522 East 11 Street
Manhattan, NY 10009BBL 1-00404-0016Map
Owner of record: 522 E 11th LLC
522 East 11 Street is a walk-up apartment building built in 1900 in Manhattan, 10009. It has 23 residential units across 6 floors. The owner of record is 522 E 11th LLC. HPD has recorded 95 housing violations here, most recently on April 29, 2026. 2 of the 50 most recent violations are still open. City tax records listed 5 rent-stabilized apartments here in 2024.
- HPD violations
- 95
- DOB violations
- 19
- ECB violations
- 37
- HPD complaints
- 166
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 95
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective ...glass pane at lower sash at east 1 window in the kitchen located at apt 20, 5th story, 1st apartment from north at east
Jan 19, 2026 · Apt 20
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules ...missing located at apt 20, 5th story, 1st apartment from north at east
Jan 19, 2026 · Apt 20
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations ....missing located at apt 20, 5th story, 1st apartment from north at east
Jan 19, 2026 · Apt 20
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets ...at bathtub in the bathroom located at apt 20, 5th story, 1st apartment from north at east
Jan 19, 2026 · Apt 20
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ...door and frame at bulkhead to the roof
Jan 19, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ...door and frame at vestibule , 1st story
Jan 19, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jul 7, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th story
Jul 7, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th story
Jul 7, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and north wall at bulkhead roof
Jul 7, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at bulkhead roof
Jul 7, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Feb 14, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Feb 14, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Feb 14, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Feb 14, 2022
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Feb 14, 2022
Open — Nov sent out - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Feb 14, 2022
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Oct 5, 2021
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Oct 5, 2021
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jul 28, 2021
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at building rear yard
Jul 28, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective bottom rail of upper sash at 1st window from east at north wall, 4th story at center court yard
Jan 7, 2021
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective window pane at upper sash at south wall in the bathroom located at apt 17, 4th story, 1st apartment from south at west
Jan 7, 2021 · Apt 17
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of east window at south wall sealed with sheet rock and ceramic tiles creating shower stall in the bathroom located at apt 17, 4th story, 1st apartment from south at west
Jan 7, 2021 · Apt 17
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 1st story
Feb 18, 2020
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Feb 18, 2020
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story
Feb 18, 2020
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Feb 18, 2020
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors .. in the entrance located at apt 5, 2nd story, 1st apartment from north at east
Feb 11, 2020 · Apt 5
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 5th story
Feb 11, 2020
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defectivce located at apt 10, 3rd story, 1st apartment from north at east
Feb 11, 2020 · Apt 10
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector deffective located at apt 10, 3rd story, 1st apartment from north at east
Feb 11, 2020 · Apt 10
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration east window at south wall sealed with sheet rock and ceramic tiles in the bathroom located at apt 17, 5th story, 1st apartment from west at north
Feb 11, 2020 · Apt 17
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective upper window sash glass pane at south wall in the bathroom located at apt 17, 5th story, 1st apartment from west at north
Feb 11, 2020 · Apt 17
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 17, 5th story, 1st apartment from west at north
Feb 11, 2020 · Apt 17
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 17, 5th story, 1st apartment from west at north
Feb 11, 2020 · Apt 17
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors .. in the entrance located at apt 17, 5th story, 1st apartment from west at north
Feb 11, 2020 · Apt 17
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective 2 sq ft of fire retardant material at bulkhead ceiling at public hall
Feb 11, 2020
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at all walls at bulkhead at public hall
Feb 11, 2020
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at bulkhead ceiling and all walls at public hall
Feb 11, 2020
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak throuughout bulkhead ceiling at public hall
Feb 11, 2020
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors roof bulkhead door at public hall
Feb 11, 2020
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors .. in the entrance located at apt 10, 3rd story, 1st apartment from north at east
Feb 11, 2020 · Apt 10
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of 4 free standing radiators on the floor at rear at public hall, 1st story
Feb 26, 2014
Closed — Violation closed
DOB building violations · 19
- Failure to correct swarmp conditions (facade) facade required
Failure to correct swarmp conditions
Nov 1, 2023
Dob violation - active - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Feb 16, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 27, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 15, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 15, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 7, 2021
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - active - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
Show 9 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
May 25, 1993
V%-dob violation - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
May 25, 1993
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
May 25, 1993
Dob violation - active - Unsafe buildings none
Ub-unsafe buildings none
May 25, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
May 24, 1993
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
May 24, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 37
- Class - 2
Failure to maintain exterior facade and appurtenances. note: observed at exposure 1(north ele) an inadequate repair at cracked window on the6th floor spalling/damaged watertable on 1st floor and a cracked terra
Nov 25, 2024 · Penalty $6,250
Active - Class - 1
Failure to provide unobstructed exit passageway. note: at time of inspection observed itens store at fire escape landing at exposure 1 northelevation 2nd floor. remedy: remove obstruction.
