114 East 1 Street
Manhattan, NY 10009BBL 1-00429-0045Map
Owner of record: 114-16 East 1st LLC
114 East 1 Street is a walk-up apartment building built in 1920 in Manhattan, 10009. It has 30 residential units across 6 floors. The owner of record is 114-16 East 1st LLC. HPD has recorded 533 housing violations here, most recently on September 17, 2026. 32 of the 50 most recent violations are still open. City tax records listed 12 rent-stabilized apartments here in 2024.
- HPD violations
- 533
- DOB violations
- 26
- ECB violations
- 25
- HPD complaints
- 1,099
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 533
- CImmediately hazardous
Properly repair with similar material the broken or defective medium density fiberboard flooring in the entire apartment located at apt 12, 3rd story, 2nd apartment from west at north
Sep 17, 2026 · Apt 12
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 17, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 12, 3rd story, 2nd apartment from west at north
Sep 17, 2026 · Apt 12
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 12, 3rd story, 2nd apartment from west at north
Sep 17, 2026 · Apt 12
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 12, 3rd story, 2nd apartment from west at north
Sep 17, 2026 · Apt 12
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Sep 7, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 12, 3rd story, 2nd apartment from east at south
Sep 2, 2026 · Apt 12
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 12, 3rd story, 2nd apartment from east at south
Sep 2, 2026 · Apt 12
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 12, 3rd story, 2nd apartment from east at south
Sep 2, 2026 · Apt 12
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 1st room from north located at apt 12, 3rd story, 2nd apartment from east at south
Sep 2, 2026 · Apt 12
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall in the 1st room from north located at apt 11, 3rd story, 1st apartment from north at east
Apr 27, 2026 · Apt 11
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing kickstand at door leading to east yard at public hall, 1st story
Mar 26, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building front entrance door at public hall, 1st story
Mar 26, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 11, 3rd story, 1st apartment from east at south
Mar 26, 2026 · Apt 11
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 11, 3rd story, 1st apartment from east at south
Mar 26, 2026 · Apt 11
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing 2nd metal tread from bottom at frist story balcony 2nd stack from west at building front at fire escape
Feb 4, 2026
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.
Nov 5, 2025
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 6, 2nd story, 1st apartment from east at south
Sep 23, 2024 · Apt 6
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 6, 2nd story, 1st apartment from east at south
Sep 23, 2024 · Apt 6
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceilings and all walls in the entire apartment located at apt 6, 2nd story, 1st apartment from east at south
Sep 23, 2024 · Apt 6
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroom located at apt 3, 1st story, 1st apartment from west at north
Jul 6, 2024 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 1st story, 1st apartment from west at north
Jul 6, 2024 · Apt 3
Open — Notice of issuance sent to tenant - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 12, 3rd story, 2nd apartment from west at north
Jun 24, 2024 · Apt 12
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings and all walls in the entire apartment located at apt 12, 3rd story, 2nd apartment from west at north
Jun 24, 2024 · Apt 12
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 6, 2nd story, 1st apartment from east at south
May 16, 2024 · Apt 6
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 6, 2nd story, 1st apartment from east at south
May 16, 2024 · Apt 6
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the foyer located at apt 6, 2nd story, 1st apartment from east at south
May 16, 2024 · Apt 6
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 3rd room from north located at apt 6, 2nd story, 1st apartment from east at south
May 16, 2024 · Apt 6
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall. in the bathroom located at apt 9, 2nd story, 1st apartment from north at east
Oct 11, 2023 · Apt 9
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling. in the bathroom located at apt 9, 2nd story, 1st apartment from north at east
Oct 11, 2023 · Apt 9
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing. in the entire apartment located at apt 9, 2nd story, 1st apartment from north at east
Oct 11, 2023 · Apt 9
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 9, 2nd story, 1st apartment from north at east
Oct 11, 2023 · Apt 9
Open — Notice of issuance sent to tenant - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 1st room from north at east located at apt 22, 5th story, 2nd apartment from west at north
Jun 8, 2022 · Apt 22
