101 Rivington Street
Manhattan, NY 10002BBL 1-00410-0046Map
Owner of record: Zeliks Equities LLC
101 Rivington Street is a walk-up apartment building built in 1910 in Manhattan, 10002. It has 25 residential units across 6 floors. The owner of record is Zeliks Equities LLC. HPD has recorded 202 housing violations here, most recently on March 20, 2026. 5 of the 50 most recent violations are still open. City tax records listed 15 rent-stabilized apartments here in 2024.
- HPD violations
- 202
- DOB violations
- 5
- ECB violations
- 11
- HPD complaints
- 234
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 202
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3d, 4th story, 1st apartment from north at east
Mar 20, 2026 · Apt 3D
Closed — Violation dismissed - BHazardous
Provide provide security in the event of a power outage with and mechanical heavey duty latch set and assemble at entrance door to buyilding , 1st story
Jan 14, 2026
Closed — Violation dismissed - BHazardous
Remove the illegal fastening an unacceptable electromagnetic locking device installed at building entrance door to building , 1st story
Jan 14, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall and ceiling at public hall, 1st story
Dec 31, 2025
Closed — Violation dismissed - BHazardous
Provide heavy duty latch set and assembly at entrance door to building , 1st story
Dec 31, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in vestibule , 1st story
Dec 31, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at west wall in vestibule , 1st story
Dec 31, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at west wall and ceiling at public hall, 1st story
Dec 31, 2025
Closed — Violation dismissed - BHazardous
Remove the illegal fastening dual motion electromagnetic lock at entrance door to building , 1st story
Dec 31, 2025
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1b, 2nd story, 2nd apartment from east at south
Dec 14, 2025 · Apt 1B
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1b, 2nd story, 2nd apartment from east at south
Dec 14, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at building entrance , 1st story
Feb 28, 2025
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of a unacceptable electromagnetic locking device installed at building entrance door , 1st story
Feb 28, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household item mattress at public hall, 1st story
Feb 28, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective 7th and 13th marble stair treads from the bottom up at public hall stairs, 1st story
Feb 28, 2025
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective 1st marble stair tread from the bottom at public hall stairs, 2nd story
Feb 28, 2025
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling approx 15 sq.ft, total approx 15 sq.ft in the bathroom located at apt 3b, 4th story, 2nd apartment from east at south
May 8, 2024 · Apt 3B
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 3b, 4th story, 2nd apartment from east at south
May 8, 2024 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 3b, 4th story, 2nd apartment from east at south
May 8, 2024 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3b, 4th story, 2nd apartment from east at south
May 8, 2024 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3b, 4th story, 2nd apartment from east at south
May 8, 2024 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Repair leaky water closet flush pipe connection , in the bathroom located at apt 3b, 4th story, 2nd apartment from east at south
May 8, 2024 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1b, 2nd story, 2nd apartment from east at south
Jan 17, 2024 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exceeding the maximum allow temperature of 130 degrees in the entire apartment located at apt 1b, 2nd story, 2nd apartment from east at south
Jan 17, 2024 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 16, 2022
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner unit installed at window 2nd story balcony at north stack
Sep 2, 2020
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner unit installed at window 3rd story balcony at north stack
Sep 2, 2020
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner unit installed at window 5th story balcony at north stack
Sep 2, 2020
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner unit installed at window 3rd story balcony at building front
Sep 2, 2020
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner unit installed at window 4th story balcony at building front
Sep 2, 2020
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner unit installed at window 6th story balcony at building front
Sep 2, 2020
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner unit installed at window 4th story balcony at north stack
