159 East Houston Street
Manhattan, NY 10002BBL 1-00417-0018Map
Owner of record: Allen House, LLC C/O
159 East Houston Street is a walk-up apartment building built in 1900 in Manhattan, 10002. It has 33 residential units across 6 floors. The owner of record is Allen House, LLC C/O. HPD has recorded 134 housing violations here, most recently on April 22, 2026. 12 of the 50 most recent violations are still open. City tax records listed 9 rent-stabilized apartments here in 2024.
- HPD violations
- 134
- DOB violations
- 14
- ECB violations
- 51
- HPD complaints
- 355
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 134
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges and door in the entrance located at apt 20, 5th story, 2nd apartment from north at east
Apr 22, 2026 · Apt 20
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the bathroom located at apt 17, 4th story, 2nd apartment from south at west original violation 18301839 issued 15-oct-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Oct 15, 2025 · Apt 17
Open — First no access to re- inspect violation - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 17, 4th story, 2nd apartment from south at west
Oct 15, 2025 · Apt 17
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the bathroom located at apt 17, 4th story, 2nd apartment from south at west
Oct 15, 2025 · Apt 17
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 17, 4th story, 2nd apartment from south at west
Oct 15, 2025 · Apt 17
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 17, 4th story, 2nd apartment from south at west
Oct 15, 2025 · Apt 17
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5, 2nd story, 1st apartment from west at north
Oct 19, 2023 · Apt 5
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5, 2nd story, 1st apartment from west at north
Oct 19, 2023 · Apt 5
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroom located at apt 5, 2nd story, 1st apartment from west at north
Oct 19, 2023 · Apt 5
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 19, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and the ceiling at public hall, 5th story
Oct 5, 2022
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at all walls and the ceiling at public hall, 5th story
Oct 5, 2022
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening of a slide bolt capable of being locked installed at bulkhead door to roof , 6th story
Oct 5, 2022
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and the ceiling at public hall, 6th story
Oct 5, 2022
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak above the ceiling at public hall, 6th story
Oct 5, 2022
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at all walls and the ceiling at public hall, 6th story
Oct 5, 2022
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of uncapped steam pipe in the kitchen located at apt 3, 2nd story, 1st apartment from south at west
May 21, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 3, 2nd story, 1st apartment from south at west
May 21, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st radiator from south at west wall, 1st riser from east at south wall, 1st window frame from south at west wall in the 4th room from north located at apt 3, 2nd story, 1st apartment from south at west
May 21, 2019 · Apt 3
Open — Nov certified late - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, 1st window frame from south at west wall in the 2nd room from north located at apt 3, 2nd story, 1st apartment from south at west
May 21, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
May 21, 2019
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, north wall in the bathroom located at apt 3, 2nd story, 1st apartment from south at west
May 21, 2019 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, north wall in the 3rd room from north located at apt 3, 2nd story, 1st apartment from south at west
May 21, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 3rd room from north located at apt 3, 2nd story, 1st apartment from south at west
May 21, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 2nd riser from south at west wall, 3rd riser from south at west wall, 4th riser from south at west wall in the kitchen located at apt 3, 2nd story, 1st apartment from south at west
May 21, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, ceiling in the kitchen located at apt 3, 2nd story, 1st apartment from south at west
May 21, 2019 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchen located at apt 3, 2nd story, 1st apartment from south at west
May 21, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
May 21, 2019 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
May 21, 2019 · Apt 3
Open — Notice of issuance sent to tenant - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall, 1st riser from south at west wall, south wall, west wall, 2nd window frame from south at west wall in the kitchen located at apt 3, 2nd story, 1st apartment from south at west
May 21, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from south at west wall, 1st riser from west at north wall, east wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 3rd room from north located at apt 3, 2nd story, 1st apartment from south at west
