529 East 6 Street
Manhattan, NY 10009BBL 1-00402-0051Map
Owner of record: 529 E. 6 LLC
529 East 6 Street is a walk-up apartment building built in 1915 in Manhattan, 10009. It has 14 residential units across 5 floors. The owner of record is 529 E. 6 LLC. HPD has recorded 139 housing violations here, most recently on December 20, 2024. 3 of the 50 most recent violations are still open. City tax records listed 7 rent-stabilized apartments here in 2024.
- HPD violations
- 139
- DOB violations
- 16
- ECB violations
- 16
- HPD complaints
- 125
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 139
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2b, 1st story, 1st apartment from north at east
Dec 20, 2024 · Apt 2B
Open — Invalid certification - BHazardous
Refit sliding entrance door in the 5th room from north located at bsmt-apt 1a, 1st story, 1st bsmt-apt from south at west
Apr 24, 2023 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system at ceiling in the 1st bathroom from north located at bsmt-apt 1a, 1st story, 1st bsmt-apt from south at west
Apr 24, 2023 · Apt 1A
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 1, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening push bar at bulkhead door leading to roof does not allow reentry to builing at public hall, 5th story
Mar 3, 2020
Closed — Violation dismissed - ANon-hazardous
Remove device preventing door from being self-closing hook and eye installed on interior street entrance door to the building at public hall, 1st story
Feb 25, 2020
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Feb 25, 2020
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system key not on premisys at public hall, 1st story
Feb 25, 2020
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Feb 25, 2020
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Feb 25, 2020
Closed — Violation dismissed - BHazardous
Properly secure the loose marble tread 9th up from bottom at public hall stairs, 1st story
Feb 25, 2020
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories,balconies and componets at building rear fire escape
Feb 25, 2020
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of air conditioner unit installed at window obstructing egress at 5th story balcony building rear fire escape
Feb 25, 2020
Closed — Violation dismissed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at building rear
Feb 25, 2020
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story
Feb 25, 2020
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 5th story
Feb 25, 2020
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of cracked vinyl floor tiles creating a trip hazzard at public hall, 5th story
Feb 25, 2020
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 4th story
Feb 25, 2020
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 4th story
Feb 25, 2020
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of cracked vinyl floor tiles creating a trip hazzard at public hall, 4th story
Feb 25, 2020
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of partition wall erected from floor to ceiling covering entrance door to apartment located at east at public hall, 4th story
Feb 25, 2020
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed on room door leading to fire escape window in the 4th room from north located at apt 2f lower level, 5th story, 1st apartment from north at east
Feb 25, 2020 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2f lower level, 5th story, 1st apartment from north at east
Feb 25, 2020 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors to basement at public hall, 1st story
Jun 18, 2019
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of eye lets installed with padlock on enterior door at south west 4f at public hall, 5th story
Jun 18, 2019
Closed — Violation dismissed - ANon-hazardous
Paint or post a sign indicating floors all stories at public hall
Jun 18, 2019
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of construction material, dry wall, buckets, ladder, broom and dust pan at public hall, 1st story
Jun 17, 2019
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 17, 2019
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system not on premises at public hall, 1st story
Jun 17, 2019
Closed — Violation dismissed - ANon-hazardous
Paint or post a sign indicating floors all stories at public hall
Jun 10, 2019
Closed — Violation dismissed - ANon-hazardous
Refit shower stall door in the bathroom located at apt 1e, 4th story, 1st apartment from south at west
May 28, 2019 · Apt 1E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th story
May 28, 2019
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 4th story
May 28, 2019
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling ,north, south and east walls in the kitchen located at apt 1e, 4th story, 1st apartment from south at west
May 28, 2019 · Apt 1E
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 1e, 4th story, 1st apartment from south at west
May 28, 2019 · Apt 1E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east, north and south walls in the 3rd room from north located at apt 1e, 4th story, 1st apartment from south at west
May 28, 2019 · Apt 1E
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak throughout ceiling at public hall, 4th story
May 28, 2019
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 2nd room from north located at apt 1e, 4th story, 1st apartment from south at west
May 28, 2019 · Apt 1E
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 1e, 4th story, 1st apartment from south at west
May 28, 2019 · Apt 1E
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum of 100 watts as required(light fixtyre(s) present). at front areaway
May 22, 2019
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from east at south wall in the 2nd room from north at west located at apt 3c, 2nd story, 1st apartment from east at south
Mar 14, 2019 · Apt 3C
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, west wall, ceiling in the 2nd room from north at west located at apt 3c, 2nd story, 1st apartment from east at south
Mar 14, 2019 · Apt 3C
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors .... in the entrance located at apt 3c, 2nd story, 1st apartment from east at south
Mar 14, 2019 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3c, 2nd story, 1st apartment from east at south
Mar 14, 2019 · Apt 3C
Closed — Violation closed - BHazardous
Repair or replace the smoke detector inoperative in the entire apartment located at apt 3c, 2nd story, 1st apartment from east at south
Mar 14, 2019 · Apt 3C
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative in the entire apartment located at apt 3c, 2nd story, 1st apartment from east at south
Mar 14, 2019 · Apt 3C
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Mar 15, 2018
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th story
Mar 8, 2018
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retarding ceiling at public hall, 4th story
Mar 8, 2018
Closed — Violation closed
DOB building violations · 16
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 1, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 1, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 1, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 1, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed
Show 6 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 16
- Class - 2
Permanent dwelling used/converted for other than permanent-residentialpurposes. dob records indicates premises to be legally approved as class "a" multiple dwelling. noted: now unit #2b at the 1st floor is used
Jan 12, 2026 · Penalty $2,500
Active - Class - 1
Bc 907.2.8. failure to provide a class "j" fire alarm system for transient use at unit #2b on the 1st floor. remedy: discontinue illegal occupancy.
