roofy

112 Stanton Street

Manhattan, NY 10002BBL 1-00412-0076Map

Owner of record: 112 Stanton Street LLC

112 Stanton Street is a mixed residential and retail building built in 1910 in Manhattan, 10002. It has 6 residential units across 6 floors. The owner of record is 112 Stanton Street LLC. HPD has recorded 37 housing violations here, most recently on May 21, 2026. 25 of the 37 most recent violations are still open. City tax records listed 3 rent-stabilized apartments here in 2024.

HPD violations
37
DOB violations
4
ECB violations
5
HPD complaints
1

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 21, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
3
About 50% of the building's 6 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 37

  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    May 21, 2026

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4, 4th story, 1st apartment from east at south

    May 21, 2026 · Apt 4

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4, 4th story, 1st apartment from east at south

    May 21, 2026 · Apt 4

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective water proof material at bathtub exterior in the bathroom located at apt 4, 4th story, 1st apartment from east at south

    May 21, 2026 · Apt 4

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    May 21, 2026

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    May 21, 2026

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    May 21, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    May 21, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    May 21, 2026

    Open — Nov sent out
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    May 21, 2026

    Open — Nov sent out
Show 27 more ↓
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    May 21, 2026

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    May 21, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Nov 8, 2025

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the bathroom located at apt 4, 4th story, 1st apartment from east at south

    Nov 8, 2025 · Apt 4

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Nov 8, 2025

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    Nov 8, 2025

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Nov 8, 2025

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Nov 8, 2025

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Nov 8, 2025

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door to boiler room locked at cellar

    Sep 8, 2025

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4, 4th story, 1st apartment from east at south

    Sep 8, 2025 · Apt 4

    Open — Not complied with
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4, 4th story, 1st apartment from east at south

    Sep 8, 2025 · Apt 4

    Open — Not complied with
  • A

    Properly repair with similar material the broken or defective ceramic wall tile at the south wall, and the west wall in the bathroom located at apt 4, 4th story, 1st apartment from east at south

    Sep 8, 2025 · Apt 4

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color around the bathtub in the bathroom located at apt 4, 4th story, 1st apartment from east at south

    Sep 8, 2025 · Apt 4

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroom located at apt 4, 4th story, 1st apartment from east at south

    Sep 8, 2025 · Apt 4

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft. at the east wall, south wall, and the ceiling in the bathroom located at apt 4, 4th story, 1st apartment from east at south

    Sep 8, 2025 · Apt 4

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at the sink in the kitchen located at apt 4, 4th story, 1st apartment from east at south

    Sep 8, 2025 · Apt 4

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft. at the east wall, south wall, and the ceiling in the bathroom located at apt 4, 4th story, 1st apartment from east at south original violation 18213100 issued 08-sep-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Sep 8, 2025 · Apt 4

    Open — Not complied with
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4, 4th story, 1st apartment from east at south

    Sep 8, 2025 · Apt 4

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 4, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 15, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 16, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 16, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 1, 2021

    Closed — Violation dismissed

DOB building violations · 4

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 12, 2015

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 19, 2007

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Oct 14, 1994

    Vp-violation unserved ecb-active
  • Construction other optional

    C-construction other optional

    Oct 14, 1994

    Dob violation - dismissed

ECB violations · 5

  • Class - 1

    Work w/o a permit.2:03 pm.@ time of insp.i observed new gas piping with an tee from 5th fl apt.gas meter to supply gas to store hot water heater.no permits on file for diversion of gas.illegal gas connection no

    May 21, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard public & property.affected by construction operations.defect noted:storing propane tank.(6)2401b(4)201b & storing debris & combustible materials thru out & removed fore rating from 1 flr.ce

    Jun 2, 2012 · Penalty $1,000

    Resolve
  • Class - 1

    B154,51. 51 sealed gas hot water heated, improper flue, not connected to chimney carbon monoxide. repair immediately do not put back into operation w/o dob inspection 212 566-5432.

    Oct 3, 2008 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to maintain bldg -in that metal covering over window at the 5th flr west, is loose, defection flapping and in danger of falling to sidewalk below. remedy: remove forthwith

    Oct 26, 2005 · Penalty $2,500

    Resolve
  • Non-hazardous

    Failure to maintain stair tread, fire escape at front 2nd story one side loose. remedy:- check all bolts and replace to the satisfaction of this department.

    Oct 19, 1993

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Sep 7, 2025 · Apt 4

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S5)
Year built
1910
Floors
6
Residential units
6
Building area
10,648 ft²
Lot area
1,894 ft²
Zoning
C4-4A
Community board
103
Council district
1
Block / lot
412 / 76
Assessed value
$3,708,900
Landmark / historic district
No

HPD registration #143909, last renewed Dec 2, 2025.

Questions about 112 Stanton Street

Who owns 112 Stanton Street?

The owner of record in NYC Department of City Planning PLUTO data is 112 Stanton Street LLC.

Does 112 Stanton Street have violations?

Yes. NYC HPD has recorded 37 housing violations at this property.

Is 112 Stanton Street rent stabilized?

NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 50% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 112 Stanton Street built?

City records list 1910 as the year it was built.

How many apartments are in 112 Stanton Street?

It has 6 residential units and 7 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.