1, 2009 · Apt 3

    Close
  • Nonconst

    Smoke detector

    Oct 1, 2009 · Apt 3

    Close
  • Nonconst

    Carbon monoxide

    Oct 1, 2009 · Apt 3

    Close
  • Nonconst

    Vermin

    Sep 28, 2009 · Apt 3

    Close
  • Paint/plaster

    Wall

    Sep 28, 2009 · Apt 3

    Close
  • Plumbing

    Toilet

    Sep 28, 2009 · Apt 3

    Close
  • Appliance

    Refrigerator

    Sep 28, 2009 · Apt 3

    Close
  • Plumbing

    Toilet

    Sep 28, 2009 · Apt 3

    Close
  • Nonconst

    Carbon monoxide

    Sep 28, 2009 · Apt 3

    Close
  • Nonconst

    Smoke detector

    Sep 28, 2009 · Apt 3

    Close
  • General

    Doors

    Sep 28, 2009 · Apt 3

    Close
  • Heating

    Heat related

    Feb 5, 2008 · Apt BLDG

    Close
  • General

    Doors

    Feb 2, 2008 · Apt BLDG

    Close
  • Heating

    Heat related

    Feb 2, 2008 · Apt BLDG

    Close
  • General

    Windows

    Feb 1, 2008 · Apt 1A

    Close
  • Heating

    Heat related

    Feb 1, 2008 · Apt 1A

    Close
  • Heating

    Heat related

    Jan 31, 2008 · Apt 6

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1888
Floors
5
Residential units
8
Building area
8,105 ft²
Lot area
1,629 ft²
Zoning
R7A
Community board
103
Council district
2
Block / lot
436 / 29
Assessed value
$1,664,550
Landmark / historic district
No

HPD registration #109851, last renewed Jun 23, 2026.

Questions about 141 Avenue A

Who owns 141 Avenue A?

The owner of record in NYC Department of City Planning PLUTO data is 141 Ave A LLC.

Does 141 Avenue A have violations?

Yes. NYC HPD has recorded 33 housing violations at this property.

Is 141 Avenue A rent stabilized?

NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 13% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 141 Avenue A built?

City records list 1888 as the year it was built.

How many apartments are in 141 Avenue A?

It has 8 residential units and 10 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.