Jan 12, 2026 · Penalty $2,500
Active - Class - 1
Failure to maintain building in code-compliant manner. lack or required number of means of egress for every floor, as per bc 1018.1(2008 code); 27-366 bc 1021.1(2014 code); bc 1006.3(2022 code) for transient us
Jan 12, 2026 · Penalty $2,500
Active - Class - 1
Failure to maintain building in code-compliant manner. lack of a system of automatic sprinklers where required as per bc 903.2 and 27-954 for transient use at unit #2b on the 1st floor. remedy: discontinue ille
Jan 12, 2026 · Penalty $2,500
Active - Class - 1
Failure to maintain building in code-complaint manner i observed in apartment 2f which is combined apartment with 3f and 3e gas dryer was installed without having a valve behind gas dryer also the vent to gas d
Feb 27, 2020
Resolve - Class - 1
Failure to have new altered plumbing system tested i observed in apartment 2f which is a combined apartment with 3f and 3e installed gas dryer without having permits therefore no test, perform test
Feb 27, 2020
Resolve - Class - 1
Work without a permit i observed in apartment 2f which is a combined apartment with 3f and 3e installed gas piping to gas dryer without any permits work was done 100 percent utility lock gas, obtain permit
Feb 27, 2020
Resolve - Class - 1
Gas being supplied to building without inspection and certification by dob i observed in apartment 2f which is a combined apartment with 3f and 3e gas supplying gas dryer without proper inspection and certifica
Feb 27, 2020
Resolve - Class - 2
Work w/o a permit: new waste piping in basement. inspection time:2:35 on 10-05-15, i observed in basement of above cited property new no-hubcast iron piping throughout basement.there is no permit on file for
Oct 5, 2015 · Penalty $800
Active - Class - 1
Failure to maintain bldg in code compliant manner. lack of a system ofautomatic sprinklers where required per bc903.2 & 27-954 for transient use. remedy: discontinue illegal occupancy.
Apr 10, 2015 · Penalty $1,000
Resolve
Show 6 more ↓
- Class - 1
Sec. 907.2.8 failure to provide fire alarm system for transient use. remedy: discontinue illegal occupancy.
Apr 10, 2015 · Penalty $1,600
Resolve - Class - 2
Permanent dwelling used/converted for other that permanent residentialpurposes. dob records indicates that bldg to be legally approved as a class'a'multiple dwelling. new apt #1b illegally used/converted into
Apr 10, 2015 · Penalty $1,600
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. failure to provide # of required means of egress for every floor per bc1018.1;27-366 for transient use. remedy: discontinue illegal occupancy.