May 21, 2019 · Apt 3
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3, 2nd story, 1st apartment from south at west
May 21, 2019 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3, 2nd story, 1st apartment from south at west
May 19, 2019 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective door molding in the bathroom located at apt 3, 2nd story, 1st apartment from south at west
May 19, 2019 · Apt 3
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the kitchen located at apt 3, 2nd story, 1st apartment from south at west
May 19, 2019 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the kitchen located at apt 3, 2nd story, 1st apartment from south at west
May 19, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
May 19, 2019 · Apt 3
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and all walls in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
May 19, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the 2nd room from north located at apt 3, 2nd story, 1st apartment from south at west
May 19, 2019 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3, 2nd story, 1st apartment from south at west
May 19, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... at public hall, 1st story
Feb 2, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Feb 2, 2019
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Feb 2, 2019
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Feb 2, 2019 · Apt 3
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Feb 2, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water temperature 140 degrees at kitchen and bathroom fixtures in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Feb 2, 2019 · Apt 3
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st story
Feb 2, 2019
Open — Nov sent out
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Electric signs none
Es-electric signs none
May 24, 1990
Dob violation - dismissed - Electric signs none
Es-electric signs none
May 24, 1990
Dob violation - dismissed
Show 4 more ↓
- Electric signs none
Es-electric signs none
Mar 2, 1990
Dob violation - dismissed - Plumbing none
P-plumbing none
May 26, 1989
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 27, 1989
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 27, 1989
Dob violation - dismissed
ECB violations · 51
- Class - 2
Noted illuminated business accessory sign copy "mini cart convienience" with red and blue letters on yellow background approx. 6'x4'x3' at exp.#4 above commercial space installed without a permit., obtain all p
Sep 28, 2026 · Penalty $1,250
Active - Class - 2
Noted power electrical lines (bx) ran to illuminated business accessory sign copy "mini cart convienience" with red and blue letters on yellow background approx. 6'x4'x3' and mini split ac unit at exp.#4 above
Sep 28, 2026 · Penalty $1,250
Active - Class - 1
Observed removal of firestop in commercial space. failure to maintain building in code-compliant manner: no fire stopping. tenant is above commercial space., provide/maintain fire stopping
Jul 10, 2024 · Penalty $2,500
Resolve - Class - 1
Observed exposed wiring throughout commercial space. unapproved/unsafe/unsuitable electrical equipment, apparatus, materials, devices, appliances or wiring in use., comply with ec
Jul 10, 2024 · Penalty $1,600
Resolve - Class - 1
Failure to comply with tpp on fire safety. entire ceiling firestop removed. tpp requires 1 at a time. located at commercial space.; bc 3303.10, comply with code
Jul 10, 2024 · Penalty $5,000
Resolve - Class - 1
Failure to maintain bldg in a code compliant manner: lack of a required number of means of egress for every floor per bc 1018.1 (2008 code);27-366; bc 1021.1 (2014 code) for transient use. rmdy: discontinue
May 29, 2018 · Penalty $2,500
Resolve - Class - 2
Permanent dwelling used/converted for other htan permanent residentialpurposes, buildings dept records indicates bldg to fe legally approvedas a class "a" m.d. now apt #20 illegally used/converted to transient
May 29, 2018 · Penalty $1,250
Resolve - Class - 1
Bc907.2.8 failure to provide class "j" fire alarm system for transient use. rmdy: discontinue illegal occupancy.
May 29, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in a code compliant manner: lack of a system of automatic sprinklers where required per bc 903.2; 27-954 fortransient use. rmdy: discontinue illegal occupancy.
May 29, 2018 · Penalty $2,500
Resolve - Class - 2
Failure to maintain building in code compliant manner:no fire stoping per bc 712.3;27-345.observed in cellar of bilding on side of 205 in room behind boiler room and electrical room a partition left open in
Apr 3, 2017 · Penalty $250
Resolve
Show 40 more ↓
- Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #35065301z issued on 10/4/13 pursuant to 28-204.4 & 1rcny 102-01. failure to maintain bldg in code
Feb 20, 2014 · Penalty $800
Resolve - Class - 2
Approved place of assembly plans not available for inspection. noted: no approved plans for permit #104344005 on site at time of march inspection. remedy: provide approved plans.
