roofy

114 East 1 Street

Manhattan, NY 10009BBL 1-00429-0045Map

Owner of record: 114-16 East 1st LLC

114 East 1 Street is a walk-up apartment building built in 1920 in Manhattan, 10009. It has 30 residential units across 6 floors. The owner of record is 114-16 East 1st LLC. HPD has recorded 533 housing violations here, most recently on September 17, 2026. 32 of the 50 most recent violations are still open. City tax records listed 12 rent-stabilized apartments here in 2024.

HPD violations
533
DOB violations
26
ECB violations
25
HPD complaints
1,099

What to know

Concern
10 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 17, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
12
About 40% of the building's 30 apartments
Up from 11 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 533

  • C

    Properly repair with similar material the broken or defective medium density fiberboard flooring in the entire apartment located at apt 12, 3rd story, 2nd apartment from west at north

    Sep 17, 2026 · Apt 12

    Open — Nov sent out
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Sep 17, 2026

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 12, 3rd story, 2nd apartment from west at north

    Sep 17, 2026 · Apt 12

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 12, 3rd story, 2nd apartment from west at north

    Sep 17, 2026 · Apt 12

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 12, 3rd story, 2nd apartment from west at north

    Sep 17, 2026 · Apt 12

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Sep 7, 2026

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 12, 3rd story, 2nd apartment from east at south

    Sep 2, 2026 · Apt 12

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 12, 3rd story, 2nd apartment from east at south

    Sep 2, 2026 · Apt 12

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 12, 3rd story, 2nd apartment from east at south

    Sep 2, 2026 · Apt 12

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the 1st room from north located at apt 12, 3rd story, 2nd apartment from east at south

    Sep 2, 2026 · Apt 12

    Open — Nov sent out
Show 40 more ↓
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at north wall in the 1st room from north located at apt 11, 3rd story, 1st apartment from north at east

    Apr 27, 2026 · Apt 11

    Open — Nov sent out
  • C

    Remove device preventing door from being self-closing kickstand at door leading to east yard at public hall, 1st story

    Mar 26, 2026

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at building front entrance door at public hall, 1st story

    Mar 26, 2026

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 11, 3rd story, 1st apartment from east at south

    Mar 26, 2026 · Apt 11

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 11, 3rd story, 1st apartment from east at south

    Mar 26, 2026 · Apt 11

    Closed — Violation dismissed
  • C

    Fire escape defective. replace with new the broken, defective and/or missing 2nd metal tread from bottom at frist story balcony 2nd stack from west at building front at fire escape

    Feb 4, 2026

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.

    Nov 5, 2025

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 6, 2nd story, 1st apartment from east at south

    Sep 23, 2024 · Apt 6

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 6, 2nd story, 1st apartment from east at south

    Sep 23, 2024 · Apt 6

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceilings and all walls in the entire apartment located at apt 6, 2nd story, 1st apartment from east at south

    Sep 23, 2024 · Apt 6

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroom located at apt 3, 1st story, 1st apartment from west at north

    Jul 6, 2024 · Apt 3

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3, 1st story, 1st apartment from west at north

    Jul 6, 2024 · Apt 3

    Open — Notice of issuance sent to tenant
  • B

    Abate the infestation consisting of bedbugs in the entire apartment located at apt 12, 3rd story, 2nd apartment from west at north

    Jun 24, 2024 · Apt 12

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceilings and all walls in the entire apartment located at apt 12, 3rd story, 2nd apartment from west at north

    Jun 24, 2024 · Apt 12

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 6, 2nd story, 1st apartment from east at south

    May 16, 2024 · Apt 6

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 6, 2nd story, 1st apartment from east at south

    May 16, 2024 · Apt 6

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the foyer located at apt 6, 2nd story, 1st apartment from east at south

    May 16, 2024 · Apt 6

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 3rd room from north located at apt 6, 2nd story, 1st apartment from east at south