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st base cabinet from south at west wall, 1st door frame from west at north wall, north wall, 1st wall cabinet from south at west wall in the kitchen located at apt 22, 5th story, 2nd apartment from west at north
Jun 8, 2022 · Apt 22
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north at west located at apt 22, 5th story, 2nd apartment from west at north
Jun 8, 2022 · Apt 22
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchen located at apt 22, 5th story, 2nd apartment from west at north
Jun 8, 2022 · Apt 22
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the kitchen located at apt 22, 5th story, 2nd apartment from west at north
Jun 8, 2022 · Apt 22
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, ceiling in the 1st room from north at east located at apt 22, 5th story, 2nd apartment from west at north
Jun 8, 2022 · Apt 22
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, ceiling in the 1st room from north at west located at apt 22, 5th story, 2nd apartment from west at north
Jun 8, 2022 · Apt 22
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 1st room from north at west located at apt 22, 5th story, 2nd apartment from west at north
Jun 8, 2022 · Apt 22
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 22, 5th story, 2nd apartment from west at north
Jun 8, 2022 · Apt 22
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 22, 5th story, 2nd apartment from west at north
Jun 8, 2022 · Apt 22
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 22, 5th story, 2nd apartment from west at north
Jun 8, 2022 · Apt 22
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 22, 5th story, 2nd apartment from west at north
Jun 8, 2022 · Apt 22
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall, south wall, north wall in the 2nd room from north at east located at apt 22, 5th story, 2nd apartment from west at north
May 24, 2022 · Apt 22
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the bathroom located at apt 22, 5th story, 2nd apartment from west at north
May 24, 2022 · Apt 22
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt 22, 5th story, 2nd apartment from west at north
May 24, 2022 · Apt 22
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, 1st window frame from north at east wall in the kitchen located at apt 22, 5th story, 2nd apartment from west at north
May 24, 2022 · Apt 22
Open — Nov sent out
DOB building violations · 26
- Construction other optional
Partial vacate order. observed substantially leaning parapet wall @ exposure 2/west elevation. also multiple smear cracks throughout exterior wall system, and vertical crack running the height of the exterial wall aadjacent to neighboring property. remedy: vacate entire roof and exposure 2, west elevatin, except in emergency purposes
Jan 6, 2026
Dob violation - active - Construction other optional
Partial vacate order. observed substantial leaning parapet wall @ exp 2 w elev. also smear cracks throughout exterial wall system, and a vertical crack running the height of exterial wall adjacent to the neighboring proper exp2,w elev. remedy: vacate the entire roof and exposure 2, west elevation, except in emergency purposes
Jan 6, 2026
Dob violation - active - Construction other optional
Failure to maintain facade & appurtances. observed substantial leaning parapet wall exp2, w ele, mult smear crack throughout exterior wall sys vertical crack run the height of exterior wall adjacent to neighbo prop. remedy:owner to immed retain nyc rdp to inspect,evaluate 100% of parapet wall entire wall sys. report to [email protected]
Dec 31, 2025
Dob violation - active - Construction other optional
Emergency work order due to cracked/leaning parapet wall @ roof level with inadequate sup exp#2 w elev. exp#1 s elev, cracked & spalling stucco @ multiple locations.remedy: immediately provide & provide safety measures to secure/protect public & install public protection make immed repairs u/sup of lp.remove/secure loose hanging material
Dec 31, 2025
Dob violation - active - Immediate emergency anythingoptional
Remedy: provide approximately 40 linear ft of sidewalk shedat exposure #1 and 40 linear ft of.sidewalk shed at exposure #3
Mar 7, 2025
Dob violation - dismissed - Construction other optional
@expo:#1 metal cornice molding @roof deteriorated leaning inward, observed brick @expos:#1,3 damaged,crackedstone mortar joints deteriorated.&missing mortar defaced brick. step cracking to the left &right of main entrance. between. all fl . horizontal/vertical cracked, egress@ fire scape obstructed with flowerpot's.at 3rd fl&2nd
Mar 6, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed
Show 16 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 7, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 7, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 7, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed
ECB violations · 25
- Class - 1
Failure to maintain building facade wall"s" and appurtenances. note: at the time of inspection i observed at ex #1, south elevation, crackedand spalling stucco at multiple locations. at ex #2, west elevation, c
Dec 31, 2025 · Penalty $5,000
