520 East 5 Street
Manhattan, NY 10009BBL 1-00400-0016Map
Owner of record: Imh LLC
520 East 5 Street is a walk-up apartment building built in 1940 in Manhattan, 10009. It has 16 residential units across 5 floors. The owner of record is Imh LLC. HPD has recorded 16 housing violations here, most recently on December 21, 2023. 2 of the 16 most recent violations are still open. City tax records listed 13 rent-stabilized apartments here in 2024.
- HPD violations
- 16
- DOB violations
- 3
- ECB violations
- 2
- HPD complaints
- 252
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 16
- BHazardous
Refit the lower sash window at 2nd window from east at south. in the 3rd room from north located at apt 3b, 4th story, 1st apartment from north at east
Dec 21, 2023 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at lower sash window at 1st window from east at south. in the 3rd room from north located at apt 3b, 4th story, 1st apartment from north at east
Dec 21, 2023 · Apt 3B
Closed — Violation dismissed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at rear yard at fire escape
Sep 1, 2023
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet , in the bathroom located at apt a, 1st story, 2nd apartment from south at west
Jun 30, 2023 · Apt A
Open — Nov certified late - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt a, 1st story, 2nd apartment from south at west
Jun 30, 2023 · Apt A
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt a, 1st story, 2nd apartment from south at west
Jun 30, 2023 · Apt A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at west and south walls in the bathroom located at apt a, 1st story, 2nd apartment from south at west
Jun 30, 2023 · Apt A
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet , in the bathroom located at apt a, 1st story, 2nd apartment from south at west
Jun 30, 2023 · Apt A
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx. 5 sq ft at south wall in the bathroom located at apt b, 1st story, 1st apartment from north at east
Jun 30, 2023 · Apt B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt b, 1st story, 1st apartment from north at east
Jun 30, 2023 · Apt B
Closed — Violation dismissed
Show 6 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fire rated door leading to south rear yard at public hall, 1st story
Jun 30, 2023
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx. 5 sq ft at south wall in the bathroom located at apt b, 1st story, 1st apartment from north at east original violation 16068858 issued 30-jun-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jun 30, 2023 · Apt B
Open — First no access to re- inspect violation - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt a, 1st story, 1st apartment from south at west
Sep 6, 2020 · Apt A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the bathroom located at apt a, 1st story, 1st apartment from south at west
Sep 6, 2020 · Apt A
Closed — Violation dismissed
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations · 2
- Class - 2
Failure to comply w/the comm's order contained in summons/vio#32091539z issued on 09-06-17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01(d)(2). an acceptable certificate has not been filed despite the
Jun 8, 2018 · Penalty $625
Resolve - Class - 2
36-found hb smith boiler model 19hf06 938,000 btus unregistered and operating. register boiler and correct any violating conditions and submit a certificate of correction.
Sep 6, 2017 · Penalty $500
Resolve
Complaints
- Heat/hot water
Entire building
Dec 3, 2024 · Apt BLDG
Close - Plumbing
Bathtub/shower
Oct 30, 2023 · Apt 3B
Close - Door/window
Door
Oct 30, 2023 · Apt 3B
Close - Door/window
Window frame
Oct 30, 2023 · Apt 3B
Close - Door/window
Window pane
Oct 30, 2023 · Apt 3B
Close - Door/window
Window pane
Oct 1, 2023 · Apt 3B
Close - Door/window
Door
Oct 1, 2023 · Apt 3B
Close - Plumbing
Bathtub/shower
Oct 1, 2023 · Apt 3B
Close - Water leak
Slow leak
Aug 18, 2023 · Apt A
Close - Unsanitary condition
Mold
Jun 27, 2023 · Apt B
Close
Show 40 more ↓
- Plumbing
Toilet
Jun 23, 2023 · Apt A
Close - Water leak
Slow leak
Jun 23, 2023 · Apt A
Close - Heat/hot water
Apartment only
Nov 18, 2020 · Apt 1A
Close - Water leak
Slow leak
Aug 12, 2020 · Apt A
Close - Paint/plaster
Ceiling
Nov 20, 2017 · Apt A
Close - Heat/hot water
Entire building
Dec 22, 2014 · Apt D
Close - Heat/hot water
Entire building
Dec 8, 2014 · Apt 16
Close - Heating
Heat related
Sep 11, 2009 · Apt PVT
Close - Heating
Heat related
Oct 19, 2008 · Apt 3C
Close - Heating
Heat related
Feb 7, 2008 · Apt 1A
Close - Heating
Heat related
Feb 7, 2008 · Apt 3C
Close - Heating
Heat related
Nov 4, 2007 · Apt 3A
Close - Heating
Heat related
Nov 4, 2007 · Apt A
Close - Heating
Heat related
Nov 3, 2007 · Apt 1B
Close - Heating
Heat related
Nov 3, 2007 · Apt A
Close - Heating
Heat related
Nov 3, 2007 · Apt 3C
Close - Heating
Heat related
Oct 26, 2007 · Apt 3C
Close - Heating
Heat related
Oct 26, 2007 · Apt 3C
Close - Heating
Heat related
Jan 8, 2007 · Apt 3A
Close - Heating
Heat related
Jan 7, 2007 · Apt 3A
Close - Heating
Heat related
Jan 4, 2007 · Apt 3A
Close - Heating
Heat related
Jan 2, 2007 · Apt 3C
Close - Heating
Heat related
Dec 30, 2006 · Apt BLDG
Close - Heating
Heat related
Dec 29, 2006 · Apt 3A
Close - Heating
Heat related
Dec 29, 2006 · Apt 3A
Close - Heating
Heat related
Dec 29, 2006 · Apt 3C
Close - Nonconst
Janitor/super
Dec 29, 2006 · Apt 3C
Close - Heating
Heat related
Dec 28, 2006 · Apt 3C
Close - Paint/plaster
Wall
Dec 23, 2006 · Apt A
Close - Plumbing
Water-leaks
Dec 23, 2006 · Apt A
Close - General
Doors
Dec 10, 2006 · Apt 3B
Close - General
Doors
Dec 10, 2006 · Apt BLDG
Close - Heating
Heat related
Dec 7, 2006 · Apt 3A
Close - Heating
Heat related
Nov 19, 2006 · Apt 1A
Close - Heating
Heat related
Nov 19, 2006 · Apt 3C
Close - Heating
Heat related
May 15, 2006 · Apt BLDG
Close - Heating
Heat related
Dec 29, 2005 · Apt 3A
Close - Plumbing
Water supply
Sep 14, 2005 · Apt 3A
Close - Heating
Heat related
Sep 10, 2005 · Apt ANON
Close - Heating
Heat related
Sep 10, 2005 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1940
- Floors
- 5
- Residential units
- 16
- Building area
- 6,955 ft²
- Lot area
- 2,404 ft²
- Zoning
- R7B
- Community board
- 103
- Council district
- 2
- Block / lot
- 400 / 16
- Assessed value
- $864,000
- Landmark / historic district
- No
HPD registration #122860, last renewed Aug 5, 2025.
Questions about 520 East 5 Street
Who owns 520 East 5 Street?
The owner of record in NYC Department of City Planning PLUTO data is Imh LLC.
Does 520 East 5 Street have violations?
Yes. NYC HPD has recorded 16 housing violations at this property.
Is 520 East 5 Street rent stabilized?
NYC Department of Finance tax bills listed 13 rent-stabilized units here in 2024 (about 81% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 520 East 5 Street built?
City records list 1940 as the year it was built.
How many apartments are in 520 East 5 Street?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.