    May 16, 2024 · Apt 6

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2024

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall. in the bathroom located at apt 9, 2nd story, 1st apartment from north at east

    Oct 11, 2023 · Apt 9

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling. in the bathroom located at apt 9, 2nd story, 1st apartment from north at east

    Oct 11, 2023 · Apt 9

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing. in the entire apartment located at apt 9, 2nd story, 1st apartment from north at east

    Oct 11, 2023 · Apt 9

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 9, 2nd story, 1st apartment from north at east

    Oct 11, 2023 · Apt 9

    Open — Notice of issuance sent to tenant
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 1st room from north at east located at apt 22, 5th story, 2nd apartment from west at north

    Jun 8, 2022 · Apt 22

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st base cabinet from south at west wall, 1st door frame from west at north wall, north wall, 1st wall cabinet from south at west wall in the kitchen located at apt 22, 5th story, 2nd apartment from west at north

    Jun 8, 2022 · Apt 22

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north at west located at apt 22, 5th story, 2nd apartment from west at north

    Jun 8, 2022 · Apt 22

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchen located at apt 22, 5th story, 2nd apartment from west at north

    Jun 8, 2022 · Apt 22

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the kitchen located at apt 22, 5th story, 2nd apartment from west at north

    Jun 8, 2022 · Apt 22

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, ceiling in the 1st room from north at east located at apt 22, 5th story, 2nd apartment from west at north

    Jun 8, 2022 · Apt 22

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, ceiling in the 1st room from north at west located at apt 22, 5th story, 2nd apartment from west at north

    Jun 8, 2022 · Apt 22

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 1st room from north at west located at apt 22, 5th story, 2nd apartment from west at north

    Jun 8, 2022 · Apt 22

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 22, 5th story, 2nd apartment from west at north

    Jun 8, 2022 · Apt 22

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 22, 5th story, 2nd apartment from west at north

    Jun 8, 2022 · Apt 22

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 22, 5th story, 2nd apartment from west at north

    Jun 8, 2022 · Apt 22

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 22, 5th story, 2nd apartment from west at north

    Jun 8, 2022 · Apt 22

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall, south wall, north wall in the 2nd room from north at east located at apt 22, 5th story, 2nd apartment from west at north

    May 24, 2022 · Apt 22

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the bathroom located at apt 22, 5th story, 2nd apartment from west at north

    May 24, 2022 · Apt 22

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt 22, 5th story, 2nd apartment from west at north

    May 24, 2022 · Apt 22

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, 1st window frame from north at east wall in the kitchen located at apt 22, 5th story, 2nd apartment from west at north

    May 24, 2022 · Apt 22

    Open — Nov sent out

DOB building violations · 26

  • Construction other optional

    Partial vacate order. observed substantially leaning parapet wall @ exposure 2/west elevation. also multiple smear cracks throughout exterior wall system, and vertical crack running the height of the exterial wall aadjacent to neighboring property. remedy: vacate entire roof and exposure 2, west elevatin, except in emergency purposes

    Jan 6, 2026

    Dob violation - active
  • Construction other optional

    Partial vacate order. observed substantial leaning parapet wall @ exp 2 w elev. also smear cracks throughout exterial wall system, and a vertical crack running the height of exterial wall adjacent to the neighboring proper exp2,w elev. remedy: vacate the entire roof and exposure 2, west elevation, except in emergency purposes

    Jan 6, 2026

    Dob violation - active
  • Construction other optional

    Failure to maintain facade & appurtances. observed substantial leaning parapet wall exp2, w ele, mult smear crack throughout exterior wall sys vertical crack run the height of exterior wall adjacent to neighbo prop. remedy:owner to immed retain nyc rdp to inspect,evaluate 100% of parapet wall entire wall sys. report to [email protected]