Resolve - Class - 1
Atoi of a 6-story building @expo:#1 metal cornice molding @roof deteriorated leaning inward, observed brick @expos:#1,3 damaged,crackedstone mortar joints deteriorated.&missing mortar defaced brick. step cracki
Mar 6, 2025 · Penalty $2,500
Resolve - Class - 1
At the time of inspection i observed 3 workers installing new plumbing cast iron waste lines. workers stated they work for high quality construction. the scope of work observed is cover under plumbing permit:#
Mar 6, 2025 · Penalty $5,000
Resolve - Class - 1
Atoi on an active jobsite, observed electrical work was done at 1first floor commercial space upon reviewing. and doing a search on bis/dob now reveal to me that no permit was issued for electrical work for tha
Mar 6, 2025 · Penalty $1,600
Resolve - Class - 1
Observed at the time of inspection 3 workers.installing cast iron plumbing waste lines in 1st fl commercial space. workers stated they did the work and work for high quality construction, obtain license
Mar 6, 2025 · Penalty $5,000
Resolve - Class - 1
No person shall cause unlicensed electrical work 27-3017 respondent caused unlicensed electrical work by sending and allowing unlicensed and unqualified workers perform electrical work. 3 workers observed perfo
Mar 6, 2025 · Penalty $4,800
Resolve - Class - 2
Work without a permit: noted: upon inspection observed in apartment #4 an extension at the rear. the room is approx. 15 ft wide by 15 ft long by 10 ft high. observed a new radiator has been installed. work is 1
Dec 22, 2020
Resolve - Class - 2
Work without a permit: noted: upon inspection observed in apartment #4 an extension at the rear. the room is approx. 15 ft wide by 15 ft long by 10 ft high. in the room is a door leading to the outside which ha
Dec 22, 2020
Resolve - Class - 2
Work without a permit: noted: upon inspection observed in apartment #4 an extension at the rear. the room is approx. 15 ft wide by 15 ft long by 10 ft high. observed in the room 4 electrical outlets, 1 light sw
Dec 22, 2020
Resolve - Class - 2
Failure to maintain bldg in code compliant manner: noted: upon inspection observed in apt#12 cracks along the ceiling & walls. observed cracks along windows,walls & bathroom. several cracks located in bedroom,
Nov 18, 2019 · Penalty $625
Resolve
Show 15 more ↓
- Class - 2
Work w/out a permit.noted:@time of insp,observed apt 3 & 4 is completely renovated w/new partitions walls,new bathrms new kitchen & new fls.rem:obtain permit.
Jun 10, 2015 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner.no fire stopping per bc 712.3;27-345.noted:observed @time of insp,several areas an cellar ceiling the fire stopping was missing.rem:provdie/maintain fire stoppi
Jun 10, 2015 · Penalty $1,000
Resolve - Class - 1
Failure to provide unobstructed exit passageway.noted:observed @time of insp,public exit passageway is obstructed w/storage bins & householdgarbage.rem:remove obstruction.
Jun 10, 2015 · Penalty $1,200
Resolve - Class - 2
Electrical work w/o permit observed at 2pm branch wiring circuit installed, outlets,fixtures,switches,in apt 3 and 4. no application is on file for electric work. rmdy: obtain permit.
Jun 10, 2015 · Penalty $400
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner.noted:@rear,observed@time of insp storage of household materials on fire escape & window a.c unit pertuding into fire escape creating a tripping hazard.rem:main
Jun 10, 2015 · Penalty $1,000
Resolve - Class - 2
Owner of the bldg failed to notify dept prior to use/install of c-hooks or outriggers beams in connection w/suspended scaffold. noted: work in progress from c-hook suspended scaffold at exposure #3. picture fil
May 29, 2013
Resolve - Non-hazardous
Failure to comply w/the commissioners order to correct the violating condition & file a certificate of correction w/the nyc dept of bldg. for notice of vio#34483939n & 34489899p. remedy: correct the violating c
Dec 27, 2005 · Penalty $10,000
Resolve - Non-hazardous
Work w/o a permit work noted constructed an elevated extention at rearof apt #4 with windows, and door that leads to a wooden deck with steps to the rear. approx. size is 12 x 12 x 8 ft high. remedy: remove or
Oct 24, 2005 · Penalty $10,000
Resolve - Non-hazardous
Work without a permit work noted constructed an extention at thr firstfloor rear at apt # 4 approx 11 x 14 x 8 ft high extension has been e lavated over basement with masonary piers and a wood deck constructed
Jun 27, 2005 · Penalty $2,500
Resolve - Non-hazardous
Having installed an akihing without a permit. remedy: remove illegal work.
May 27, 2003 · Penalty $800
Resolve - Non-hazardous
Having akining signage not limited to the name and address of the establishment. remedy: remove illegal signage.
May 27, 2003
Resolve - Non-hazardous
Having installed an awning without a permit. remedy: remove illegal w ork
May 27, 2003
Resolve - Non-hazardous
Having installed a sign without a permit. remedy: remove illegal work.
May 27, 2003 · Penalty $800
Resolve - Non-hazardous
-having an illuminated awning sign. -having awning signage not limited to the name & address of the establishment. remedy: remove illegal signage.
