617 East 9 Street
Manhattan, NY 10009BBL 1-00392-0053Map
Owner of record: NYC Housing Authority
617 East 9 Street is an elevator apartment building built in 2008 in Manhattan, 10009. It has 19 residential units across 6 floors. The owner of record is NYC Housing Authority. HPD has recorded 22 housing violations here, most recently on April 16, 2026. 8 of the 22 most recent violations are still open. City tax records listed 19 rent-stabilized apartments here in 2024.
- HPD violations
- 22
- DOB violations
- 11
- ECB violations
- 7
- HPD complaints
- 71
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 22
- BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 401, 4th story, 1st apartment from west at north
Apr 16, 2026 · Apt 401
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 401, 4th story, 1st apartment from west at north
Apr 16, 2026 · Apt 401
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 401, 4th story, 1st apartment from west at north
Apr 16, 2026 · Apt 401
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 401, 4th story, 1st apartment from west at north
Apr 16, 2026 · Apt 401
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Apr 16, 2026
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Apr 16, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective intercom system from building entrance to panel at south wall in the private hallway located at apt 401, 4th story, 1st apartment from west at north
Apr 16, 2026 · Apt 401
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 401, 4th story, 1st apartment from west at north
Apr 16, 2026 · Apt 401
Open — Defect letter issued - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Apr 16, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 302, 3rd story, 2nd apartment from east at south
Apr 3, 2025 · Apt 302
Closed — Violation closed
Show 12 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 302, 3rd story, 2nd apartment from east at south
Apr 3, 2025 · Apt 302
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 403, 4th story, 1st apartment from east at south
Mar 31, 2025 · Apt 403
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing door sweep installed at door in the entrance located at apt 403, 4th story, 1st apartment from east at south
Mar 31, 2025 · Apt 403
Open — Not complied with - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Sep 24, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Sep 24, 2024
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the foyer located at apt 301, 3rd story, 1st apartment from west at north
Jul 21, 2021 · Apt 301
Open — Not complied with - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchen located at apt 301, 3rd story, 1st apartment from west at north
Jul 21, 2021 · Apt 301
Open — Not complied with - BHazardous
Properly repair the broken or defective intercom on west wall in the entrance located at apt 401, 4th story, 2nd apartment from west at north
Sep 7, 2020 · Apt 401
Open — First no access to re- inspect violation - BHazardous
Properly repair the broken or defective return buzzer intercom system at front of building to ring at intercom panel in the entire apartment located at apt 401, 4th story, 1st apartment from west at north
Sep 3, 2020 · Apt 401
Open — Nov certified late - BHazardous
Abate the nuisance consisting of vermin ants located at apt 101, 1st story, 1st apartment from west at north
May 31, 2017 · Apt 101
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Aug 12, 2015
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening key operated interior lock installed at the door in the entrance located at apt 201, 2nd story, 1st apartment from west at north
Mar 21, 2013 · Apt 201
Closed — Violation dismissed
DOB building violations · 11
- Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2020
Dob violation - resolved - Construction other optional
Failure to maintain builsing walls at the rooftop observed exterior wa ll of adj building #605 e 9th street is in a state of dispair, step cr acks and vertical, horizontal cracks throughtout remedy: vacate the entire roof and balconies at 5th fl until fix defects
Mar 11, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 16, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 29, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 24, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2010
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed
Show 1 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Mar 24, 2010
Dob violation - resolved
ECB violations · 7
- Class - 2
/41i10/02l10/68m07/68b07/100m07/45p16/45t07/30d06/ 41i10-mr door unsecure, repair lock. 02l10-repair phone. 68m07-no mcp on site. 68b07-maintenance log not filled out. 100m07-no prints in mr. 45p16-no access to
Aug 10, 2015
Resolve - Class - 3
Failure to maintain building in a code compliant manner. defect noted:at time of inspection water damage is evident to ceiling in living room of apartment #601. rmdy: repair and/or replace.
Aug 18, 2013
Resolve - Class - 2
B254,50,50a: 50: gas pipe support bracket above boiler pulled out of ceiling. 50b: gas valve at boiler, bleed line not vented to outside
Apr 19, 2010
Resolve - Class - 2
Sidewalk shed does not meet code specifications noted: no vandal prooflight fixtures and illumination not present @ time of inspection. remedy: conform shed to code specifications.