Oct 4, 2013 · Penalty $5,000
Resolve - Class - 1
Operation of place of assembly w/o a current c of o. pa permit expired on 5-7-13 #104344005. remedy: renew permit.
Oct 4, 2013 · Penalty $8,000
Resolve - Class - 1
Failure to maintain bldg in a code compliant manner. noted: at cellar of premises d/b/a "national underground" 1) exposed electrical wiring in various locations 2) debris stored in egress hallway. 3) emergency
Oct 4, 2013 · Penalty $10,000
Resolve - Class - 1
Failure to maintain bldg in code compliant manner: open electrical boxand missing fire rating at exit passageway cellar level, occupied by commercial establishment "national underground". remedy:repair/replace
May 3, 2013 · Penalty $1,000
Resolve - Class - 2
Approved pa plans not available for inspection pa #104344005 plans notat site at time of inspection. remedy: provide pa plans.
May 3, 2013 · Penalty $500
Resolve - Class - 2
B254,15,16,32a,34a,50a,b. 50a-chimney base clogged. 50b-
Jan 3, 2012
Resolve - Class - 2
Work w/o a permit: noted: at cellar of eating & drinking establishmentinstalled sprinkler system at cellar only,work is 100% complete. remedy: obtain permit or restore premises to prior legal condition.
May 28, 2009
Resolve - Class - 2
Operation of a place of assembly without a current certificate of operation. note: 1st floor and cellar are being used as a place of assembly without current pa certificate. rem: obtain a current certificate o
May 16, 2009
Resolve - Hazardous
27-1045 suspension elements not vertical or parallel to wall
Jun 10, 2008 · Penalty $500
Resolve - Hazardous
27-1009 less than two tie back per rig operation of hoisting equipment in an unsafe manner one tie back per rig
Jun 10, 2008 · Penalty $4,000
Resolve - Non-hazardous
27-1042 all scaffolds shall be erected and maintained so that the public will not be impaired byfalling material tools debris or by the collapse of the scaffold tie backs and life lines not independed
Jun 10, 2008 · Penalty $500
Resolve - Non-hazardous
26-181(a) no danger signs posted use of rigger equipment w/o proper danger signs
Jun 10, 2008 · Penalty $500
Resolve - Non-hazardous
27-1055 no protection of ropes/cables around sharp bends corners ropes or cables shall not be made fast to sharp objects or surfaces
Jun 10, 2008 · Penalty $500
Resolve - Non-hazardous
27-146 cds notification of use and approved plans/drawings not on siteapproved plans not available for inspection
Jun 10, 2008 · Penalty $500
Resolve - Hazardous
26-172 no licensed rigger or designated forman on site supervision or use of rigging w/o a special riggers license on site no foreman id
Jun 10, 2008 · Penalty $1,250
Resolve - Non-hazardous
26-181.1 workers on scaffold w/o a certificate of fitness licensed rigger failed to ensure scaffold workers met min requirements no certificate of fitness
Jun 10, 2008 · Penalty $1,500
Resolve - Non-hazardous
27-1018 failure to perform adequate housekeeping rood of bldg overloaded
Jun 10, 2008 · Penalty $350
Resolve - Non-hazardous
Failure to provide adequate protection for sidewalks during construction operation. (section of parapet missing) the outer side and ends shall be enclosed with a solid parapet at least 3'-6" high.remedy:provide
Mar 24, 2008 · Penalty $2,000
Resolve - Non-hazardous
Operation of place of assembly w/o a current pa permit. 1st flr and cellar are being used as a pa w/o having a current pa permit. remedy: obtain current pa permit.