Aug 26, 2024 · Penalty $312
Resolve - Class - 1
Failure to maintain exterior walls/facade and appurtenances: observed at exposure 1 north elevation crack window pane at 6 floor west, bowedlintel at entrance with damaged/corroded material direct over building
Aug 26, 2024 · Penalty $2,500
Resolve - Class - 2
Failure to file acceptable amended cycle 7a, 8a, and 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #900755. remedy: file acceptable re
Jan 16, 2024 · Penalty $3,125
Resolve - Class - 2
Failure to maintain building in code-compliant manner.note:at time of inspection at an occupied family dwelling observed piles of bags spread out at back(rear)of building containing construction debris with ope
Feb 16, 2023
Resolve - Class - 2
Failure to submit an acceptable required cycle 7a,8a,and 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#900755.agg2 history of noncom
Dec 9, 2022 · Penalty $6,250
Resolve - Class - 1
Failure to provide unobstructed exit passageway.note at the time of inspection 11/4/2022,observed obstruct at fire escape on floors 2 and 3.remedy:remove obstruction.
Nov 4, 2022 · Penalty $312
Resolve - Class - 2
Debris in boiler room, return pipe corroaded,exposed wiring,excessive soot condition, burner not properly sealed. correct violating conditions and submit a certificate of correction.
Apr 26, 2022 · Penalty $310
Resolve - Class - 2
Failure to maintain building exterior walls/facade and appurtenances:note:at time of inspection viewed damaged masonry/falled stucco at 5th floor and damaged decorative stone at 2nd floor.remedy:maintain buildi
Sep 4, 2021
Resolve - Class - 2
Work without a permit. at time of inspection of apartment 17 observed a erected full height partition wall blocking window in bathroom., obtain all permits
Aug 26, 2021
Resolve
Show 27 more ↓
- Class - 2
Work w/o a permit. note:at time of inspection observed at above premise in basement newly installed sheetrock w/ bx cables exposed,new and exposed wiring in electrical boxes,switches and lights. a search on dob
Aug 24, 2021 · Penalty $625
Resolve - Class - 1
Failure to maintain exterior building facade and appurtenances.note atthe time of inspection observed defective facade exp1 north elevation observed loose spalling masonry brick,missing mortar joints and stucco
Jul 21, 2021 · Penalty $6,250
Resolve - Class - 1
Failure to take and provide safety measures such as sidewalk shed,netting,etc to protect and secure public safety from documented unsafe facade.the unsafe notification from pe/ra filed on 6/11/2021.no safety me
Jul 21, 2021 · Penalty $10,000
Resolve - Class - 1
Unlawful acts of failure to comply with an order of the commissioner. note at the time of inspection no facade repair work in progress and previous summons#35559989x and 35559990n dated on 6/16/2021 has not bee
Jul 21, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to maintain exterior building facade and appurtenances.noted at time of inspection;north elevation exp #1 on east 11th street loose spalling masonry brick with open and missing mortar joints and missing
Jun 16, 2021 · Penalty $2,500
Resolve - Class - 1
28-302.5 failue to take and provide safety measures sidewalk shed netting esc to protect and secure public safety from documented unsafe facade.the unsafe notification (f up 3) received from pe1ra on 06/11/2021
Jun 16, 2021 · Penalty $2,530
Resolve - Class - 2
Failure to submit acceptable required cycle7a&8a report of critical exam documenting condition of exterior wall&appurtenances required by28-302.4 for control800755.submit acceptable required technical report
Jun 1, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances.note atthe time of inspection observed defective facade at exp1 north elevation.1)spalled bricks and stucco at 6th floor.2)chipped keystone at 2nd
May 27, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to provide unobstructed exit passageway.note as previously stated in violation#35449230l issued on 3/6/2021.there are still blue plastic container pillows obstructing the fire escapes on the 5th and 3rd