Apr 10, 2015 · Penalty $1,200
Resolve - Class - 1
Failure to maintain bldg in code compliant manner:i observed @ 2:30pm throughout bldg gas has been shut off by conedison since 12/12/14 due to gas leaks.no permit has been filed to date to correct the leaks & r
Apr 6, 2015 · Penalty $1,000
Resolve - Class - 2
Work w/o a permit. note: job #120676848 obtain for renovation of existing apt if w/new skylight and new roof deck. at time of inspection observed a bulkhead approx. 6'w x 6'l x 8'h w/a door and window erected
Jun 8, 2013
Resolve - Class - 2
Work does not conform to approved construction document &/or approved amendments.defect noted:@ time of inspec. structural steel installed between floor joists for support of roof & chimney during demolition of
Jul 29, 2011
Resolve
Complaints
- Heat/hot water
Apartment only
Feb 21, 2025 · Apt 2B
Close - Plumbing
Basin/sink
Dec 17, 2024 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 17, 2024 · Apt 2B
Close - Plumbing
Water supply
Mar 6, 2024 · Apt 2F
Close - Unsanitary condition
Mold
Apr 18, 2023 · Apt 1A
Close - Water leak
Heavy flow
Aug 21, 2021 · Apt 2A
Close - Water leak
Heavy flow
Aug 21, 2021 · Apt FROMTH
Close - Appliance
Electric/gas range
Oct 5, 2020 · Apt 1E
Close - Unsanitary condition
Pests
Oct 5, 2020 · Apt 1E
Close - Appliance
Electric/gas range
Oct 5, 2020 · Apt 1E
Close
Show 40 more ↓
- Electric
Wiring
Jul 8, 2019 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
Jun 20, 2019 · Apt BLDG
Close - Paint/plaster
Wall
May 24, 2019 · Apt 1E
Close - Plumbing
Basin/sink
May 24, 2019 · Apt 1E
Close - Paint/plaster
Ceiling
May 24, 2019 · Apt 1E
Close - Paint/plaster
Window/frame
Mar 6, 2019 · Apt 3C
Close - Door/window
Window frame
Feb 18, 2018 · Apt 2F
Close - Water leak
Slow leak
Feb 18, 2018 · Apt 2F
Close - Door/window
Window frame
Feb 18, 2018 · Apt 2F
Close - Door/window
Window frame
Nov 17, 2017 · Apt 2F
Close - Flooring/stairs
Floor
Nov 17, 2017 · Apt 2F
Close - Flooring/stairs
Floor
Nov 17, 2017 · Apt 2F
Close - Door/window
Window frame
Nov 17, 2017 · Apt 2F
Close - Door/window
Window frame
Nov 17, 2017 · Apt 2F
Close - Paint/plaster
Ceiling
Mar 17, 2017 · Apt 2F
Close - Water leak
Slow leak
Mar 17, 2017 · Apt 2F
Close - Water leak
Slow leak
Mar 17, 2017 · Apt 2F
Close - Water leak
Damp spot
Mar 17, 2017 · Apt 2F
Close - Water leak
Damp spot
Mar 17, 2017 · Apt 2F
Close - Paint/plaster
Ceiling
Mar 17, 2017 · Apt 2F
Close - General
Cooking gas
Jan 27, 2017 · Apt 2D
Close - Flooring/stairs
Floor
Aug 4, 2016 · Apt 2F
Close - Flooring/stairs
Floor
Aug 4, 2016 · Apt 2F
Close - Paint/plaster
Wall
Aug 4, 2016 · Apt 2F
Close - Door/window
Window frame
Aug 4, 2016 · Apt 2F
Close - Plumbing
Basin/sink
Aug 4, 2016 · Apt 2F
Close - Door/window
Window frame
Aug 4, 2016 · Apt 2F
Close - Plumbing
Bathtub/shower
Jul 17, 2016 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
Jul 16, 2016 · Apt 2F
Close - Plumbing
Water supply
Apr 22, 2016 · Apt 2F
Close - Plumbing
Water supply
Apr 21, 2016 · Apt 2F
Close - Heat/hot water
Entire building
Mar 18, 2016 · Apt 2F
Close - Door/window
Window frame
Mar 7, 2016 · Apt 2F
Close - Door/window
Window frame
Mar 7, 2016 · Apt 2F
Close - Door/window
Door
Feb 17, 2016 · Apt 2F
Close - Door/window
Door
Feb 17, 2016 · Apt 2F
Close - Heat/hot water
Entire building
Jan 26, 2016 · Apt 1C
Close - Heat/hot water
Entire building
Jan 26, 2016 · Apt 1C
Close - Heat/hot water
Entire building
Jan 26, 2016 · Apt BLDG
Close - Unsanitary condition
Sewage
Jan 18, 2016 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C5)
- Year built
- 1915
- Floors
- 5
- Residential units
- 14
- Building area
- 8,200 ft²
- Lot area
- 2,271 ft²
- Zoning
- R7B
- Community board
- 103
- Council district
- 2
- Block / lot
- 402 / 51
- Assessed value
- $918,450
- Landmark / historic district
- No
HPD registration #121750, last renewed Sep 29, 2025.
Questions about 529 East 6 Street
Who owns 529 East 6 Street?
The owner of record in NYC Department of City Planning PLUTO data is 529 E. 6 LLC.
Does 529 East 6 Street have violations?
Yes. NYC HPD has recorded 139 housing violations at this property.
Is 529 East 6 Street rent stabilized?
NYC Department of Finance tax bills listed 7 rent-stabilized units here in 2024 (about 50% of its 14 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 529 East 6 Street built?
City records list 1915 as the year it was built.
How many apartments are in 529 East 6 Street?
It has 14 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.