Sep 2, 2020
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 3c, 4th story, 1st apartment from south at west
Aug 29, 2020 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3c, 4th story, 1st apartment from south at west
Aug 29, 2020 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3c, 4th story, 1st apartment from south at west
Aug 29, 2020 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the kitchen located at apt 3c, 3rd story, 1st apartment from south at west
Dec 29, 2019 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 3c, 3rd story, 1st apartment from south at west
Dec 29, 2019 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation metal door in the entrance located at apt 3c, 3rd story, 1st apartment from south at west
Dec 29, 2019 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3c, 3rd story, 1st apartment from south at west
Dec 29, 2019 · Apt 3C
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at north wall in the bathroom located at apt 3c, 3rd story, 1st apartment from south at west
Dec 29, 2019 · Apt 3C
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 3c, 3rd story, 1st apartment from south at west
Dec 29, 2019 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 3c, 3rd story, 1st apartment from south at west
Dec 29, 2019 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 3c, 3rd story, 1st apartment from south at west
Dec 29, 2019 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balance at upper window sash at north wall in the 1st room from north located at apt 3c, 3rd story, 1st apartment from south at west
Dec 29, 2019 · Apt 3C
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling in the 1st bathroom from north located at apt 3c, 3rd story, 1st apartment from north at east original violation 13488641 issued 23-dec-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Dec 23, 2019 · Apt 3C
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st bathroom from north located at apt 3c, 3rd story, 1st apartment from north at east
Dec 23, 2019 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling in the 1st bathroom from north located at apt 3c, 3rd story, 1st apartment from north at east
Dec 23, 2019 · Apt 3C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st bathroom from north located at apt 3c, 3rd story, 1st apartment from north at east
Dec 23, 2019 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3c, 3rd story, 1st apartment from north at east
Dec 23, 2019 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ......, in the entrance located at apt 3c, 3rd story, 1st apartment from north at east
Dec 23, 2019 · Apt 3C
Closed — Violation dismissed
DOB building violations · 5
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 9, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 11
- Class - 2
Heating system-boilerroom sign not readable from front door sign must be moved where it can be read from front door as pernych maintenance code(hmc) 27-2033 submit a certificate of correction
Jul 30, 2021 · Penalty $625
Resolve - Class - 1
Failure to comply w/commissioner's order to correct condition cited innov #34823124k.remedy:comply with code.
Jan 20, 2011
Resolve - Class - 2
Failure to maintain bldg walls & appurtenances. noted: at time of inspection ac units installed @ north & west elevations over public sidewalk w/no (ozun) approved supports, braces screwed to blocks of wood
Nov 18, 2010 · Penalty $250
Resolve - Class - 2
Failure to comply w/the comm's order to filr a c/c w/the dob for nov 34823124k, a false certification was filed on 7.29.10. remedy: comply w/code.
Nov 18, 2010
Resolve - Class - 1
Filed a c of c or order related material containing material false staement respondent filed a c of c on 7-29-10 for nov 34823124k upon inspection found that the condition which respondent described as having
Nov 18, 2010
Resolve - Class - 2
Failure to maintain bldg walls and/or appurtenances. noted at time of inspection window a/c's installed in windows and at various flrs throughout bldg supported by wood blocks or unapproved supports. remedy:
Jan 14, 2010 · Penalty $250
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: at time of inspection exterior fire escapes located @ west of north elevations are obstructed by a/c installed in windows decreasing width of walkway for
Jan 14, 2010 · Penalty $1,200
Resolve - Class - 1
Failure to maintain bldg wall noted at exp #1 west side off ludlow st facade at 2nd fl nw separation of brick crack approx 5' in length lentils at 2nd fl cracked missing from facade 3rd fl also lentils spawling
May 6, 2009 · Penalty $1,000
Resolve - Non-hazardous
Operation of place of assembly w/o a current permit. no permit for application #104635728. occupied by more than 100 people. remedy:obtain apa permit.
