8 Rivington Street
Manhattan, NY 10002BBL 1-00426-0044Map
Owner of record: 8-10 Rivington Realty LLC
8 Rivington Street is a walk-up apartment building built in 1920 in Manhattan, 10002. It has 23 residential units across 6 floors. The owner of record is 8-10 Rivington Realty LLC. HPD has recorded 139 housing violations here, most recently on April 29, 2026. 2 of the 50 most recent violations are still open. City tax records listed 3 rent-stabilized apartments here in 2024.
- HPD violations
- 139
- DOB violations
- 35
- ECB violations
- 22
- HPD complaints
- 147
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 139
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 7, 3rd story, 2nd apartment from south at west
Mar 8, 2026 · Apt 7
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at kitchen and bathroom in the entire apartment located at apt 7, 3rd story, 2nd apartment from south at west
Mar 8, 2026 · Apt 7
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 7, 3rd story, 2nd apartment from south at west
Mar 8, 2026 · Apt 7
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 7, 3rd story, 2nd apartment from south at west
Mar 8, 2026 · Apt 7
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set at building entrance door at public hall, 1st story
Jan 29, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story
Jan 29, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 23, 5th story, 2nd apartment from south at west
Aug 22, 2024 · Apt 23
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective at the north wall with fire retardant material in vestibule area , 1st story
Aug 5, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at the north wall at public hall stairs, 3rd story
Aug 5, 2024
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective at the north wall with fire retardant material at public hall stairs, 3rd story
Aug 5, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at the north wall at public hall stairs, 2nd story
Aug 5, 2024
Closed — Violation dismissed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder welded shoe of drop ladder at fire escape at building front at fire escape
Aug 5, 2024
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroom located at apt 16, 4th story, 1st apartment from east at south
Aug 5, 2024 · Apt 16
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 16, 4th story, 1st apartment from east at south
Aug 5, 2024 · Apt 16
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 16, 4th story, 1st apartment from east at south
Aug 5, 2024 · Apt 16
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 16, 4th story, 1st apartment from east at south
Aug 5, 2024 · Apt 16
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 3rd room from east located at apt 16, 4th story, 1st apartment from east at south
Aug 5, 2024 · Apt 16
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and all walls in the vestibule area , 1st story
Aug 5, 2024
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 16, 4th story, 1st apartment from east at south
Aug 5, 2024 · Apt 16
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective at the north wall with fire retardant materials at public hall stairs, 2nd story
Aug 5, 2024
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 3rd room from east located at apt 16, 4th story, 1st apartment from east at south
Aug 5, 2024 · Apt 16
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 16, 4th story, 1st apartment from south at west
Jul 3, 2024 · Apt 16
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 16, 4th story, 1st apartment from south at west
Sep 3, 2023 · Apt 16
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 11, 3rd story, 1st apartment from west at north
Aug 1, 2023 · Apt 11
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 11, 3rd story, 1st apartment from west at north
Aug 1, 2023 · Apt 11
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 11, 3rd story, 1st apartment from west at north
Aug 1, 2023 · Apt 11
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 11, 3rd story, 1st apartment from west at north
Aug 1, 2023 · Apt 11
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 11, 3rd story, 1st apartment from west at north
Aug 1, 2023 · Apt 11
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 1, 2023
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story
Aug 1, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective vestibule door , 1st story
Jul 23, 2023
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing , 1st story
Jul 23, 2023
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing 11th metal tread from bottom up at building front south at fire escape, 4th story
Feb 2, 2023
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing 8th metal tread from bottom up at building front south at fire escape, 5th story
Feb 2, 2023
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 16, 4th story, 1st apartment from south at west
Feb 2, 2023 · Apt 16
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall , north wall and the ceiling . in the bathroom located at apt 16, 4th story, 1st apartment from south at west
Feb 2, 2023 · Apt 16
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 16, 4th story, 1st apartment from south at west
Feb 2, 2023 · Apt 16
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all components all balconies at 1st fire escape from north at east
Aug 17, 2022
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing 11th metal tread from bottom up at 1st fire escape from east at south, 4th story
Aug 17, 2022
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing 7th metal tread from bottom up at 1st fire escape from east at south, 5th story
Aug 17, 2022
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all the components at all balconies at 1st fire escape from east at south
Aug 17, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 16, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors , in the entrance located at apt 25, 6th story, 1st apartment from north at east
Feb 11, 2020 · Apt 25
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective missing mortar at brick at north and south walls at public hall stairs, 2nd story