    Dec 31, 2025

    Dob violation - active
  • Construction other optional

    Emergency work order due to cracked/leaning parapet wall @ roof level with inadequate sup exp#2 w elev. exp#1 s elev, cracked & spalling stucco @ multiple locations.remedy: immediately provide & provide safety measures to secure/protect public & install public protection make immed repairs u/sup of lp.remove/secure loose hanging material

    Dec 31, 2025

    Dob violation - active
  • Immediate emergency anythingoptional

    Remedy: provide approximately 40 linear ft of sidewalk shedat exposure #1 and 40 linear ft of.sidewalk shed at exposure #3

    Mar 7, 2025

    Dob violation - dismissed
  • Construction other optional

    @expo:#1 metal cornice molding @roof deteriorated leaning inward, observed brick @expos:#1,3 damaged,crackedstone mortar joints deteriorated.&missing mortar defaced brick. step cracking to the left &right of main entrance. between. all fl . horizontal/vertical cracked, egress@ fire scape obstructed with flowerpot's.at 3rd fl&2nd

    Mar 6, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
Show 16 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 7, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 7, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 7, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed

ECB violations · 25

  • Class - 1

    Failure to maintain building facade wall"s" and appurtenances. note: at the time of inspection i observed at ex #1, south elevation, crackedand spalling stucco at multiple locations. at ex #2, west elevation, c

    Dec 31, 2025 · Penalty $5,000

    Resolve
  • Class - 1

    Atoi of a 6-story building @expo:#1 metal cornice molding @roof deteriorated leaning inward, observed brick @expos:#1,3 damaged,crackedstone mortar joints deteriorated.&missing mortar defaced brick. step cracki

    Mar 6, 2025 · Penalty $2,500

    Resolve
  • Class - 1

    At the time of inspection i observed 3 workers installing new plumbing cast iron waste lines. workers stated they work for high quality construction. the scope of work observed is cover under plumbing permit:#

    Mar 6, 2025 · Penalty $5,000

    Resolve
  • Class - 1

    Atoi on an active jobsite, observed electrical work was done at 1first floor commercial space upon reviewing. and doing a search on bis/dob now reveal to me that no permit was issued for electrical work for tha

    Mar 6, 2025 · Penalty $1,600

    Resolve
  • Class - 1

    Observed at the time of inspection 3 workers.installing cast iron plumbing waste lines in 1st fl commercial space. workers stated they did the work and work for high quality construction, obtain license

    Mar 6, 2025 · Penalty $5,000

    Resolve
  • Class - 1

    No person shall cause unlicensed electrical work 27-3017 respondent caused unlicensed electrical work by sending and allowing unlicensed and unqualified workers perform electrical work. 3 workers observed perfo

    Mar 6, 2025 · Penalty $4,800

    Resolve
  • Class - 2

    Work without a permit: noted: upon inspection observed in apartment #4 an extension at the rear. the room is approx. 15 ft wide by 15 ft long by 10 ft high. observed a new radiator has been installed. work is 1

    Dec 22, 2020

    Resolve
  • Class - 2

    Work without a permit: noted: upon inspection observed in apartment #4 an extension at the rear. the room is approx. 15 ft wide by 15 ft long by 10 ft high. in the room is a door leading to the outside which ha

    Dec 22, 2020

    Resolve
  • Class - 2

    Work without a permit: noted: upon inspection observed in apartment #4 an extension at the rear. the room is approx. 15 ft wide by 15 ft long by 10 ft high. observed in the room 4 electrical outlets, 1 light sw

    Dec 22, 2020

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner: noted: upon inspection observed in apt#12 cracks along the ceiling & walls. observed cracks along windows,walls & bathroom. several cracks located in bedroom,

    Nov 18, 2019 · Penalty $625

    Resolve
Show 15 more ↓
  • Class - 2

    Work w/out a permit.noted:@time of insp,observed apt 3 & 4 is completely renovated w/new partitions walls,new bathrms new kitchen & new fls.rem:obtain permit.