May 27, 2003
Resolve - Non-hazardous
-having installed an awning without a permit. remedy: remove illegal work
May 27, 2003 · Penalty $800
Resolve
Complaints
- Electric
Wiring
Sep 10, 2026 · Apt 12
Close - Door/window
Window frame
Sep 10, 2026 · Apt 12
Close - Electric
Lighting
Sep 10, 2026 · Apt 12
Close - Paint/plaster
Ceiling
Sep 10, 2026 · Apt 12
Close - Flooring/stairs
Floor
Sep 10, 2026 · Apt 12
Close - Flooring/stairs
Floor
Sep 10, 2026 · Apt 12
Close - Unsanitary condition
Mold
Sep 10, 2026 · Apt 12
Close - Paint/plaster
Ceiling
Sep 10, 2026 · Apt 12
Close - Electric
Wiring
Sep 3, 2026 · Apt 12
Close - Flooring/stairs
Floor
Sep 3, 2026 · Apt 12
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Sep 3, 2026 · Apt 12
Close - Flooring/stairs
Floor
Sep 3, 2026 · Apt 12
Close - Electric
Lighting
Sep 3, 2026 · Apt 12
Close - Unsanitary condition
Mold
Sep 3, 2026 · Apt 12
Close - Door/window
Window frame
Sep 3, 2026 · Apt 12
Close - Paint/plaster
Ceiling
Sep 3, 2026 · Apt 12
Close - Electric
Lighting
Aug 31, 2026 · Apt 12
Close - Flooring/stairs
Floor
Aug 27, 2026 · Apt 12
Close - Paint/plaster
Ceiling
Aug 27, 2026 · Apt 12
Close - Paint/plaster
Ceiling
Aug 27, 2026 · Apt 12
Close - Flooring/stairs
Floor
Aug 27, 2026 · Apt 12
Close - Door/window
Window frame
Aug 27, 2026 · Apt 12
Close - Unsanitary condition
Mold
Apr 6, 2026 · Apt 11
Close - Water leak
Damp spot
Apr 6, 2026 · Apt 11
Close - Appliance
Refrigerator
Mar 18, 2026 · Apt 22
Open - Unsanitary condition
Mold
Mar 10, 2026 · Apt 11
Close - Unsanitary condition
Mold
Mar 4, 2026 · Apt 11
Close - Heat/hot water
Entire building
Mar 1, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 3, 2026 · Apt 13
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 11, 2025 · Apt 9
Close - Safety
Window guard broken/missing
Oct 21, 2025 · Apt COMMON
Close - Unsanitary condition
Pests
May 7, 2025 · Apt 20
Close - Unsanitary condition
Pests
Aug 21, 2024 · Apt 6
Close - Unsanitary condition
Pests
Aug 4, 2024 · Apt 6
Close - Paint/plaster
Ceiling
Jul 6, 2024 · Apt 3
Close - Unsanitary condition
Pests
Jun 20, 2024 · Apt 12
Close - Unsanitary condition
Pests
Jun 15, 2024 · Apt 30
Close - Unsanitary condition
Pests
Jun 13, 2024 · Apt 12
Close - Paint/plaster
Wall
May 7, 2024 · Apt 6
Close - Unsanitary condition
Pests
May 7, 2024 · Apt 6
Close - Unsanitary condition
Pests
May 7, 2024 · Apt 6
Close - Heat/hot water
Entire building
Nov 10, 2023 · Apt BLDG
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 26, 2026 | $7,300,000 | Rentals - walkup apartments | 33 |
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1920
- Floors
- 6
- Residential units
- 30
- Building area
- 17,610 ft²
- Lot area
- 3,970 ft²
- Zoning
- R8A
- Community board
- 103
- Council district
- 2
- Block / lot
- 429 / 45
- Assessed value
- $2,305,350
- Landmark / historic district
- No
HPD registration #106118, last renewed Jul 8, 2025.
Questions about 114 East 1 Street
Who owns 114 East 1 Street?
The owner of record in NYC Department of City Planning PLUTO data is 114-16 East 1st LLC.
Does 114 East 1 Street have violations?
Yes. NYC HPD has recorded 533 housing violations at this property.
Is 114 East 1 Street rent stabilized?
NYC Department of Finance tax bills listed 12 rent-stabilized units here in 2024 (about 40% of its 30 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 114 East 1 Street built?
City records list 1920 as the year it was built.
How many apartments are in 114 East 1 Street?
It has 30 residential units and 33 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.