Jun 29, 2008 · Penalty $500
Resolve - Non-hazardous
Work w/o a permit work noted installed plywood partitions from floor to ceiling in apt 2e 2nd floor to create an additional bedroom w/o first obtaining permits & approvals. remedy: remove or legalize if feasibl
Aug 15, 2007 · Penalty $250
Resolve
Show 1 more ↓
- Hazardous
Failure to maintain exterior bldg wall:defect noted:(1)defective/broken-8' (hazardous) decorative column fell onto sidewalk on ludlow (2)deteriortated/holes in metal cornice side at roof level on ludlow and
Jan 16, 2004 · Penalty $800
Resolve
Complaints
- Door/window
Door
Sep 26, 2026 · Apt 1B
Open - Heat/hot water
Entire building
Mar 18, 2026 · Apt BUILDI
Close - Water leak
Heavy flow
Mar 4, 2026 · Apt 3B
Close - Electric
Outlet/switch
Mar 4, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Jan 13, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 13, 2026 · Apt 1B
Close - Heat/hot water
Entire building
Jan 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2026 · Apt 1B
Close - Heat/hot water
Apartment only
Dec 28, 2025 · Apt 5A
Close - Heat/hot water
Apartment only
Dec 27, 2025 · Apt 5A
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 15, 2025 · Apt 1B
Close - Heat/hot water
Apartment only
Dec 14, 2025 · Apt 1B
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt 1B
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt 1B
Close - Heat/hot water
Apartment only
Dec 9, 2025 · Apt 1B
Close - Heat/hot water
Apartment only
Dec 5, 2025 · Apt 5A
Close - Heat/hot water
Entire building
Dec 2, 2024 · Apt BLDG
Close - Paint/plaster
Ceiling
Apr 26, 2024 · Apt 3B
Close - Plumbing
Toilet
Apr 26, 2024 · Apt 3B
Close - Water leak
Heavy flow
Apr 26, 2024 · Apt 3B
Close - Door/window
Door
Apr 26, 2024 · Apt 3B
Close - Heat/hot water
Apartment only
Jan 16, 2024 · Apt 1B
Close - Unsanitary condition
Pests
Mar 15, 2023 · Apt 1C
Close - Appliance
Electric/gas range
Nov 18, 2022 · Apt 3C
Close - Heat/hot water
Apartment only
Sep 29, 2022 · Apt 2E
Close - Heat/hot water
Apartment only
Jul 11, 2022 · Apt 3A
Close - Heat/hot water
Apartment only
Jul 9, 2022 · Apt 3A
Close - Heat/hot water
Apartment only
Jul 5, 2022 · Apt 3A
Close - Heat/hot water
Apartment only
Jun 22, 2022 · Apt 3A
Close - Heat/hot water
Apartment only
Feb 1, 2021 · Apt 1C
Close - Plumbing
Basin/sink
Aug 27, 2020 · Apt 3A
Close - Plumbing
Basin/sink
Aug 27, 2020 · Apt 3A
Close - Heat/hot water
Entire building
Feb 7, 2020 · Apt 1A
Close - Paint/plaster
Ceiling
Dec 20, 2019 · Apt 3C
Close - Paint/plaster
Ceiling
Dec 20, 2019 · Apt 3C
Close - Heat/hot water
Entire building
Oct 27, 2019 · Apt 5D
Close - Heat/hot water
Entire building
Oct 25, 2019 · Apt 5D
Close - Heat/hot water
Apartment only
Oct 25, 2019 · Apt 5D
Close - Heat/hot water
Entire building
Oct 24, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 20, 2019 · Apt 2E
Close - Heat/hot water
Entire building
Oct 20, 2019 · Apt BLDG
Close - Paint/plaster
Ceiling
Jul 6, 2018 · Apt 3B
Close - Plumbing
Toilet
Jul 6, 2018 · Apt 3B
Close - Flooring/stairs
Floor
Jul 6, 2018 · Apt 3B
Close - Paint/plaster
Wall
Jul 6, 2018 · Apt 3B
Close - General
Cabinet
Jul 6, 2018 · Apt 3B
Close - Electric
Lighting
Jul 6, 2018 · Apt 3B
Close - Electric
Outlet/switch
Jul 6, 2018 · Apt 3B
Close - Heat/hot water
Entire building
Jan 6, 2018 · Apt 5E
Close - Heat/hot water
Apartment only
Nov 18, 2017 · Apt 5E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1910
- Floors
- 6
- Residential units
- 25
- Building area
- 20,580 ft²
- Lot area
- 3,433 ft²
- Zoning
- C4-4A
- Community board
- 103
- Council district
- 1
- Block / lot
- 410 / 46
- Assessed value
- $1,799,550
- Landmark / historic district
- No
HPD registration #100697, last renewed Aug 25, 2025.
Questions about 101 Rivington Street
Who owns 101 Rivington Street?
The owner of record in NYC Department of City Planning PLUTO data is Zeliks Equities LLC.
Does 101 Rivington Street have violations?
Yes. NYC HPD has recorded 202 housing violations at this property.
Is 101 Rivington Street rent stabilized?
NYC Department of Finance tax bills listed 15 rent-stabilized units here in 2024 (about 60% of its 25 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 101 Rivington Street built?
City records list 1910 as the year it was built.
How many apartments are in 101 Rivington Street?
It has 25 residential units and 28 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.