189 Bowery
Manhattan, NY 10002BBL 1-00425-0004Map
Owner of record: Osib-Bcre Bowery Street Holdings LLC
189 Bowery is a hotel built in 2015 in Manhattan, 10002. The owner of record is Osib-Bcre Bowery Street Holdings LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 14
- ECB violations
- 34
- HPD complaints
- 9
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 27, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 27, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 27, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 27, 2021
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 17, 2021
Dob violation - dismissed
Show 4 more ↓
- Construction other optional
C-construction other optional
Aug 27, 2018
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jul 14, 2016
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Nov 13, 2015
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 25, 2009
Dob violation - dismissed
ECB violations · 34
- Class - 3
Failure to maintain drinking fountain not working, repair and or replace; repair or replace
Jul 25, 2022
Resolve - Class - 1
Violation of discretionary zoning condition on privately owned public spaces(substantial denial of public access). note at time of inspection above address pops was closed w/ barricades around area. sign states
Oct 14, 2020 · Penalty $10,000
Resolve - Class - 1
Tco(not provided)at time of inspection i observed hotel staff/non-gc/building staff furnishing+ walking through an active construction site on several areas of the building.staff member were conducting non-cons
Aug 27, 2018
Resolve - Class - 2
3301.1.2-fireguard(fdny general)at time of inspection i obseved a worker welding horizontal beams at the plaza area of exposure 1.i requested to see a fireguard license from anyone within the general vicinity o
Aug 27, 2018
Resolve - Class - 1
Failure to safeguard all public & property affected by construction oeprations: at the time of my inspection in response to a incident that occured on the previous day at approx 5pm,where the construction fence
Apr 5, 2018
Resolve - Class - 2
Sec: 3314.1. supported scaffold not to code specification. note: @ time of insp observed supported scaffold w/ loose, unsecure netting in various location throughout supported scaffold. rem: comply w/ code.
Dec 8, 2017
Resolve - Class - 1
Fail to perform hydrostatic test -standpipe note:@ the time of my inspection of a 19 story bldg @ 19th flr core approx 190 ft in height construction work in progress. upon request for hydrostatic test to verify
Jul 14, 2016
Resolve - Class - 1
Sec. 3308.7 guardrail system. note: at the time of my inspection of a 19 sty bldg at 7 fl level,construction work in progress. i observed that guardrail system was inadequate as it was loose,gaps & in some case
Apr 19, 2016 · Penalty $1,600
Resolve - Class - 1
Training. note: at the time of my inspection of a 19 sty bldg at 7th fl level,construction work in progress. i observed a worker approx 30 feet in height modifying & adjusting scaffold to accomodate pulley syst
Apr 19, 2016
Resolve - Class - 2
Sec. 3310.9 additional site safety personnel. note: at the time of my inspection of a 19 sty bldg at 7th fl level,construction work in progress. i observed that concrete safety manager #2231,2502,2473,2474 was
Apr 19, 2016
Resolve
Show 24 more ↓
- Class - 1
Failure to safeguard all persons and property affected by constructionoperations. note: sidewalk shed extension has been collapsed and causedamges to the store at next bldg 193 bowery.rmdy:safeguard public and
Feb 16, 2016 · Penalty $1,200
Resolve - Class - 2
Bc3301.7 failure to provide p.e. approved design drawing as noted:at time of inspection at active site observed a concrete blowout to form (caused by) failure at column 4,3rd flr. on site no approved pe design
Feb 4, 2016
Resolve - Class - 1
Failure to safeguard all persons property affected by construction operations as noted: at time of inspection at an active construction siteobserved no overhead protection at exp#1 and exp#3.no safe walkway in
Feb 3, 2016 · Penalty $2,400
Resolve - Class - 1
Bc3301.5 inspection of equipment.any equipment or device except hand tools that affect public safety when operated shall be inspected by person superintending the work or his/or representative before equipme
Feb 3, 2016 · Penalty $1,600
Resolve - Class - 1
No guradrails.at time of insp.notice guardrail is missing at several places of exp.1 and 2 at 1st and 2nd floor.rem:provide guardrail as per code.