    Jun 10, 2015 · Penalty $800

    Resolve
  • Class - 1

    Failure to maintain bldg in code-compliant manner.no fire stopping per bc 712.3;27-345.noted:observed @time of insp,several areas an cellar ceiling the fire stopping was missing.rem:provdie/maintain fire stoppi

    Jun 10, 2015 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway.noted:observed @time of insp,public exit passageway is obstructed w/storage bins & householdgarbage.rem:remove obstruction.

    Jun 10, 2015 · Penalty $1,200

    Resolve
  • Class - 2

    Electrical work w/o permit observed at 2pm branch wiring circuit installed, outlets,fixtures,switches,in apt 3 and 4. no application is on file for electric work. rmdy: obtain permit.

    Jun 10, 2015 · Penalty $400

    Resolve
  • Class - 1

    Failure to maintain bldg in code-compliant manner.noted:@rear,observed@time of insp storage of household materials on fire escape & window a.c unit pertuding into fire escape creating a tripping hazard.rem:main

    Jun 10, 2015 · Penalty $1,000

    Resolve
  • Class - 2

    Owner of the bldg failed to notify dept prior to use/install of c-hooks or outriggers beams in connection w/suspended scaffold. noted: work in progress from c-hook suspended scaffold at exposure #3. picture fil

    May 29, 2013

    Resolve
  • Non-hazardous

    Failure to comply w/the commissioners order to correct the violating condition & file a certificate of correction w/the nyc dept of bldg. for notice of vio#34483939n & 34489899p. remedy: correct the violating c

    Dec 27, 2005 · Penalty $10,000

    Resolve
  • Non-hazardous

    Work w/o a permit work noted constructed an elevated extention at rearof apt #4 with windows, and door that leads to a wooden deck with steps to the rear. approx. size is 12 x 12 x 8 ft high. remedy: remove or

    Oct 24, 2005 · Penalty $10,000

    Resolve
  • Non-hazardous

    Work without a permit work noted constructed an extention at thr firstfloor rear at apt # 4 approx 11 x 14 x 8 ft high extension has been e lavated over basement with masonary piers and a wood deck constructed

    Jun 27, 2005 · Penalty $2,500

    Resolve
  • Non-hazardous

    Having installed an akihing without a permit. remedy: remove illegal work.

    May 27, 2003 · Penalty $800

    Resolve
  • Non-hazardous

    Having akining signage not limited to the name and address of the establishment. remedy: remove illegal signage.

    May 27, 2003

    Resolve
  • Non-hazardous

    Having installed an awning without a permit. remedy: remove illegal w ork

    May 27, 2003

    Resolve
  • Non-hazardous

    Having installed a sign without a permit. remedy: remove illegal work.

    May 27, 2003 · Penalty $800

    Resolve
  • Non-hazardous

    -having an illuminated awning sign. -having awning signage not limited to the name & address of the establishment. remedy: remove illegal signage.

