543 East 6 Street
Manhattan, NY 10009BBL 1-00402-0044Map
Owner of record: 543 East 6th Street Owner LLC
543 East 6 Street is a walk-up apartment building built in 1930 in Manhattan, 10009. It has 8 residential units across 5 floors. The owner of record is 543 East 6th Street Owner LLC. HPD has recorded 111 housing violations here, most recently on September 2, 2026. 13 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 111
- DOB violations
- 9
- ECB violations
- 13
- HPD complaints
- 143
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 111
- CImmediately hazardous
Properly repair or replace the broken or defective 3rd to 10th risers up at stairway from cellar , 1st story
Sep 2, 2026
Open — Nov certified on time - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 1st room from north located at apt 1r lower level, 1st story, 1st apartment from west at north
Sep 2, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from north located at apt 1r lower level, 1st story, 1st apartment from west at north
Sep 2, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in closet in the private hallway located at apt 1r lower level, 1st story, 1st apartment from west at north
Sep 2, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in closet in the private hallway located at apt 1r lower level, 1st story, 1st apartment from west at north
Sep 2, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections (room used for living and full bathroom created at cellar, including wash basin, water closet, and shower stall) at cellar, 1st story
Sep 2, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door at boiler room
Sep 2, 2026
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective lower base cabinet at sink in the kitchen located at apt 3r, 3rd story, 1st apartment from east at south
May 5, 2026 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east , west and south walls in the 1st room from east at south located at apt 3r, 3rd story, 1st apartment from east at south
May 5, 2026 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 3r, 3rd story, 1st apartment from east at south
May 5, 2026 · Apt 3R
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 3r, 3rd story, 1st apartment from east at south
May 5, 2026 · Apt 3R
Open — Civ14 mailed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at south wall in the kitchen located at apt 3r, 3rd story, 1st apartment from east at south
May 5, 2026 · Apt 3R
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 3r, 3rd story, 1st apartment from east at south
May 5, 2026 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east wall in the bathroom located at apt 3r, 3rd story, 1st apartment from east at south
May 5, 2026 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
May 3, 2026 · Apt 3R
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective hardwood floor in the 2nd room from north at east located at apt 3r, 3rd story, 1st apartment from west at north
May 3, 2026 · Apt 3R
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 5r, 5th story, 1st apartment from west at north
Apr 24, 2026 · Apt 5R
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 5r, 5th story, 1st apartment from west at north
Apr 24, 2026 · Apt 5R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south
Dec 15, 2025 · Apt 3
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Nov 27, 2025 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Nov 27, 2025 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Nov 27, 2025 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Nov 27, 2025 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wal in the 1st room from north located at apt 3r , 3rd story, 1st apartment from west at north
Sep 3, 2025 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3r , 3rd story, 1st apartment from west at north
Sep 3, 2025 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3r , 3rd story, 1st apartment from west at north
Sep 3, 2025 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3r , 3rd story, 1st apartment from west at north
Sep 3, 2025 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic sadle in the bathroom located at apt 3r , 3rd story, 1st apartment from west at north
Sep 3, 2025 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing metal tread 2nd up from bottom at 3rd story balcony fire escape at building front
Mar 17, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door
Mar 17, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door
Mar 5, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at entrance door to building , 1st story
Dec 12, 2024
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening key operated lock on bulkhead door leading to roof
Oct 9, 2024
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Oct 9, 2024
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 9, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Oct 9, 2024
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Oct 9, 2024
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Oct 9, 2024 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 9, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 9, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story
Oct 9, 2024
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Oct 9, 2024
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of razor wire on 2nd story rear roof blocking egress to adjacent buildings roof
Oct 9, 2024
Closed — Violation closed - ANon-hazardous
Paint or post a sign indicating floors ... at public hall
Oct 9, 2024
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories, all balconies and all componets at building front fire escape
Oct 9, 2024
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories, all balconies and all componets at building rear fire escape
Oct 9, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles at public hall, 2nd story
Oct 9, 2024
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at door at building entrance , 1st story
Feb 14, 2024
Open — Nov sent out
DOB building violations · 9
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 12, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 15, 2024
Dob violation - dismissed - Construction other optional
Unperm struct wrk in cellar remov/replac columns, wd joists& load-bear ing elemts. inadeq soe potent undrmning extng columns. remedy: retain nys pe,superv backfill & shore compr. wd frame in cellar, submt sktches to cse by 3/11,start wrk by 3/13/24