Apr 17, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances.note:observed at exposure#1(east 11st)spalling bricks and stucco at 6th floorand chipped keystone at 2nd floor.remedy:maintain exterior building an
Apr 17, 2021 · Penalty $620
Resolve - Class - 1
Failure to provide unobstructed exit passageway.at time of inspection observed exposure #1,north elevation.fire escape at 5th fl level or landing tray & 1 blue bucket,create obstruction exit passageway.remedy:
Mar 6, 2021 · Penalty $312
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/violation #35264133k,issued on 07-13-2017 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.remedy:comply w/commissioner's
Mar 6, 2021 · Penalty $1,250
Resolve - Class - 2
No boiler room access sign visible from front door. correct violating condition and submit a cert of correction
Oct 23, 2020
Resolve - Class - 2
Failure to submit an acceptable required cycle 7a & 8a report criticalexamination documenting condition of exterior wall & appurtenances required by 28-302.4 for control#800755. agg2 history of noncompliance on
May 20, 2020 · Penalty $5,000
Resolve - Class - 1
Failure to maintain building north elev exp1 fire escape 1-5th flr black circular device or landing planter loose white wire on fire escape 3-3rd flr screen on fire escape landing. rmdy: maintain exterior build
Jul 13, 2017 · Penalty $250
Resolve - Class - 2
Failure to maintain exterior bldg north elev exp#1. bulging of stucco parapet-decorative masonry window header 6 fl cracked 5th ban bulging chipped window sills fls 3 & 4 fire escape 3 & 4fl landing flower pots
Oct 19, 2016
Resolve - Class - 2
Failure to submit acceptable 7th round report of critical examin ation documenting condition of exterior walls and appurtenances required by 28-302.4. agg2 history of noncompliance on 36027879y (agg1),360
Aug 11, 2016 · Penalty $2,000
Resolve - Class - 2
Failure to file an acceptable technical report in compliance w/code provisions:periodic insp of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.rem:file the required r
Sep 15, 2015 · Penalty $2,000
Resolve - Class - 2
Failure to maintain exterior bilding north elevation exp#1. 1-north elev exp#1 has spalling on parapet level along entire length of buildingnorth elevation exp#1 water table has spalling all along the front edg
Aug 19, 2015 · Penalty $500
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
May 21, 2015 · Penalty $800
Resolve - Class - 2
Sec. 28-3110.4 fire escape drop ladder noted existing fire escape dropladders. located at exposure 2 rear & 3 not held in proper position guide (hook) as per multiple dwelling law 53.54 evident. remedy: comply
May 23, 2013
Resolve - Class - 3
Fail to maintain bldg wall or appurtenances noted@ 6th flr exposure #1 apt #26 windows @ front of bldg in disrepair, window panes dislocked falling to street rotten thru also all other windows @ apt#26 in dis
Nov 23, 2009
Resolve - Class - 1
Failure to maintain building walls & appurtenance.- (i)landing of staircase was found unsecure & "shaking" due to damaged anchorage at 1/f level at west court-yard (ii) spalled window sill were found at 3/f at
Jan 27, 2009 · Penalty $1,000
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 & the dob rules & regulations
Nov 21, 2008 · Penalty $800
Resolve - Hazardous
Hazardous failure to naintain exterior bldg wall defect is decorative metal cornice at parapet wall is loose corroded and defective decorativ metal molding at 5th story is also loose corroded and defective at n
May 23, 1993
Resolve - Hazardous
Failure to maintain exterior building defect is cornice at roof level n - e corner loose nd dangling and in danger of collapse remedy provide shed over sidewalk and repair cornice or remove forthwith
Mar 5, 1993
Resolve - Hazardous
