129 Avenue C
Manhattan, NY 10009BBL 1-00391-0037Map
Owner of record: Avenue C Partner, LLC
129 Avenue C is a walk-up apartment building built in 1900 in Manhattan, 10009. It has 8 residential units across 5 floors. The owner of record is Avenue C Partner, LLC. HPD has recorded 322 housing violations here, most recently on October 21, 2026. 23 of the 50 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2024.
- HPD violations
- 322
- DOB violations
- 9
- ECB violations
- 20
- HPD complaints
- 1,044
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 322
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ...door and frame at vestibule , 1st story
Oct 21, 2026
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of ...pushbar without re-enter option install at fire door at bulkhead to the roof
Oct 21, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story
Aug 7, 2026
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 4a, 5th story, 1st apartment from north at east
Jun 28, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the by the entrance door at front areaway, 1st story
Jun 28, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 28, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 5th story, 1st apartment from north at east
Jun 28, 2026 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of the locked bulkhead fire door from the inside at public hall stairs, 5th story
Jun 28, 2026
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked hatch at front areaway of 131 avenue c at boiler room
Jun 28, 2026
Open — Not complied with - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north at east located at apt 4b, 5th story, 1st apartment from south at west
Jun 28, 2026 · Apt 4B
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 1st room from north at east located at apt 4b, 5th story, 1st apartment from south at west
Jun 28, 2026 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north at west located at apt 4b, 5th story, 1st apartment from south at west
Jun 28, 2026 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from north at west located at apt 4b, 5th story, 1st apartment from south at west
Jun 28, 2026 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the west wall in the kitchen located at apt 4b, 5th story, 1st apartment from south at west
Jun 28, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 4b, 5th story, 1st apartment from south at west
Jun 28, 2026 · Apt 4B
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration the electric range in the kitchen located at apt 4b, 5th story, 1st apartment from south at west
Jun 28, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 4b, 5th story, 1st apartment from south at west
Jun 28, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 5th story, 1st apartment from south at west
Jun 28, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 5th story, 1st apartment from south at west
Jun 28, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 4th story, 1st apartment from north at east
Jun 27, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system unknown location, no rear yard nor way to access bsmt from inside of the building 129 loisaida avenue no phone number to contact at the time of inspection at boiler room
Jun 27, 2026
Open — Not complied with - ANon-hazardous
Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided. at public hall, 1st story
Jun 27, 2026
Open — Nov certified on time - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 27, 2026
Open — Nov certified on time - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3a, 4th story, 1st apartment from north at east
Jun 27, 2026 · Apt 3A
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 15, 2026
Open — Nov certified on time - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east at north located at apt 4a, 5th story, 1st apartment from north at east
Apr 23, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from east at south located at apt 4a, 5th story, 1st apartment from north at east
Apr 23, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at wash basin sink in the bathroom located at apt 4a, 5th story, 1st apartment from north at east
Apr 23, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 4a, 5th story, 1st apartment from north at east
Apr 23, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 1b, 1st story, 1st apartment from south at west
Mar 21, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 4b, 5th story, 1st apartment from south at west
Mar 18, 2026 · Apt 4B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 4b, 5th story, 1st apartment from south at west
Mar 18, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 5th story, 1st apartment from south at west
Mar 18, 2026 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at north located at apt 1b, 2nd story, 1st apartment from south at west
Mar 4, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east at north located at apt 1b, 2nd story, 1st apartment from south at west
Mar 4, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 1b, 2nd story, 1st apartment from south at west original violation 18684712 issued 04-mar-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Mar 4, 2026 · Apt 1B
