106 Eldridge Street
Manhattan, NY 10002BBL 1-00413-0001Map
Owner of record: Wai Kee Enterprise,inc.
106 Eldridge Street is a walk-up apartment building built in 1910 in Manhattan, 10002. It has 16 residential units across 5 floors. The owner of record is Wai Kee Enterprise,inc.. HPD has recorded 408 housing violations here, most recently on April 29, 2026. 13 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 408
- DOB violations
- 14
- ECB violations
- 21
- HPD complaints
- 563
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 408
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective steel diamond plate at floor yard at east
May 27, 2025
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of plexi glass at building entrance door at public hall, 1st story
Aug 20, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 4th room from east located at apt 3, 2nd story, 1st apartment from south at west
Dec 22, 2022 · Apt 3
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from east located at apt 3, 2nd story, 1st apartment from south at west
Dec 22, 2022 · Apt 3
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 3, 2nd story, 1st apartment from south at west
Dec 22, 2022 · Apt 3
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the bathroom located at apt 3, 2nd story, 1st apartment from south at west
Dec 22, 2022 · Apt 3
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 2, 2nd story, 2nd apartment from north at east
Dec 22, 2022 · Apt 2
Open — Not complied with
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 2, 2nd story, 2nd apartment from north at east
Dec 22, 2022 · Apt 2
Open — Not complied with - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Dec 21, 2022
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 2nd apartment from east at south
Dec 21, 2022 · Apt 2
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint fire escape at west yard
Sep 7, 2022
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at the ceiling at boiler room
Apr 20, 2022
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at boiler room
Apr 20, 2022
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling at public hall, 1st story
Apr 20, 2022
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Apr 20, 2022
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling at bulkhead , 5th story
Apr 20, 2022
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at the ceiling at bulkhead , 5th story
Apr 20, 2022
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at bulkhead , 5th story
Apr 20, 2022
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 12a, 5th story, 1st apartment from west at north
Apr 20, 2022 · Apt 12A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 12a, 5th story, 1st apartment from west at north
Apr 20, 2022 · Apt 12A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 12a, 5th story, 1st apartment from west at north
Apr 20, 2022 · Apt 12A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 12a, 5th story, 1st apartment from west at north
Apr 20, 2022 · Apt 12A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the kitchen located at apt 10, 4th story, 1st apartment from north at east
Apr 20, 2022 · Apt 10
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling and all walls in the kitchen located at apt 10, 4th story, 1st apartment from north at east
Apr 20, 2022 · Apt 10
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 10, 4th story, 1st apartment from north at east
Apr 20, 2022 · Apt 10
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 10, 4th story, 1st apartment from north at east
Apr 20, 2022 · Apt 10
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 2, 2nd story, 1st apartment from west at north
Apr 20, 2022 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the missing escutcheon plate at top of riser at south wall in the bathroom located at apt 10, 4th story, 1st apartment from north at east
Apr 20, 2022 · Apt 10
Open — Not complied with - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 10, 4th story, 1st apartment from north at east
Apr 20, 2022 · Apt 10
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at cellar
Apr 20, 2022
Closed — Violation closed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling at cellar
Apr 20, 2022
Open — Not complied with - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes house hold items at 3 and 4 sty rear yard
Mar 8, 2022
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system cellar door lock at front yard
Jan 28, 2022
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 16, 5th story, 2nd apartment from south at west
Jan 28, 2022 · Apt 16
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 16, 5th story, 2nd apartment from south at west
Jan 28, 2022 · Apt 16
Closed — Violation closed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at building rear at fire escape
Jan 22, 2022
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door to basement locked at public hall, 1st story
Jan 22, 2022
Closed — Violation closed - BHazardous
Replace with new the broken or defective vestibule door at public hall, 1st story
Jan 22, 2022
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 3rd sty balcony at building rear at fire escape
Jan 22, 2022
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 4th sty balcony at building rear at fire escape
Jan 22, 2022
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories, all balconies, and all components at building rear at fire escape
Jan 22, 2022
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of awning obstructing drop ladder at building front at fire escape
Jan 22, 2022
Closed — Violation closed - CImmediately hazardous
Code: arrange and make self-closing the doors .. in the entrance located at apt 7, 3rd story, 1st apartment from north at east
Jan 22, 2022 · Apt 7
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7, 3rd story, 1st apartment from north at east
Jan 22, 2022 · Apt 7
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 7, 3rd story, 1st apartment from north at east
Jan 22, 2022 · Apt 7
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 13, 5th story, 1st apartment from west at north
Dec 20, 2021 · Apt 13
Closed — Violation closed
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 29, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 3, 2021
Dob violation - dismissed - Immediate emergency anythingoptional
Install approximately 35 linear feet of sidewalk shed along exposure 1 (eldridge street) to safeguard the public and property
Dec 1, 2020
Dob violation - dismissed - Construction other optional
Failure to maintain building in a code compliant manner. at time of inspection observed stucco finish of facade at 2nd floor has dislodged and fallen to sidewalk, also noted stucco at 2nd floor between window spalling and at left corner stucco missing.