Failure to maintain exterior building wall defect is section of roof cornice at front is open and defective brickwork at front above 6th stox window lintel parapet level is missing and defective located at eas
Mar 4, 1993 · Penalty $1,000
Resolve
Complaints
- Door/window
Door
Jul 22, 2026 · Apt 15
Close - Heat/hot water
Apartment only
Apr 24, 2026 · Apt 20
Close - Heat/hot water
Apartment only
Mar 18, 2026 · Apt 25
Close - Heat/hot water
Apartment only
Mar 16, 2026 · Apt 25
Close - Heat/hot water
Apartment only
Mar 16, 2026 · Apt 25
Close - Heat/hot water
Entire building
Mar 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 14, 2026 · Apt 17
Close - Heat/hot water
Apartment only
Mar 13, 2026 · Apt 20
Close - Heat/hot water
Apartment only
Jan 17, 2026 · Apt 20
Close - Heat/hot water
Apartment only
Jun 13, 2025 · Apt 20
Close
Show 40 more ↓
- Heat/hot water
Entire building
Nov 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 6, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
May 16, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
May 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
May 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
May 14, 2022 · Apt 15
Close - Heat/hot water
Entire building
Mar 24, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 23, 2022 · Apt 20
Close - Water leak
Slow leak
Jan 5, 2022 · Apt 13
Close - Safety
Carbon monoxide detector
Jan 5, 2022 · Apt 13
Close - General
Ventilation system
Jan 5, 2022 · Apt 13
Close - Paint/plaster
Radiator
Jan 5, 2022 · Apt 13
Close - Unsanitary condition
Pests
Jan 5, 2022 · Apt 13
Close - Plumbing
Bathtub/shower
Jan 5, 2022 · Apt 13
Close - Unsanitary condition
Mold
Jan 5, 2022 · Apt 13
Close - General
Janitor/super
Aug 25, 2021 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
Aug 24, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 24, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 31, 2021 · Apt 3
Close - Paint/plaster
Ceiling
Jul 31, 2021 · Apt 3
Close - Flooring/stairs
Floor
Jul 31, 2021 · Apt 3
Close - Unsanitary condition
Garbage/recycling storage
Jul 17, 2021 · Apt BLDG
Close - Safety
Fire escape
Jul 17, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 17, 2021 · Apt BLDG
Close - Unsanitary condition
Mold
Jul 16, 2021 · Apt 12
Close - Unsanitary condition
Pests
Jul 14, 2021 · Apt 12
Close - General
Cooking gas
Jul 14, 2021 · Apt 12
Close - Paint/plaster
Ceiling
Jul 14, 2021 · Apt 12
Close - Unsanitary condition
Pests
Jul 14, 2021 · Apt 12
Close - Appliance
Electric/gas range
Jul 14, 2021 · Apt 12
Close - Unsanitary condition
Garbage/recycling storage
Jul 14, 2021 · Apt 12
Close - Flooring/stairs
Floor
Jul 14, 2021 · Apt 3
Close - Unsanitary condition
Pests
Jul 14, 2021 · Apt 3
Close - Flooring/stairs
Floor
Jul 14, 2021 · Apt 3
Close - Unsanitary condition
Sewage
Jul 14, 2021 · Apt 3
Close - Unsanitary condition
Garbage/recycling storage
Jun 28, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 28, 2021 · Apt BLDG
Close - Water leak
Slow leak
Jun 13, 2021 · Apt 21
Close - Door/window
Door
May 27, 2021 · Apt 1B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1900
- Floors
- 6
- Residential units
- 23
- Building area
- 13,476 ft²
- Lot area
- 3,555 ft²
- Zoning
- R8B
- Community board
- 103
- Council district
- 2
- Block / lot
- 404 / 16
- Assessed value
- $1,461,600
- Landmark / historic district
- No
HPD registration #118989, last renewed Jul 30, 2026.
Questions about 522 East 11 Street
Who owns 522 East 11 Street?
The owner of record in NYC Department of City Planning PLUTO data is 522 E 11th LLC.
Does 522 East 11 Street have violations?
Yes. NYC HPD has recorded 95 housing violations at this property.
Is 522 East 11 Street rent stabilized?
NYC Department of Finance tax bills listed 5 rent-stabilized units here in 2024 (about 22% of its 23 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 522 East 11 Street built?
City records list 1900 as the year it was built.
How many apartments are in 522 East 11 Street?
It has 23 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.