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west and south walls in the kitchen located at apt 1b, 2nd story, 1st apartment from south at west
Mar 4, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Refit upper window sash at west wall in the kitchen located at apt 1b, 2nd story, 1st apartment from south at west
Mar 4, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 1b, 2nd story, 1st apartment from south at west
Mar 4, 2026 · Apt 1B
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 1b, 2nd story, 1st apartment from south at west
Mar 4, 2026 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the private hallway located at apt 1b, 2nd story, 1st apartment from south at west
Mar 4, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature exceeding the maximum allowable temperature of 130f at all hot water fixtures. in the entire apartment located at apt 1b, 2nd story, 1st apartment from south at west
Mar 4, 2026 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the 2nd room from east located at apt 1b, 2nd story, 1st apartment from south at west
Mar 4, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door
Feb 28, 2026
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10sqft at ceiling and north wall in the bathroom located at apt 4b, 5th story, 1st apartment from south at west
Jan 7, 2026 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4b, 5th story, 1st apartment from south at west
Jan 7, 2026 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4b, 5th story, 1st apartment from south at west
Jan 7, 2026 · Apt 4B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in vestibule , 1st story
Nov 24, 2025
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Nov 24, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective the south wall in vestibule , 1st story
Nov 24, 2025
Closed — Violation dismissed
DOB building violations · 9
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 19, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 5, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 12, 2001
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 20
- Class - 2
At the time of inspection, observed 3 workers doing work on building facade. ( 2 workers in lift and 1 on ground next to lift with flag). sidewalk without flag person, barricade or proper direction for safe wal
Apr 22, 2024 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code compliant manner: at time of inspection of a 5 story building observed several cracks on party wall in apt # 4a kitchen & bedroom walls. also observed cracks on exterior bri
Mar 1, 2024 · Penalty $312
Resolve - Class - 2
At front of building, between 4th and 5th floor windows step crack appear, and masonry peeling., maintain exterior building wall
Dec 12, 2023 · Penalty $620
Resolve - Class - 2
At time of inspection observed crack lines on party wall in apt # 4a kitchen & bedroom wall. also observed step cracks on exterior brick facade 3rd to parapet level at expo # 01 ., repair and/or replace
Sep 25, 2021 · Penalty $500
Resolve - Class - 2
Failure to comply with commissioner's order to file a certificate of correction with dept of buildings for violating conditions cited in nov #35220343y.remedy:file a certificate of correction.
Jul 22, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to maintain sign for boiler access missing information as per hmc 27,2033, maintain boiler
Jan 3, 2020
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#35136913p issued on 01/15/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to file a c of c
Apr 15, 2017
Resolve - Class - 2
Change in occupancy/use of c of o as per 28-118.3.1. failure to comply w/ the commissioner's order contained in summons/violation# 35136913p28-118.3.2. for combining two establishments one @ 129 avenue c & 131
Mar 7, 2017
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. use of prohibited door &/or handware per bc 1008.1.8 & 27-371(j). noted: exit door at front of 1 fl louge having illegal hardware in low position. remedy: prov
Jan 20, 2017 · Penalty $800
Resolve - Class - 2
Work w/o permit. work noted: 1)install metal frame awning & heater above entrance. 2)create dj booth at keep of 1 floor restaurant. work 100% complete. remedy: stop all work. obtain permit.
Jan 20, 2017 · Penalty $800
Resolve
Show 10 more ↓
- Class - 1
Change in occupancy/use of c of o as per 28-118.3.1 - 28-118.3.2 by operating a place of assembly as per when current c of o does not allow such occupancy(between 129-131 ave c)noted: at time of inspection eati
Jan 15, 2017
Resolve - Class - 1
Electrical work w/o a permit. bsmt service equipment: 200amp service switch,9 meter bank plus the plp meter & panel. "please note" m048054 not covered the (new) service equipment above. remedy: obtain permit.
Oct 16, 2013 · Penalty $800
Resolve - Class - 1
Unapproved/unsafe/unsuitable electrical equipment,apparatus,materials,devices,appliances or wiring in use. the entire bsmt defective open wiring are in used defective fluorescent lighting fixtures 1 in used.