Nov 30, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 22, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active
Show 4 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
May 7, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed
ECB violations · 21
- Class - 1
Failure to maintain building in code compliant manner. at time of inspection observed at expo#3 fire escape landings & drop ladder obstructed by household items, garbage receptacles. also interior public hallwa
Apr 8, 2026 · Penalty $2,500
Active - Class - 2
As per class 2ýb265¨ 28-303.7 failure to file a complete boiler inspection report as per dob records;correct violation and submit the certificate of correction
Feb 24, 2022 · Penalty $625
Resolve - Class - 1
No compliance or certificate of correction submitted to dob for the correction of violation # 34932458n issued on 2/22/2013, comply with commissioner's order
Sep 16, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to provide approved/accepted construction documents at jobsiteat time of inspection.note at the time of inspection of a 5 story facade jobsite in progress.upon request for approved plans facade plans ap
Jun 24, 2021
Resolve - Class - 2
3314.3.4 loads imposed.note at the time of inspection of an active 5 story facade job in progress,i observed sidewalk shed and supported pipe scaffold in place.both had been installed by seperate contractors.a
Jun 24, 2021
Resolve - Class - 1
3314.1 unsafe supported pipe scaffold.note at the time of inspection iobserved supported pipe scaffold in place.the following unsafe conditions were observed:missing guardrails,net fully planked at working leve
Jun 24, 2021 · Penalty $2,500
Resolve - Class - 1
3314.4.5.2 training for supported scaffold users.note at the time of inspection of a 5 story building under active facade work i observed work being done on supported pipe scaffold.upon request for training car
Jun 24, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to maintain bldg in code compliant manner atoi noted:@facade exp1 missing &/or loose stucco.comply w/code.
Apr 1, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to maintain building in code-compliant manner noted:at time ofmy inspection i observed at exposure#1 finish stucco at the corner at 2nd floor and 16 right side missing stucco and also various cracks thr
Feb 8, 2021 · Penalty $625
Resolve - Class - 1
At front of building, stucco finish of coins at corner at 2nd floor has pieces dislodging and fallen to sidewalk, also noted at 2nd floor at corner stucco missing., maintain exterior building wall
Nov 30, 2020 · Penalty $2,500
Resolve
Show 11 more ↓
- Class - 1
Failure to comply with the commissioners order contained in summons/violation#39011627k issued on 10-22-2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01 work without a permit (
Oct 9, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#39011627k issued on 10/22/19 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. work w/o permit. permit#140915767 submitted 8/6/20
Aug 11, 2020 · Penalty $6,250
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#39011627k issued on 10/22/19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o permit. remedy: comply w/comm's order &/or file a c of
Feb 1, 2020 · Penalty $2,500
Resolve - Class - 1
Work without a permit. noted: in basement of building, front side in vault area excavation and removal of aprox. 16 inches of conctere and dirt to deepen the basement. 80% work completed. also installation of s
Oct 22, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to comply w/the commissioner's order ot file a certificate of correction w/dob inspection time: 10:35am at above date. at time of inspection i observed on flrs 1-5 gas meters and gas piping installed
Jun 19, 2015 · Penalty $800
Active - Class - 2
Failure to maintain bldg in code-compliant manner re: installation maintenance of plumbing materials equipment per fgc 406.6. 2 gas meters installed in an improper location. in the 5 stories residential bldg
Feb 22, 2013 · Penalty $500
Resolve - Class - 2
Failure building in code-complaint manner. noted: at 5th fl south west corner masonry cracked,spalled & displaced. remedy: make safe immediately remove loose material & maintain.
