177 East 3 Street
Manhattan, NY 10009BBL 1-00399-0049Map
Owner of record: 175-177 East 3rd St Owner LLC
177 East 3 Street is a walk-up apartment building built in 1900 in Manhattan, 10009. It has 10 residential units across 5 floors. The owner of record is 175-177 East 3rd St Owner LLC. HPD has recorded 26 housing violations here, most recently on January 24, 2026. 19 of the 26 most recent violations are still open. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 26
- DOB violations
- 5
- ECB violations
- 1
- HPD complaints
- 41
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 26
- CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq. ft. at west wall, south wall, east wall and ceiling in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Jan 24, 2026 · Apt 4B
Open — Notice of issuance sent to tenant - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Jan 24, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall and south wall in the bathroom located at apt 4a, 4th story, 1st apartment from east at south
Jan 24, 2026 · Apt 4A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st wall cabinet from south at west wall, 1st wall cabinet from south at west wall in the kitchen located at apt 4a, 4th story, 1st apartment from east at south
Jan 24, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 4a, 4th story, 1st apartment from east at south
Jan 24, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 4a, 4th story, 1st apartment from east at south
Jan 24, 2026 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4a, 4th story, 1st apartment from east at south
Jan 24, 2026 · Apt 4A
Open — Notice of issuance sent to tenant - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 4b, 4th story, 1st apartment from west at north
Jan 24, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4b, 4th story, 1st apartment from west at north
Jan 24, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4b, 4th story, 1st apartment from west at north
Jan 24, 2026 · Apt 4B
Open — Nov sent out
Show 16 more ↓
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4b, 4th story, 1st apartment from west at north
Jan 24, 2026 · Apt 4B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash at 1st window pane from east at south wall in the 4th room from north located at apt 4b, 4th story, 1st apartment from west at north
Jan 24, 2026 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the private hallway located at apt 4a, 4th story, 1st apartment from east at south
Jan 24, 2026 · Apt 4A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Jan 24, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall in the 1st room from north located at apt 4b, 4th story, 1st apartment from west at north
Jan 24, 2026 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 4a, 4th story, 1st apartment from east at south
Jan 24, 2026 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the kitchen located at apt 4a, 4th story, 1st apartment from east at south
Jan 24, 2026 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the kitchen located at apt 4a, 4th story, 1st apartment from east at south
Jan 24, 2026 · Apt 4A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 4a, 4th story, 1st apartment from east at south
Jan 24, 2026 · Apt 4A
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye installed at building entrance door
Oct 9, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north located at apt 4b, 5th story, 1st apartment from east at south
Sep 1, 2020 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at wall at public hall, 1st story
Nov 5, 2018
Open — Invalid certification - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 5, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2016
Closed — Violation dismissed
DOB building violations · 5
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 1
- Non-hazardous
Altered building occupied without a valid certificate of occupancy. alt#100940305. noted: 1st floor apt. 1e and 1w altered under alt #100940305 from store to apartments, now being occupied as apartment without
Dec 1, 1997 · Penalty $350
Resolve
Complaints
- Plumbing
Basin/sink
Jan 16, 2026 · Apt 4B
Close - Safety
Fire escape
Jan 16, 2026 · Apt 4B
Close - Plumbing
Bathtub/shower
Jan 16, 2026 · Apt 4B
Close - Appliance
Refrigerator
Jan 16, 2026 · Apt 4B
Close - Plumbing
Toilet
Jan 16, 2026 · Apt 4B
Close - General
Bell/buzzer/intercom
Jan 12, 2026 · Apt 4A
Close - Appliance
Electric/gas range
Jan 12, 2026 · Apt 4A
Close - Electric
Outlet/switch
Jan 12, 2026 · Apt 4A
Close - General
Bell/buzzer/intercom
Jan 12, 2026 · Apt 4A
Close - Flooring/stairs
Floor
Jan 8, 2026 · Apt 4A
Close
Show 31 more ↓
- Plumbing
Toilet
Jan 8, 2026 · Apt 4A
Close - Paint/plaster
Wall
Jan 8, 2026 · Apt 4A
Close - Paint/plaster
Wall
Jan 8, 2026 · Apt 4A
Close - Paint/plaster
Ceiling
Jan 8, 2026 · Apt 4A
Close - Electric
Outlet/switch
Jan 8, 2026 · Apt 4A
Close - Paint/plaster
Ceiling
Jan 8, 2026 · Apt 4A
Close - Electric
Lighting
Jan 7, 2026 · Apt 4A
Close - Door/window
Door
Jan 7, 2026 · Apt 4A
Close - Heat/hot water
Entire building
Jan 5, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 12, 2025 · Apt 3B
Close - Plumbing
Bathtub/shower
Feb 27, 2025 · Apt 4A
Close - Flooring/stairs
Floor
Feb 27, 2025 · Apt 4A
Close - General
Bell/buzzer/intercom
Feb 27, 2025 · Apt 4A
Close - Flooring/stairs
Floor
Feb 27, 2025 · Apt 4A
Close - Safety
Window guard broken/missing
Feb 27, 2025 · Apt 4A
Close - Paint/plaster
Wall
Feb 27, 2025 · Apt 4A
Close - Unsanitary condition
Pests
Jan 7, 2025 · Apt 1W
Close - General
Bell/buzzer/intercom
Feb 7, 2024 · Apt 4B
Close - Plumbing
Water supply
Jan 30, 2024 · Apt APT2A
Close - Door/window
Door
Oct 28, 2023 · Apt 2A
Close - General
Bell/buzzer/intercom
Oct 28, 2023 · Apt 2A
Close - Heat/hot water
Entire building
Oct 8, 2023 · Apt BLDG
Close - Plumbing
Water supply
May 27, 2021 · Apt 4B
Close - Appliance
Electric/gas range
Aug 10, 2020 · Apt 4B
Close - Heat/hot water
Apartment only
Nov 6, 2018 · Apt 4B
Close - Heat/hot water
Apartment only
Nov 5, 2018 · Apt 4B
Close - Heat/hot water
Entire building
Feb 16, 2018 · Apt 3B
Close - Electric
Wiring
Jul 24, 2006 · Apt BLDG
Close - Nonconst
Rubbish
Jul 24, 2006 · Apt BLDG
Close - Electric
Lighting
Jul 24, 2006 · Apt BLDG
Close - Electric
Lighting
Jul 24, 2006 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1900
- Floors
- 5
- Residential units
- 10
- Building area
- 6,636 ft²
- Lot area
- 2,380 ft²
- Zoning
- R8B
- Community board
- 103
- Council district
- 2
- Block / lot
- 399 / 49
- Assessed value
- $2,555,100
- Landmark / historic district
- No
HPD registration #111667, last renewed Nov 3, 2025.
Questions about 177 East 3 Street
Who owns 177 East 3 Street?
The owner of record in NYC Department of City Planning PLUTO data is 175-177 East 3rd St Owner LLC.
Does 177 East 3 Street have violations?
Yes. NYC HPD has recorded 26 housing violations at this property.
Is 177 East 3 Street rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 20% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 177 East 3 Street built?
City records list 1900 as the year it was built.
How many apartments are in 177 East 3 Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.