Feb 11, 2020
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective missing mortar at brick at north and south walls at public hall stairs, 6th story
Feb 11, 2020
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective missing mortar at brick at north and south walls at public hall stairs, 5th story
Feb 11, 2020
Closed — Violation dismissed
DOB building violations · 35
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 5, 2011
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 5, 2011
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 5, 2011
Dob violation - active
Show 25 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 5, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 5, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 5, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 5, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 3, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 1, 1997
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Jul 1, 1997
Dob violation - active - Construction other optional
C-construction other optional
Dec 4, 1996
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Dec 4, 1996
Dob violation - dismissed
ECB violations · 22
- Class - 1
Failure to maintain building in code compliant manner; observed at exp 3 & 4 facade in state of disrepair. multiple step cracks, spalling paint, bulging & missing bricks and mortar., maintain exterior building
Sep 19, 2025 · Penalty $25,000
Active - Class - 1
Observed at exposures 3&4 step cracks with bulging/missing bricks mortar and spalling paint throughout in various areas maintain exterior building walls
Jun 30, 2023 · Penalty $2,500
Active - Class - 1
Failure to maintain building in code-complaint manner use of prohibited door &/or hardware per 1008.1.8;27-371(j) (1)( ) illegal hardware installed on exit door rear on to street level (2) illegal hardwar
Jul 8, 2011 · Penalty $5,000
Resolve - Class - 1
Occupancy contrary to that allowed by buildings dept records. illegal occupancy noted: (1) 1 floor occupied as a 2 stores & restaurant (2) viewing recreational area (wood deck) at rear extension 1 floor courtya
Jul 7, 2011 · Penalty $12,000
Active - Class - 1
Work w/o permit. work noted: (1) erect wood frame deck at rear extention (roof) 1 floor court yard (2) erect structure w/stair to create mezzanine in apt 24 (3) having install 2 double faced business signs (one
Jul 7, 2011 · Penalty $8,000
Active - Class - 1
Failure to maintain building walls on appurtenances defects noted: having step & diagonal cracks between window lines at various locations on exterior walls exposure #3 & 4 north & east walls. remedy: repair &
Jul 7, 2011 · Penalty $5,000
Active - Class - 1
Failure to maintain building in code-complaint manner. no fire stopping per bc 712.3;27-345 at cellar level boiler room. remedy: provide/maintain fire stopping.
Jul 7, 2011 · Penalty $5,000
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: (1) exit passageway obstructed in cellar,rear yard (court room) (2) at front of premises drop ladder obstructed by sign (exposure #1) remedy: remove obstr
Jul 7, 2011 · Penalty $3,000
Resolve - Class - 1
Sec. 1008.1.2.2 failure to comply w/direction of swing. noted: 2 exit doors leading from rear yard onto street level swing against of egress travel. remedy: comply w/direction of swing.
Jul 7, 2011 · Penalty $8,000
Resolve - Non-hazardous
Work without a permit-expired permit. permit for application alt1#103349084 expired 10-29-05 for conversion of 1st floor west stone into restaurant. remedy: renew permit.
Dec 23, 2005 · Penalty $2,500
Resolve
Show 12 more ↓
- Non-hazardous
Plumbing work performed was requires to be performed by a licensed master plumber. demolition, alteration,renovation and new installation of waste, vent, water, gas piping systems for bathroom and kitchen of ap
Jun 8, 2005 · Penalty $400
Resolve - Hazardous
Failure to have new or altered plumbing system tested. demolition, alteration, renovation and new installation of waste, vent, water, gas piping systems for bathroom and kitchen of apt #19. some plumbing work f
Jun 8, 2005 · Penalty $400
Active - Non-hazardous
Work without a permit expired permit permit under application #103919903 expired 2/20/05 remedy:renew permit
May 17, 2005
Resolve - Non-hazardous
Work does not conform to approved plans under application 103349084 inthat partition layout not as per plans at 1st floor remedy:conform t o approved plans on obtain amendments
Apr 20, 2005 · Penalty $2,500
Active - Non-hazardous
Work contrary to approved palns and application 103392106 in that partitions ships cadder and partitions at apts 23 st 24 are contrary. remedy: stop all work forthwith and conform to plans.
Jul 23, 2003 · Penalty $500
Resolve - Non-hazardous
Failure to maintain building in that two openings exit at the 1st story west store front approx size are 3x3 and 2x4 with floor beams missing. remedy: make all required repairs.
Jul 23, 2003 · Penalty $350
Active - Non-hazardous
Work w/o a permit work noted installed a masonary wall and rated door at the basement east front w/o 1st obtaining a permit.remedy:remove or legalize
Jul 3, 2003 · Penalty $500
Resolve - Hazardous
Required means of efress obstructed: noted at roof level-east facade (sidewalk). a newly constructed storage (10'x10') is blocking the fire escape ladder. remedy: remove obstruction.
Jun 10, 2003
Resolve - Hazardous
Use of rugging equipment without proper danger signs. two point suspension scaffold and ropes not in compliance with building code specifications (1) ropes rotted and frayed (tie backs) (2) two c hooks tie back
Dec 16, 2002 · Penalty $1,250
Active - Non-hazardous
Failure to provide approxed set of plans at time of inspection noted: apt 2 & 3 on 2 floor have been completely demolished with no sepration between apts all floor & ceiling joists exposed all plumbing removed
Sep 17, 2002
Resolve - Hazardous
Failure to maintain exterior wall noted: structured vertical cracks, ranging from 1/4"-3/4" in rear masonry wall (east corner) from 1st floor thru 6 fl -creating a hazardous condition.