Jun 9, 2011 · Penalty $2,500
Resolve - Hazardous
Work without a permit. hazardous erected a wooden sidewalk shed. shed is leaning to tha south approx 8" all vertical supports are not out ofplumb. remove unsalt shed immediately file plans obtain all approvals
Apr 1, 1999 · Penalty $200
Resolve - Non-hazardous
Gas piping installed in stair enclosure noted gas piping installed in public hallways from 1st floor to 5th floor w/gas meters attached to piping frm 2nd -5th and electrical piping installed adjacent to gas pip
Nov 9, 1998 · Penalty $400
Active - Hazardous
Failure to maintain exterior building wall. noted: decorative brownstone above all windows: "window lintels & sills" cracked & missing throughout 1fl-5fl-west wall. location: front facade-west wall. remedy:
May 11, 1998 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior building wall (hazardous) defect is: 1)bulged masuoy wall at 5 floor south side of building (bulled approx 10" inch & from front of building to rear. 2)cracked loose and defective
May 6, 1998 · Penalty $2,500
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Apr 6, 2026 · Apt 12A
Close - Paint/plaster
Wall
Apr 6, 2026 · Apt 12A
Close - Flooring/stairs
Floor
Apr 6, 2026 · Apt 12A
Close - Unsanitary condition
Pests
Apr 6, 2026 · Apt 12A
Close - General
Janitor/super
Apr 6, 2026 · Apt 12A
Close - Unsanitary condition
Garbage/recycling storage
Apr 6, 2026 · Apt 12A
Close - Paint/plaster
Wall
Apr 6, 2026 · Apt 12A
Close - Unsanitary condition
Garbage/recycling storage
Mar 16, 2025 · Apt 12A5TH
Close - Flooring/stairs
Floor
Mar 16, 2025 · Apt 12A
Close - Heat/hot water
Entire building
Mar 16, 2025 · Apt BLDG
Close
Show 40 more ↓
- Door/window
Door
Feb 20, 2025 · Apt 12A
Close - Door/window
Door
Feb 20, 2025 · Apt 12A
Close - Unsanitary condition
Garbage/recycling storage
Feb 20, 2025 · Apt 12A
Close - Heat/hot water
Apartment only
Jan 7, 2025 · Apt 12A
Close - Elevator
Maintenance
Feb 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2023 · Apt 5
Close - Heat/hot water
Entire building
Oct 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 19, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 4, 2023 · Apt 5
Close - Heat/hot water
Entire building
Feb 1, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 26, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 26, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 25, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 19, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 19, 2022 · Apt 2
Close - Door/window
Door
Sep 3, 2022 · Apt BLDG
Close - Appliance
Electric/gas range
Aug 31, 2022 · Apt 13
Close - Outside building
Roofing
Aug 31, 2022 · Apt 13
Close - Safety
Fire escape
Aug 31, 2022 · Apt 13
Close - Heat/hot water
Entire building
Jan 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2021 · Apt 7
Close - Heat/hot water
Entire building
Dec 14, 2021 · Apt 13
Close - Unsanitary condition
Pests
Dec 12, 2021 · Apt 13
Close - Unsanitary condition
Pests
Dec 12, 2021 · Apt 13
Close - Door/window
Door
Dec 12, 2021 · Apt 13
Close - Unsanitary condition
Garbage/recycling storage
Dec 12, 2021 · Apt 13
Close - Heat/hot water
Entire building
Dec 12, 2021 · Apt 13
Close - Heat/hot water
Entire building
Dec 6, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 23, 2021 · Apt BLDG
Close - Unsanitary condition
Pests
Nov 22, 2021 · Apt 13
Close - Unsanitary condition
Pests
Nov 22, 2021 · Apt 13
Close - Door/window
Door
Nov 22, 2021 · Apt 13
Close - Heat/hot water
Entire building
Feb 17, 2020 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 17, 2020 · Apt 12A
Close - Heat/hot water
Entire building
Feb 16, 2020 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 16, 2020 · Apt 12A
Close - Heat/hot water
Entire building
Feb 16, 2020 · Apt NO
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1910
- Floors
- 5
- Residential units
- 16
- Building area
- 9,030 ft²
- Lot area
- 2,206 ft²
- Zoning
- C4-4A
- Community board
- 103
- Council district
- 1
- Block / lot
- 413 / 1
- Assessed value
- $580,500
- Landmark / historic district
- No
HPD registration #101729, last renewed Oct 31, 2025.
Questions about 106 Eldridge Street
Who owns 106 Eldridge Street?
The owner of record in NYC Department of City Planning PLUTO data is Wai Kee Enterprise,inc..
Does 106 Eldridge Street have violations?
Yes. NYC HPD has recorded 408 housing violations at this property.
Is 106 Eldridge Street rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 100% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 106 Eldridge Street built?
City records list 1910 as the year it was built.
How many apartments are in 106 Eldridge Street?
It has 16 residential units and 18 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.