630 East 9 Street
Manhattan, NY 10009BBL 1-00391-0022Map
Owner of record: 630 East 9th Street Realty LLC
630 East 9 Street is a walk-up apartment building built in 1910 in Manhattan, 10009. It has 22 residential units across 5 floors. The owner of record is 630 East 9th Street Realty LLC. HPD has recorded 97 housing violations here, most recently on July 15, 2026. 13 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 97
- DOB violations
- 24
- ECB violations
- 18
- HPD complaints
- 310
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 97
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story
Jul 15, 2026
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Jun 1, 2026
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing
Jun 1, 2026
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jun 1, 2026
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing
Jun 1, 2026
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing kick down door stopper at door leading to rear yard at basement
Apr 13, 2026
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing kick down door stopper at door leading to fire passageway at basement
Apr 13, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4, 1st story, 2nd apartment from north at east
Apr 12, 2026 · Apt 4
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4, 1st story, 2nd apartment from north at east
Apr 12, 2026 · Apt 4
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4, 1st story, 2nd apartment from north at east
Apr 12, 2026 · Apt 4
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 4, 1st story, 2nd apartment from north at east
Apr 12, 2026 · Apt 4
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 2nd room from north located at apt 8, 2nd story, 2nd apartment from north at east
Sep 6, 2025 · Apt 8
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at throughout kitchen of rats, in the entire apartment located at apt 8, 2nd story, 2nd apartment from north at east
Sep 6, 2025 · Apt 8
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 3rd room from north located at apt 8, 2nd story, 2nd apartment from north at east
Sep 6, 2025 · Apt 8
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing consisting of illegal kick-down doorstop at building front entrance door , 1st story
Sep 1, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective counter balance at upper window sash in the kitchen located at apt 8, 2nd story, 2nd apartment from north at east
Oct 11, 2023 · Apt 8
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 8, 2nd story, 2nd apartment from north at east
Oct 11, 2023 · Apt 8
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls. in the 1st room from north located at apt 8, 2nd story, 2nd apartment from north at east
Oct 11, 2023 · Apt 8
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling. in the 1st room from north located at apt 8, 2nd story, 2nd apartment from north at east
Oct 11, 2023 · Apt 8
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls. in the kitchen located at apt 8, 2nd story, 2nd apartment from north at east
Oct 11, 2023 · Apt 8
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 8, 2nd story, 2nd apartment from north at east
Oct 11, 2023 · Apt 8
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing. in the entire apartment located at apt 8, 2nd story, 2nd apartment from north at east
Oct 11, 2023 · Apt 8
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing. in the entire apartment located at apt 8, 2nd story, 2nd apartment from north at east
Oct 11, 2023 · Apt 8
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls. in the bathroom located at apt 8, 2nd story, 2nd apartment from north at east
Oct 11, 2023 · Apt 8
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls. in the 3rd room from north located at apt 8, 2nd story, 2nd apartment from north at east
Oct 11, 2023 · Apt 8
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at lower window sash in the 3rd room from north located at apt 8, 2nd story, 2nd apartment from north at east
Oct 11, 2023 · Apt 8
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing the kick stopper installed on building entrance door at public hall, 1st story
Oct 17, 2022
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing the kick stopper on vestibuel door at public hall, 1st story
Oct 17, 2022
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective intercom system at west wall in the foyer located at apt 8, 2nd story, 2nd apartment from north at east
Aug 5, 2021 · Apt 8
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 1st room from north located at apt 8, 2nd story, 2nd apartment from north at east
Aug 5, 2021 · Apt 8
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the kitchen located at apt 8, 2nd story, 2nd apartment from north at east
Aug 5, 2021 · Apt 8
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 3rd room from north located at apt 8, 2nd story, 2nd apartment from north at east
Aug 5, 2021 · Apt 8
Open — Nov sent out - BHazardous
Fire escape defective. replace with new the broken, defective and/or missing gossip plate(s) at front rail second story balcony building front at fire escape
Jun 5, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at east wall at public hall, 1st story
Jun 3, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall at public hall, 1st story
Jun 3, 2021
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Nov 30, 2016
Closed — Violation dismissed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts 5th story east 2 apt #20. (vacate order#126750.)