Mar 1, 2008 · Penalty $2,500
Resolve - Hazardous
Failure to maintain note rear fire escape in disrepair with broken unsecured steps remedy: maintain bldg and make safe
Jan 3, 2008 · Penalty $2,000
Resolve - Hazardous
Failure to maintain. defects noted: at rear of premises exposure #3 fire escape rusted, having erosion steps are broken. remedy: repair defects, provide engineering report attesting structural stability of fire
Aug 22, 2007 · Penalty $800
Active - Hazardous
Exit door: total obstruction. noted: at rear of premises (exposure #3)exit door which 2nd means of egress from fire escape locked/blocked. remedy: remove obstruction.
Aug 22, 2007 · Penalty $480
Resolve - Non-hazardous
Operation of a place of assembly without a current permit. noted: premises occupied as caberet in cellar and on 1st floor w/more than 74 persons without a valid permit.remedy: obtain valid permit or discontinue
Sep 9, 2005 · Penalty $500
Resolve - Non-hazardous
Operation of place of assembly contrary to department records. noted: cellar and first floor occupied by more than 74 persons as caberet w/ dencing when department records indicates walk-up apartment. remedy:
Sep 9, 2005 · Penalty $350
Resolve - Non-hazardous
Failure to provide proper temination for through the wall exhaust bloer at the 1st fl south exterior unit is less than 10ft away from a residential window 2 installed a/c units & duct work at air shaft southsid
Aug 9, 2004 · Penalty $900
Resolve - Non-hazardous
-having (parallel or wall) signage projecting more than 12in across the street line. remedy: remove illegal signage.
May 27, 2003 · Penalty $400
Resolve - Non-hazardous
-having an illuminated sign larger than 6 sq ft in a windown in a 6-1 district. remedy: remove illegal signage.
May 27, 2003 · Penalty $400
Resolve - Non-hazardous
-having instaled a sign without a permit. -having an illuminated sign without a current permit. remedy: remove illegal work.
May 27, 2003 · Penalty $400
Resolve - Non-hazardous
-having an illuminated awning sign. remedy: remove illegal signage.
May 27, 2003
Resolve - Non-hazardous
-having a light fixture supported by the building, which projects more than 2 ft beyond the street line. remedy:remove illegal work.
May 27, 2003
Resolve - Non-hazardous
-having installed an awning without a permit. remedy: remove illegal work.
May 27, 2003
Resolve - Non-hazardous
- having (parallel or wall) signage projecting more than 12inches across the street line. remedy: remove illegal signage.
May 27, 2003
Resolve - Non-hazardous
-having installed a sign without a permit. -having an illuminated sign without a current permit. remedy: remove illegal work.
May 27, 2003
Resolve - Non-hazardous
-having installed an awning without a permit. remedy: remove illegal work.
May 27, 2003
Active - Non-hazardous
-having an illuminated awning sign. -having awning signage not limited to the name and address of the establishment. remedy: remove illegal signage
May 27, 2003 · Penalty $400
Resolve - Non-hazardous
-having installed an awning without a permit. remedy: remove illegal work.
May 27, 2003 · Penalty $400
Resolve - Non-hazardous
-having (parallel or wall) signage projecting more than 12 inches across the street line. remedy: remove illegal signage.
May 27, 2003
Resolve - Non-hazardous
-having installed a sign without a permit. remedy: remove illegal work.
May 27, 2003
Resolve - Non-hazardous
Failure to maintain building. noted: at various locations throughout masonry stair treads in public hallway broken, chipped and loose. remedy: repair all defects.