Mar 7, 2024
Dob violation - dismissed - Construction other optional
Observed in cellar, installation of 3 steel 6" columns under the sever ley rotted girder; not indicated in approved plans. structural stabilt y concerns with wood beams, floor joists along with improper welding w ork & improper welding work & improper footing work for columns
Mar 1, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 13, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 29, 2023
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
May 3, 1991
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
May 3, 1991
Dob violation - active
ECB violations · 13
- Class - 1
Occupancy contrary in cellar of apartment #1r, as per dob and hpd records cellar is legal recreation space with no living. observed space was converted into 1 bdr with a 3pc bath, no windows or 2nd means of egr
Sep 8, 2026 · Penalty $2,500
Active - Class - 2
Work w/o permit for plumbing installation, observed in cellar level of apartment #1r full 3pc bathroom was installed. as per permit # m00951564-s1-pl, approved plans state cellar level only supposed to have a h
Sep 8, 2026 · Penalty $1,250
Active - Class - 1
Atoi observed multiple step cracks, deteriorated mortor joint, spalling bricks at exposure#1(east 6 street), repair and/replace
Sep 1, 2026 · Penalty $2,500
Active - Class - 1
Unlawful acts: failure to comply with the commissioners order contained in summons/violation# 35678377r issued on 9/8/2023 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01., comply
Jul 23, 2024 · Penalty $625
Resolve - Class - 1
Unlawful acts: failure to comply with the commissioners order contained in summons/violation# 35678376p issued on 9/8/2023 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01., comply
Jul 23, 2024 · Penalty $625
Resolve - Class - 1
Work without a permit. noted: observed in the basement of the subject location, ongoing construction activity, work include removal of wastepipes and installation of new waste pipes, and also removal of concret
Mar 1, 2024 · Penalty $1,250
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendment. noted: at time of inspection in the cellar of the subject location work been done contrary to the dob approved plans. referenc
Mar 1, 2024 · Penalty $625
Resolve - Class - 1
At time of inspection observed excessive dust throughout 1st floor. tpp states site to be broom cleaned after each work day with water being used to control dust as needed. no cleaning of dust had been done sin
Jan 17, 2024 · Penalty $2,500
Resolve - Class - 2
Failure to distribute & post notice of tenant protection plan.note:at time of inspection obesrved work under aforementioned job number being performed observe no tpp was posted on 2nd,3rd,5th fl of building.spo
Sep 8, 2023 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code compliant manner.note:at time of inspection observed excessive storage of garbage on 5th fl of building blocking stairs leading to roof of building.it by code that all hallw
Sep 8, 2023 · Penalty $1,250
Resolve
Show 3 more ↓
- Class - 2
Failure to post or distribute safe construction bill of rights.note:at time of inspection observed work being performed under aforementioned job number.owner failed to post or distribute scb of r spoke to tenan
Sep 8, 2023 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code compliant manner.note:at time of inspection observed at subject location chimney leaning toward roof of building exp #4,observed cracks/vertical of chimney;immediate danger
Sep 8, 2023 · Penalty $1,250
Resolve - Class - 3
Failure to maintain. observed window a/c units on the 2nd and 5th floor are missing support brackets, repair and or replace
Mar 1, 2023 · Penalty $500
Resolve
Complaints
- Heat/hot water
Entire building
Oct 6, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Aug 31, 2026 · Apt 1R
Close - Paint/plaster
Wall
Aug 31, 2026 · Apt 1R
Close - Flooring/stairs
Floor
Aug 31, 2026 · Apt 1R
Close - Unsanitary condition
Mold
Aug 31, 2026 · Apt 1R
Close - Unsanitary condition
Mold
Aug 23, 2026 · Apt BASMEN
Close - Heat/hot water
Entire building
Jul 13, 2026 · Apt 3R
Close - Heat/hot water
Entire building
Jul 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 4, 2026 · Apt 3R
Close
Show 40 more ↓
- Heat/hot water
Entire building
Apr 30, 2026 · Apt 3R
Close - Heat/hot water
Entire building
Apr 30, 2026 · Apt 3R
Close - Heat/hot water
Entire building
Apr 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 27, 2026 · Apt 3R
Close - Heat/hot water
Entire building
Apr 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 26, 2025 · Apt BLDG
Close - General
Cooking gas
Jun 17, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Apr 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 5, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Apr 1, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Mar 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 26, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 10, 2025 · Apt BUILDI
Close - Heat/hot water
Entire building
Feb 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Dec 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 10, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 25, 2024 · Apt BLDG
Close - Plumbing
Water supply
Aug 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2024 · Apt BLDG
Close - Door/window
Door
Feb 13, 2024 · Apt 5F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1930
- Floors
- 5
- Residential units
- 8
- Building area
- 7,083 ft²
- Lot area
- 1,820 ft²
- Zoning
- R7A
- Community board
- 103
- Council district
- 2
- Block / lot
- 402 / 44
- Assessed value
- $1,511,550
- Landmark / historic district
- No
HPD registration #109207, last renewed Aug 24, 2025.
Questions about 543 East 6 Street
Who owns 543 East 6 Street?
The owner of record in NYC Department of City Planning PLUTO data is 543 East 6th Street Owner LLC.
Does 543 East 6 Street have violations?
Yes. NYC HPD has recorded 111 housing violations at this property.
Is 543 East 6 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 75% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 543 East 6 Street built?
City records list 1930 as the year it was built.
How many apartments are in 543 East 6 Street?
It has 8 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.