Jan 5, 2016 · Penalty $1,200
Resolve - Class - 2
Work does not conform to the approved construction documents.at time of insp.noticed the barriers provided for pedestrian walkway at bowery is not conform to the approved plans.the site safety plan call for dot
Jan 5, 2016
Resolve - Class - 1
Failure to maintain safety equipment measures or temp.construction(no toe boards)at time of insp.noticed toe boards is missing in several places at 1st and 2nd fl at.exp.1 2, 3, & 4.rem:provide boards
Jan 5, 2016
Resolve - Class - 2
Job site fences not maintained pursuant to subsection.at time of insp.noticed job site fencer is not maintained pursuant to subsection the fence have exposed nail,loose wood,viewing panels without plexiglass or
Jan 5, 2016
Resolve - Class - 1
Failure to have site safety manager present as required.note:active construction site of a new building.19 stories,erecting 2nd fl. formwork,at time of inspection 8:10am no site safety manager present.rem:provi
Oct 28, 2015 · Penalty $1,200
Resolve - Class - 2
Failure to maintain adequate housekeeping per section.note active construction site a 19 story building,observed accumulation of combustiblematerials stored at 1st floor consist of various sizes of lumber wood
Oct 22, 2015
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations.at time of inspection active construction site of a 19 stories building observed worker erecting 2nd floor using (titan)form work
Oct 22, 2015 · Penalty $1,200
Resolve - Class - 1
No concrete safety manager present during all phases of concrete operation as required.note:at time of inspection active construction site observed wokers erecting form work of 2nd fl. and no concrete safety ma
Oct 22, 2015 · Penalty $1,200
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection. defect noted: construction site fence erected under job #120836275 issued 7-16-13,expiring 7-16-14 does not comply w/ll 47 or 2013. fence is
Sep 28, 2013 · Penalty $800
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection. defects noted: construction site fence erected under job #120836284 issued 7-16-13,expiring 7-22-14 does not comply w/ll 47 of 2013. fence is
Sep 28, 2013 · Penalty $800
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection. defect noted: construction site fence erected under job #120836248 issued 7-16-13,expiring 7-16-14 does not comply w/ll 47 of 2013. fence is
Sep 28, 2013 · Penalty $800
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection. defects noted: construction site fence erected under job #120836239 issued 7-16-13,expiring 7-16-14 does not comply w/ll 47 of 2013. fence is
Sep 28, 2013 · Penalty $800
Resolve - Class - 2
Temporary construction equipment site - expired permit - upon inspection noted 8ft high solid construction fence exists at this demolition site also noted the permit for the fence (#120836284) has been expired
Jul 16, 2013 · Penalty $800
Resolve - Class - 2
Temporary construction equipment on site - expired permit. upon inspection,noted the permit for job site fence for this demolition site (#120836275) has been expired on 5/10/13. approx 8ft high construction
Jul 16, 2013 · Penalty $800
Resolve - Class - 2
Temporary construction equipment on site - expired permit. upon inspection noted the job site fence exists at this demolition site. also noted the permit #120836239 has been expired on 5/10/13. remedy: renew
Jul 16, 2013 · Penalty $800
Resolve - Class - 2
Temporary construction equipment site - expired permit. upon inspection 8ft high solid construction fence exists at this demolition site as noted the permit (#120836248) for the fence has been expired 5/10/13.
Jul 16, 2013 · Penalty $800
Resolve - Class - 2
Work does not conform to approved plans. sidewalk shed at exposure #1 missing horizontal braces. picture dated. stop all work on sidewalk shed & supported scaffolds. remedy: conform to approved plans.
Jan 31, 2012
Resolve - Class - 1
Outdoor advertising company on display w/o a permit movie the ugly truth remedy:remove illegal sign
Aug 5, 2009 · Penalty $5,000
Resolve - Class - 1
Outdoor advertising company sign not permitted in a c6-01 zoning district movie the ugly truth remedy:remove illegal sign
Aug 5, 2009 · Penalty $5,000
Resolve - Hazardous
Failure to maintain exterior bldg halls hazardous noted south wall rear has significant budlge bow from 2nd fl to parapet 2 north wall at west end of rear entension parapet is significantly buldging bow approx
Aug 20, 2003
Resolve
Complaints
- Unsanitary condition
Pests
Aug 23, 2026 · Apt 1406
Close - Electric
Bell-buzzer/intercom
Feb 8, 2005 · Apt 2
Close - General
Windows
Feb 8, 2005 · Apt 2
Close - General
Locks
Nov 17, 2004 · Apt BLDG
Close - Heating
Heat related
Mar 6, 2003 · Apt 3
Close - Electric
Electric-supply
Feb 22, 2003 · Apt 3
Close - Paint/plaster
Ceiling
Feb 22, 2003 · Apt 3
Close - General
Floor
Feb 22, 2003 · Apt 3
Close - Electric
Bell-buzzer/intercom
Feb 22, 2003 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H2)
- Year built
- 2015
- Floors
- 19
- Residential units
- —
- Building area
- 79,408 ft²
- Lot area
- 19,149 ft²
- Zoning
- C6-1
- Community board
- 103
- Council district
- 1
- Block / lot
- 425 / 4
- Assessed value
- $23,194,350
- Landmark / historic district
- No
Questions about 189 Bowery
Who owns 189 Bowery?
The owner of record in NYC Department of City Planning PLUTO data is Osib-Bcre Bowery Street Holdings LLC.
Does 189 Bowery have violations?
NYC HPD has no housing violations on record for this property.
Is 189 Bowery rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 189 Bowery built?
City records list 2015 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.