    May 27, 2003

    Resolve
  • Non-hazardous

    -having installed an awning without a permit. remedy: remove illegal work

    May 27, 2003 · Penalty $800

    Resolve

Complaints

  • Electric

    Wiring

    Sep 10, 2026 · Apt 12

    Close
  • Door/window

    Window frame

    Sep 10, 2026 · Apt 12

    Close
  • Electric

    Lighting

    Sep 10, 2026 · Apt 12

    Close
  • Paint/plaster

    Ceiling

    Sep 10, 2026 · Apt 12

    Close
  • Flooring/stairs

    Floor

    Sep 10, 2026 · Apt 12

    Close
  • Flooring/stairs

    Floor

    Sep 10, 2026 · Apt 12

    Close
  • Unsanitary condition

    Mold

    Sep 10, 2026 · Apt 12

    Close
  • Paint/plaster

    Ceiling

    Sep 10, 2026 · Apt 12

    Close
  • Electric

    Wiring

    Sep 3, 2026 · Apt 12

    Close
  • Flooring/stairs

    Floor

    Sep 3, 2026 · Apt 12

    Close
Show 40 more ↓
  • Paint/plaster

    Ceiling

    Sep 3, 2026 · Apt 12

    Close
  • Flooring/stairs

    Floor

    Sep 3, 2026 · Apt 12

    Close
  • Electric

    Lighting

    Sep 3, 2026 · Apt 12

    Close
  • Unsanitary condition

    Mold

    Sep 3, 2026 · Apt 12

    Close
  • Door/window

    Window frame

    Sep 3, 2026 · Apt 12

    Close
  • Paint/plaster

    Ceiling

    Sep 3, 2026 · Apt 12

    Close
  • Electric

    Lighting

    Aug 31, 2026 · Apt 12

    Close
  • Flooring/stairs

    Floor

    Aug 27, 2026 · Apt 12

    Close
  • Paint/plaster

    Ceiling

    Aug 27, 2026 · Apt 12

    Close
  • Paint/plaster

    Ceiling

    Aug 27, 2026 · Apt 12

    Close
  • Flooring/stairs

    Floor

    Aug 27, 2026 · Apt 12

    Close
  • Door/window

    Window frame

    Aug 27, 2026 · Apt 12

    Close
  • Unsanitary condition

    Mold

    Apr 6, 2026 · Apt 11

    Close
  • Water leak

    Damp spot

    Apr 6, 2026 · Apt 11

    Close
  • Appliance

    Refrigerator

    Mar 18, 2026 · Apt 22

    Open
  • Unsanitary condition

    Mold

    Mar 10, 2026 · Apt 11

    Close
  • Unsanitary condition

    Mold

    Mar 4, 2026 · Apt 11

    Close
  • Heat/hot water

    Entire building

    Mar 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 3, 2026 · Apt 13

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 11, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 15, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 11, 2025 · Apt 9

    Close
  • Safety

    Window guard broken/missing

    Oct 21, 2025 · Apt COMMON

    Close
  • Unsanitary condition

    Pests

    May 7, 2025 · Apt 20

    Close
  • Unsanitary condition

    Pests

    Aug 21, 2024 · Apt 6

    Close
  • Unsanitary condition

    Pests

    Aug 4, 2024 · Apt 6

    Close
  • Paint/plaster

    Ceiling

    Jul 6, 2024 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Jun 20, 2024 · Apt 12

    Close
  • Unsanitary condition

    Pests

    Jun 15, 2024 · Apt 30

    Close
  • Unsanitary condition

    Pests

    Jun 13, 2024 · Apt 12

    Close
  • Paint/plaster

    Wall

    May 7, 2024 · Apt 6

    Close
  • Unsanitary condition

    Pests

    May 7, 2024 · Apt 6

    Close
  • Unsanitary condition

    Pests

    May 7, 2024 · Apt 6

    Close
  • Heat/hot water

    Entire building

    Nov 10, 2023 · Apt BLDG

    Close

Sales history

DatePriceTypeUnits
Aug 26, 2026$7,300,000Rentals - walkup apartments33

Building details

Building type
Walk-up apartment building (C7)
Year built
1920
Floors
6
Residential units
30
Building area
17,610 ft²
Lot area
3,970 ft²
Zoning
R8A
Community board
103
Council district
2
Block / lot
429 / 45
Assessed value
$2,305,350
Landmark / historic district
No

HPD registration #106118, last renewed Jul 8, 2025.

Questions about 114 East 1 Street

Who owns 114 East 1 Street?

The owner of record in NYC Department of City Planning PLUTO data is 114-16 East 1st LLC.

Does 114 East 1 Street have violations?

Yes. NYC HPD has recorded 533 housing violations at this property.

Is 114 East 1 Street rent stabilized?

NYC Department of Finance tax bills listed 12 rent-stabilized units here in 2024 (about 40% of its 30 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 114 East 1 Street built?

City records list 1920 as the year it was built.

How many apartments are in 114 East 1 Street?

It has 30 residential units and 33 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.