Jul 3, 2008 · Penalty $2,400
Resolve - Hazardous
No permit from fire dept for welding or cutting operations during construcion noted: welding at the 5th flr in progress. no permit from fdny on site. stop all netting/welding operations. remedy: obtain post
Apr 4, 2008 · Penalty $5,000
Resolve - Hazardous
Failure to provide guard/hand rails. noted: bldg to 5th floor deck. welding at 5th floor and necessary at 4th in progress no handrails prov ided along stir case from 2nd floor to 5th east wing and guard rails
Apr 4, 2008 · Penalty $1,250
Resolve - Hazardous
No contractors sign.noted:at time of inspection site closed.excavationwork has been commercial.a contractors sign w/owner info,contractor info,311 & correct best squad # as per code is not posted on site.remedy
Nov 1, 2007 · Penalty $250
Resolve
Complaints
- General
Cabinet
Oct 2, 2026 · Apt 201
Close - General
Bell/buzzer/intercom
Aug 3, 2026 · Apt 401
Close - General
Bell/buzzer/intercom
Jul 15, 2026 · Apt 401
Close - Plumbing
Toilet
Oct 19, 2025 · Apt 401
Close - Plumbing
Basin/sink
Apr 30, 2025 · Apt 202
Close - Plumbing
Basin/sink
Apr 26, 2025 · Apt 304
Close - Heat/hot water
Entire building
Apr 1, 2025 · Apt 404
Close - Plumbing
Water supply
Apr 1, 2025 · Apt 203
Close - Heat/hot water
Apartment only
Apr 1, 2025 · Apt 203
Close - Heat/hot water
Apartment only
Mar 31, 2025 · Apt 302
Close
Show 40 more ↓
- Heat/hot water
Entire building
Mar 31, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 30, 2025 · Apt 403
Close - Door/window
Door
Feb 3, 2025 · Apt 302
Close - Water leak
Slow leak
Feb 3, 2025 · Apt 302
Close - Safety
Carbon monoxide detector
Sep 13, 2024 · Apt 303
Close - Plumbing
Toilet
Jul 23, 2024 · Apt 302
Close - General
Ventilation system
Jul 23, 2024 · Apt 302
Close - Plumbing
Bathtub/shower
Aug 3, 2023 · Apt 401
Close - Plumbing
Toilet
Aug 3, 2023 · Apt 401
Close - Heat/hot water
Apartment only
Mar 2, 2023 · Apt 201
Close - Heat/hot water
Apartment only
Feb 15, 2022 · Apt 302
Close - Water leak
Damp spot
Dec 31, 2021 · Apt 601
Close - Heat/hot water
Entire building
Nov 27, 2021 · Apt 404
Close - Heat/hot water
Entire building
Nov 27, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 27, 2021 · Apt 404
Close - Heat/hot water
Entire building
Nov 27, 2021 · Apt 404
Close - Door/window
Door
Jul 1, 2021 · Apt 301
Close - Water leak
Slow leak
Feb 7, 2021 · Apt 601APT
Close - Water leak
Slow leak
Feb 6, 2021 · Apt 601
Close - General
Bell/buzzer/intercom
Sep 11, 2020 · Apt 401
Close - Safety
Carbon monoxide detector
Aug 31, 2020 · Apt 401
Close - General
Bell/buzzer/intercom
Aug 31, 2020 · Apt 401
Close - Electric
No lighting
Jan 28, 2020 · Apt 201
Close - Unsanitary condition
Pests
Sep 11, 2018 · Apt 101
Close - Unsanitary condition
Pests
Sep 11, 2018 · Apt 101
Close - Unsanitary condition
Pests
Sep 7, 2018 · Apt 101
Close - Unsanitary condition
Pests
Sep 7, 2018 · Apt 101
Close - Unsanitary condition
Pests
Sep 5, 2018 · Apt 101
Close - Unsanitary condition
Pests
Sep 5, 2018 · Apt 101
Close - Unsanitary condition
Pests
May 22, 2017 · Apt 101
Close - Heating
Heat related
Jan 4, 2014 · Apt NA
Close - General
Mold
Dec 3, 2013 · Apt 601
Close - General
Mold
Dec 3, 2013 · Apt 601
Close - General
Mold
Nov 26, 2013 · Apt 601
Close - General
Mold
Nov 26, 2013 · Apt 601
Close - General
Doors
Mar 13, 2013 · Apt 201
Close - General
Doors
Mar 13, 2013 · Apt 201
Close - Heating
Heat related
Oct 31, 2012 · Apt 301
Close - General
Windows
Dec 18, 2010 · Apt 301
Close - Appliance
Electric/gas range
Dec 18, 2010 · Apt 301
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2008
- Floors
- 6
- Residential units
- 19
- Building area
- 20,200 ft²
- Lot area
- 4,600 ft²
- Zoning
- R8B
- Community board
- 103
- Council district
- 2
- Block / lot
- 392 / 53
- Assessed value
- $1,117,350
- Landmark / historic district
- No
HPD registration #143184, last renewed Aug 1, 2025.
Questions about 617 East 9 Street
Who owns 617 East 9 Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.
Does 617 East 9 Street have violations?
Yes. NYC HPD has recorded 22 housing violations at this property.
Is 617 East 9 Street rent stabilized?
NYC Department of Finance tax bills listed 19 rent-stabilized units here in 2024 (about 100% of its 19 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 617 East 9 Street built?
City records list 2008 as the year it was built.
How many apartments are in 617 East 9 Street?
It has 19 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.