Aug 15, 1997 · Penalty $800
Active - Non-hazardous
Failure to maintain. defect is: (1) public stair from 1st to 6th floor with loose bricks at west. (2) couping at roof parapet loose missing. remedy: repair or replace bricks and couping forthwith to the satisfa
Jun 24, 1993
Resolve
Complaints
- Unsanitary condition
Pests
Jul 17, 2026 · Apt 16
Close - Heat/hot water
Apartment only
Mar 6, 2026 · Apt 7
Close - Plumbing
Toilet
Jan 29, 2026 · Apt 2
Close - Plumbing
Basin/sink
Jan 29, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 3
Close - Unsanitary condition
Pests
Jan 24, 2026 · Apt 18
Close - Unsanitary condition
Pests
Jul 14, 2025 · Apt 5
Close - Unsanitary condition
Pests
Aug 12, 2024 · Apt 23
Close - Unsanitary condition
Pests
Jul 29, 2024 · Apt 16
Close - Unsanitary condition
Pests
Jun 23, 2024 · Apt 16
Close
Show 40 more ↓
- Unsanitary condition
Mold
Aug 31, 2023 · Apt 16
Close - Unsanitary condition
Mold
Jul 30, 2023 · Apt 11
Close - Unsanitary condition
Mold
Jul 20, 2023 · Apt 16
Close - Heat/hot water
Entire building
Mar 30, 2023 · Apt BLDG
Close - Plumbing
Water supply
Mar 30, 2023 · Apt 22
Close - Unsanitary condition
Pests
Mar 27, 2023 · Apt APARTM
Close - Unsanitary condition
Mold
Feb 1, 2023 · Apt 16
Close - Paint/plaster
Ceiling
Feb 1, 2023 · Apt 16
Close - Water leak
Heavy flow
Feb 1, 2023 · Apt 16
Close - Electric
Power outage
Jul 12, 2022 · Apt 5
Close - Unsanitary condition
Pests
Aug 23, 2021 · Apt 12
Close - Heat/hot water
Apartment only
Nov 18, 2020 · Apt 23
Close - Heat/hot water
Apartment only
Nov 18, 2020 · Apt 23
Close - Heat/hot water
Entire building
Nov 17, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 7, 2020 · Apt BLDG
Close - Paint/plaster
Radiator
Nov 7, 2018 · Apt 3B
Close - Appliance
Refrigerator
Nov 7, 2018 · Apt 3B
Close - Flooring/stairs
Floor
Nov 7, 2018 · Apt 3B
Close - Plumbing
Toilet
Nov 7, 2018 · Apt 3B
Close - Door/window
Door
Nov 7, 2018 · Apt 3B
Close - Flooring/stairs
Floor
Nov 7, 2018 · Apt 25
Close - Plumbing
Radiator
Nov 7, 2018 · Apt 25
Close - Paint/plaster
Wall
Sep 29, 2018 · Apt 6
Close - Heat/hot water
Apartment only
Apr 15, 2018 · Apt 3
Close - Plumbing
Radiator
Jan 2, 2018 · Apt 5
Close - Plumbing
Radiator
Jan 2, 2018 · Apt 5
Close - Plumbing
Radiator
Jan 2, 2018 · Apt 5
Close - Heat/hot water
Apartment only
Jan 2, 2018 · Apt 5
Close - Heat/hot water
Entire building
Nov 23, 2017 · Apt 7
Close - Heat/hot water
Apartment only
Aug 29, 2017 · Apt 23
Close - Heat/hot water
Entire building
Jan 23, 2017 · Apt 21
Close - Plumbing
Water supply
Feb 20, 2016 · Apt 23
Close - Unsanitary condition
Garbage/recycling storage
Aug 10, 2015 · Apt 26
Close - Unsanitary condition
Pests
Aug 10, 2015 · Apt 26
Close - Unsanitary condition
Pests
Aug 10, 2015 · Apt 26
Close - Unsanitary condition
Garbage/recycling storage
Aug 10, 2015 · Apt 26
Close - Unsanitary condition
Pests
Aug 10, 2015 · Apt 26
Close - Unsanitary condition
Pests
Aug 10, 2015 · Apt 26
Close - Unsanitary condition
Garbage/recycling storage
Aug 10, 2015 · Apt 26
Close - Unsanitary condition
Pests
Aug 10, 2015 · Apt 26
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1920
- Floors
- 6
- Residential units
- 23
- Building area
- 14,928 ft²
- Lot area
- 3,230 ft²
- Zoning
- C6-1
- Community board
- 103
- Council district
- 1
- Block / lot
- 426 / 44
- Assessed value
- $1,787,400
- Landmark / historic district
- No
HPD registration #117714, last renewed Jul 30, 2026.
Questions about 8 Rivington Street
Who owns 8 Rivington Street?
The owner of record in NYC Department of City Planning PLUTO data is 8-10 Rivington Realty LLC.
Does 8 Rivington Street have violations?
Yes. NYC HPD has recorded 139 housing violations at this property.
Is 8 Rivington Street rent stabilized?
NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 13% of its 23 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 8 Rivington Street built?
City records list 1920 as the year it was built.
How many apartments are in 8 Rivington Street?
It has 23 residential units and 25 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.