Oct 16, 2013 · Penalty $1,600
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. note at time of inspection following defect observed. (1) approx 1/4" wide cracks open ups (at) party walls (8'-0 long) on north site party wall at 4th fl leve
Nov 16, 2012 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg in a code-compliant manner.defects noted:at time of inspection cracks are observed in walls and ceilings of apartment #4a.front bedroom has a vertical crack through plaster from top of
Sep 28, 2012
Resolve - Class - 1
Failure to provide unobstructed exit passageway.defects noted: at timeof inspection fire escape at rear or bldg has platforms that are obstructed by flower pots,a garden hose,window screen,plant and other house
Sep 28, 2012 · Penalty $400
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection. note at time of inspection two(gentlemen) at site no plans work states has only cleaning don't know where plans are. rem:provide pl
Sep 13, 2012
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. defect noted:at exposure 1 by parapet level & lentel level. there are (spold)bricks & a crack that is from parapet to lentels level. rem:repair &/or replace
Sep 13, 2012 · Penalty $500
Resolve - Non-hazardous
Work without a permit,noted,1fl commercial space complete got demo with exposed ceiling joists.rem:stop all wrok,obtain and maintain all proper permit 2 plans with d.o.b.
Feb 12, 2001 · Penalty $2,500
Resolve - Non-hazardous
Work without permit.noted:1st floor commercial space, complete gut demo, with exposed ceiling joists.previous violation was written in errorremedy:stop all work, obtain & maintain all proper permits & plans wit
Feb 12, 2001
Resolve
Complaints
- Heat/hot water
Entire building
Oct 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Oct 14, 2026 · Apt 4A
Open - Unsanitary condition
Pests
Oct 11, 2026 · Apt 4B
Open - Unsanitary condition
Pests
Oct 11, 2026 · Apt 4B
Open - Heat/hot water
Entire building
Sep 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 19, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jul 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 7, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jul 6, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Jun 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 27, 2026 · Apt BLDG
Close - Flooring/stairs
Floor
Jun 24, 2026 · Apt 4B
Close - Unsanitary condition
Pests
Jun 24, 2026 · Apt 4B
Close - Paint/plaster
Ceiling
Jun 9, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Jun 9, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Jun 7, 2026 · Apt 3B
Close - Water leak
Slow leak
Jun 7, 2026 · Apt 3B
Close - Paint/plaster
Ceiling
Jun 7, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Jun 7, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Apr 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Paint/plaster
Ceiling
Apr 2, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Apr 2, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Apr 2, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Mar 31, 2026 · Apt 4B
Close - Unsanitary condition
Pests
Mar 31, 2026 · Apt 3B
Close - Door/window
Door
Mar 31, 2026 · Apt BLDG
Close - Safety
Fire escape
Mar 31, 2026 · Apt BLDG
Close - Outside building
Roof door/hatch
Mar 31, 2026 · Apt BLDG
Close - Door/window
Door
Mar 31, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Mar 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 25, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 25, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Mar 25, 2026 · Apt 3A
Close - Heat/hot water
Apartment only
Mar 23, 2026 · Apt 4A
Close - Heat/hot water
Entire building
Mar 19, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 19, 2026 · Apt 4A
Close - Heat/hot water
Entire building
Mar 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 18, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Mar 17, 2026 · Apt 4A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1900
- Floors
- 5
- Residential units
- 8
- Building area
- 6,000 ft²
- Lot area
- 1,580 ft²
- Zoning
- R7A
- Community board
- 103
- Council district
- 2
- Block / lot
- 391 / 37
- Assessed value
- $2,089,800
- Landmark / historic district
- No
HPD registration #103807, last renewed Oct 14, 2025.
Questions about 129 Avenue C
Who owns 129 Avenue C?
The owner of record in NYC Department of City Planning PLUTO data is Avenue C Partner, LLC.
Does 129 Avenue C have violations?
Yes. NYC HPD has recorded 322 housing violations at this property.
Is 129 Avenue C rent stabilized?
NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 13% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 129 Avenue C built?
City records list 1900 as the year it was built.
How many apartments are in 129 Avenue C?
It has 8 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.