Apr 21, 1999 · Penalty $180
Resolve
Complaints
- Plumbing
Water supply
Apr 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2025 · Apt 17
Close - Heat/hot water
Entire building
Oct 13, 2025 · Apt 12
Close - Heat/hot water
Entire building
Nov 12, 2024 · Apt 3
Close - Heat/hot water
Entire building
Feb 21, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 26, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 19, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 15, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2023 · Apt BLDG
Close
Show 40 more ↓
- Door/window
Window frame
Dec 29, 2022 · Apt 19
Close - Heat/hot water
Entire building
Oct 3, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 23, 2022 · Apt 3
Close - Heat/hot water
Apartment only
Nov 23, 2021 · Apt 3
Close - Unsanitary condition
Pests
Nov 8, 2019 · Apt 18
Close - Plumbing
Basin/sink
Nov 8, 2019 · Apt 18
Close - Unsanitary condition
Mold
Nov 8, 2019 · Apt 18
Close - Unsanitary condition
Pests
Nov 8, 2019 · Apt 18
Close - Unsanitary condition
Mold
Nov 7, 2019 · Apt 18
Close - Flooring/stairs
Floor
Nov 7, 2019 · Apt 18
Close - Unsanitary condition
Pests
Nov 7, 2019 · Apt 18
Close - Paint/plaster
Ceiling
Feb 1, 2019 · Apt 3
Close - Electric
Outlet/switch
Feb 1, 2019 · Apt 3
Close - Paint/plaster
Window/frame
Feb 1, 2019 · Apt 3
Close - Paint/plaster
Ceiling
Feb 1, 2019 · Apt 3
Close - Heat/hot water
Apartment only
Feb 1, 2019 · Apt 3
Close - Unsanitary condition
Mold
Feb 1, 2019 · Apt 3
Close - Paint/plaster
Wall
Jul 1, 2018 · Apt 3
Close - Unsanitary condition
Pests
Sep 29, 2016 · Apt 25
Close - Flooring/stairs
Floor
Sep 29, 2016 · Apt 25
Close - Paint/plaster
Ceiling
Sep 29, 2016 · Apt 25
Close - Paint/plaster
Ceiling
Sep 29, 2016 · Apt 25
Close - Unsanitary condition
Pests
Sep 29, 2016 · Apt 25
Close - Unsanitary condition
Mold
Sep 29, 2016 · Apt 25
Close - Flooring/stairs
Floor
Mar 15, 2016 · Apt 19
Close - Paint/plaster
Wall
Mar 15, 2016 · Apt 19
Close - Heat/hot water
Apartment only
Mar 15, 2016 · Apt 19
Close - Water leak
Slow leak
Feb 27, 2016 · Apt 14
Close - Heat/hot water
Entire building
Feb 10, 2016 · Apt 19
Close - Heat/hot water
Entire building
Feb 10, 2016 · Apt 1
Close - Unsanitary condition
Mold
Jun 24, 2015 · Apt 25
Close - Paint/plaster
Ceiling
Jun 24, 2015 · Apt 25
Close - Flooring/stairs
Floor
Jun 24, 2015 · Apt 25
Close - Water leak
Heavy flow
Jun 24, 2015 · Apt 25
Close - Paint/plaster
Ceiling
Jun 24, 2015 · Apt 25
Close - Unsanitary condition
Pests
Jun 24, 2015 · Apt 25
Close - Unsanitary condition
Pests
Jun 24, 2015 · Apt 25
Close - Electric
Outlet/switch
Jun 24, 2015 · Apt 25
Close - Paint/plaster
Wall
Jun 24, 2015 · Apt 25
Close - Unsanitary condition
Garbage/recycling storage
Jun 24, 2015 · Apt 25
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1900
- Floors
- 6
- Residential units
- 33
- Building area
- 24,251 ft²
- Lot area
- 4,940 ft²
- Zoning
- C6-2A
- Community board
- 103
- Council district
- 1
- Block / lot
- 417 / 18
- Assessed value
- $3,943,800
- Landmark / historic district
- No
HPD registration #109622, last renewed Aug 6, 2025.
Questions about 159 East Houston Street
Who owns 159 East Houston Street?
The owner of record in NYC Department of City Planning PLUTO data is Allen House, LLC C/O.
Does 159 East Houston Street have violations?
Yes. NYC HPD has recorded 134 housing violations at this property.
Is 159 East Houston Street rent stabilized?
NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2024 (about 27% of its 33 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 159 East Houston Street built?
City records list 1900 as the year it was built.
How many apartments are in 159 East Houston Street?
It has 33 residential units and 38 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.