509 East 5 Street
Manhattan, NY 10009BBL 1-00401-0059Map
Owner of record: C.k.c. Associates
509 East 5 Street is a walk-up apartment building built in 1900 in Manhattan, 10009. It has 15 residential units across 5 floors. The owner of record is C.k.c. Associates. HPD has recorded 10 housing violations here, most recently on April 22, 2024. City tax records listed 7 rent-stabilized apartments here in 2024.
- HPD violations
- 10
- DOB violations
- 5
- ECB violations
- 4
- HPD complaints
- 90
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 10
- CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130f degrees at all hot water fixtures throughout in the entire apartment located at apt c, 1st story, 1st apartment from west at north
Apr 22, 2024 · Apt C
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening of a slide bolt capable of being locked installed at bulkhead door , 5th story
Feb 14, 2023
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees in the entire apartment located at apt c, 1st story, 1st apartment from west at north
Feb 12, 2023 · Apt C
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioning unit protuding more than 4 inches at window sill at 5th story balcony at south at fire escape
Mar 6, 2022
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioning unit at window sill protuding more than 4 inches at window sill at 4th story balcony at south at fire escape
Mar 6, 2022
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Oct 1, 2016
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 1, 2016
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Oct 1, 2016
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 2a, 3rd story, 1st apartment from east at south
Apr 26, 2016 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective located at apt 2a, 3rd story, 1st apartment from east at south
Apr 26, 2016 · Apt 2A
Closed — Violation dismissed
DOB building violations · 5
- Construction other optional
The borough commissioner has issued a stop work order for application #120602838 due to applicant withdrawal, stop all work immediately, mak e site safe, contact borough commissioner's office immediately
Mar 7, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 31, 1990
Vp*-violation unserved ecb- dismissed
ECB violations · 4
- Class - 2
Occupancy contrary to obtaining c of o. noted; at the cellar at rear an office has been built approx 20'x 10' and occupied with computers & desks. all contrary to c of o which calls for storage c of o 55157 d
Oct 14, 2010 · Penalty $1,200
Active - Class - 1
Work w.o a permit. noted: at the cellar an office space has been builtwith partitions, finished floor and electric, and at east part/foundation wall a thru door has been installed connecting the cellars of 509
Oct 14, 2010 · Penalty $800
Active - Class - 2
Failure to provide approved/accepted plans at job site at time of inspnoted construction work under permit #1048815149 expires 042209 throughout 1fl no approved plans on site at time of inspection remedy: provi
Aug 12, 2008
Resolve - Non-hazardous
Work without a permit. interior demolition relocation of interior partitions public hallway partitions and apartment entrance doorway relocated.
Oct 31, 1990
Resolve
Complaints
- Heat/hot water
Entire building
Apr 21, 2024 · Apt C
Close - Heat/hot water
Entire building
Apr 19, 2024 · Apt C
Close - Heat/hot water
Entire building
Apr 18, 2024 · Apt C
Close - Heat/hot water
Entire building
Mar 18, 2024 · Apt C
Close - Heat/hot water
Apartment only
Feb 16, 2023 · Apt C
Close - Heat/hot water
Entire building
Feb 13, 2023 · Apt CANDBU
Close - Heat/hot water
Entire building
Feb 12, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 11, 2023 · Apt C
Close - Heat/hot water
Entire building
Jan 2, 2023 · Apt C
Close - Heat/hot water
Entire building
Jan 1, 2023 · Apt C
Close
Show 40 more ↓
- Heat/hot water
Entire building
Nov 28, 2022 · Apt C
Close - Heat/hot water
Entire building
Nov 27, 2022 · Apt BUILDI
Close - Heat/hot water
Entire building
Oct 19, 2022 · Apt C
Close - Heat/hot water
Entire building
Apr 5, 2022 · Apt C
Close - Heat/hot water
Entire building
Mar 3, 2022 · Apt C
Close - Heat/hot water
Entire building
Mar 1, 2022 · Apt C
Close - Heat/hot water
Entire building
Jan 24, 2022 · Apt C
Close - Heat/hot water
Entire building
Nov 13, 2021 · Apt C
Close - Heat/hot water
Entire building
Nov 2, 2021 · Apt C
Close - Heat/hot water
Entire building
Dec 31, 2020 · Apt C
Close - Heat/hot water
Entire building
Jan 2, 2020 · Apt C
Close - Heat/hot water
Entire building
Dec 15, 2019 · Apt C
Close - Heat/hot water
Entire building
Dec 8, 2019 · Apt C
Close - Heat/hot water
Entire building
Nov 26, 2019 · Apt C
Close - Heat/hot water
Entire building
Nov 26, 2019 · Apt C
Close - Heat/hot water
Entire building
Nov 21, 2019 · Apt C
Close - Heat/hot water
Entire building
Nov 19, 2019 · Apt C
Close - Heat/hot water
Entire building
Nov 2, 2019 · Apt C
Close - Heat/hot water
Entire building
Oct 14, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 30, 2019 · Apt C
Close - Heat/hot water
Entire building
Mar 2, 2019 · Apt C
Close - Heat/hot water
Entire building
Feb 18, 2019 · Apt C
Close - Heat/hot water
Entire building
Feb 17, 2019 · Apt C
Close - Heat/hot water
Entire building
Feb 15, 2019 · Apt C
Close - Heat/hot water
Entire building
Jan 29, 2019 · Apt C
Close - Heat/hot water
Entire building
Jan 27, 2019 · Apt C
Close - Heat/hot water
Entire building
Jan 27, 2019 · Apt C
Close - Heat/hot water
Entire building
Dec 29, 2018 · Apt C
Close - Heat/hot water
Entire building
Apr 24, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 24, 2018 · Apt C
Close - Heat/hot water
Apartment only
Apr 21, 2018 · Apt C
Close - Heat/hot water
Apartment only
Apr 17, 2018 · Apt C
Close - Heat/hot water
Apartment only
Apr 10, 2018 · Apt C
Close - Heat/hot water
Apartment only
Mar 29, 2018 · Apt C
Close - Heat/hot water
Apartment only
Mar 27, 2018 · Apt C
Close - Heat/hot water
Entire building
Mar 26, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 26, 2018 · Apt C
Close - Heat/hot water
Entire building
Mar 24, 2018 · Apt 1A
Close - Heat/hot water
Entire building
Mar 14, 2018 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1900
- Floors
- 5
- Residential units
- 15
- Building area
- 6,545 ft²
- Lot area
- 2,425 ft²
- Zoning
- R7B
- Community board
- 103
- Council district
- 2
- Block / lot
- 401 / 59
- Assessed value
- $768,150
- Landmark / historic district
- No
HPD registration #115281, last renewed Aug 13, 2025.
Questions about 509 East 5 Street
Who owns 509 East 5 Street?
The owner of record in NYC Department of City Planning PLUTO data is C.k.c. Associates.
Does 509 East 5 Street have violations?
Yes. NYC HPD has recorded 10 housing violations at this property.
Is 509 East 5 Street rent stabilized?
NYC Department of Finance tax bills listed 7 rent-stabilized units here in 2024 (about 47% of its 15 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 509 East 5 Street built?
City records list 1900 as the year it was built.
How many apartments are in 509 East 5 Street?
It has 15 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.