Nov 25, 2015
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 20, 5th story, 2nd apartment from north at east
Oct 30, 2015 · Apt 20
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the entire apartment located at apt 16, 4th story, 2nd apartment from north at east
Oct 30, 2015 · Apt 16
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 16, 4th story, 2nd apartment from north at east
Oct 30, 2015 · Apt 16
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 16, 4th story, 2nd apartment from north at east
Oct 30, 2015 · Apt 16
Closed — Violation dismissed - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Dec 24, 2012
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Dec 24, 2012
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front at front areaway
Dec 24, 2012
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items (bracket ,window guard...)at 3 & 4 sty balcony,front north at fire escape
Dec 24, 2012
Closed — Violation closed - CImmediately hazardous
Fire escape defective. properly secure 12th tread from bottom of 4th sty. north balcony at fire escape
Dec 6, 2012
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 17, 5th story, 2nd apartment from south at west
Sep 20, 2012 · Apt 17
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 9, 3rd story, 2nd apartment from south at west
Sep 17, 2012 · Apt 9
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 16, 4th story, 2nd apartment from north at east
Sep 13, 2012 · Apt 16
Open — Not complied with - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 16, 4th story, 2nd apartment from north at east
Sep 13, 2012 · Apt 16
Open — Not complied with
DOB building violations · 24
- Immediate emergency anythingoptional
Install approximately 90 linear feet of sidewalk shed at exposure #2 to protect the public and property
May 12, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Construction other optional
At front facade:bulge 1st-4th flrs: cracked, separating brownstone 2nd & 4th flrs, cracked 5th flr lintel. west courtyard: stress cracks inadequate fire rating cellar corridor which provides egress from fire escape at rear yard to street
Aug 19, 2010
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed
Show 14 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 18
- Class - 1
At the time of inspection it was observed that a section of bricks was missing above the 4th floor window on the eastside of the building. there was also numerous cracks and defects observed on the same eastsid
May 11, 2023 · Penalty $6,250
Resolve - Class - 2
Failure to comply w/the comm's order to file a c of c w/the dept of bldgs. defect noted: at time of inspection no c of c has been filed for ecb notice of violation #34862200p dated 8-19-10. remedy: file c of c
May 19, 2012 · Penalty $4,000
Resolve - Class - 2
I-card" illegal room w/bathrm created at basement at rear west section.remedy:discontinue illegal use or amend c of o.
Aug 30, 2011 · Penalty $6,000
Resolve - Class - 2
Failure to provide approved plans @ jobsite @ time of inspection.note:approved plans for supported scaffold over 40ft high on exp#1not available @ time of inspection upon request.rem:provide plans
Apr 14, 2011
Resolve - Class - 1
Unlawful act(s)failure to comply with an order of the commissioner.respondent failed to correct condition(s0 cited in prior nov#34828652r erecting full height partitions & installing plumbing & electric to crea
Sep 3, 2010 · Penalty $6,000
Resolve - Class - 1
Residence altered for occupancy as a dwelling for more than the legally approved # of families.noted:residence permitted to have 22 class a apts.2 in bsmnt & 4 on each flr (1-5).bsmnt now has 4 class a apt incr
Sep 3, 2010 · Penalty $1,200
Resolve - Class - 1
Failure to maintain bldg noted bulge @ front facade 1-4th flrs adjacent to 628 e 9th st cracks interior of 628 e 9th st cracked brownstone @ 2nd & 4th flrs of front facade separating & 5th flr lintel cracked
Aug 19, 2010 · Penalty $25,000
Resolve - Class - 1
Failure to comply w/an order of the commissioner. respondent failed tocorrect conditions in #34828652r. at basement erected 4 apts gas, electric & plumbing. apts are occupied at time of inspection. remedy:
May 15, 2010 · Penalty $12,000
Resolve - Class - 1
Work w/o a permit. noted: at basement having erected full height partitions creating 4 apts @ basement,gas,electric,plumbing work. work is 100% complete apts occupied 2 at time of inspection. remedy: obtain per
Dec 19, 2009 · Penalty $1,600
Resolve - Class - 3
Occupancy contrary to that allowed by the dept of building/building dept records. noted: having constructed 4 apts at basement arranged as studio apts. building dept records state basement only basement.
Dec 18, 2009 · Penalty $400
Resolve
Show 8 more ↓
- Class - 1
Failure to maintain bldg in code compliant manner noted at rear of bldg rear fire escape in disrepair drop ladder comes of track broken welds at stairs and platforms some bricks dislodged supporting fire escape
Mar 16, 2009 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg wall,noted at exposure #1 front exterior facade missing concrete from lintels at windows 2,3,5 floors wall at exposure #1 bulging & has crack between 4 & 5 floors at west side exposure
Jan 22, 2009 · Penalty $1,000
Resolve - Non-hazardous
Failure to maintain exterior wall. knoted: bricks loose and missing at rear wall parapet level south/ east corner. small cracks at rear wall st various locations. west wall needs repointing due to weathering at
Dec 9, 1999 · Penalty $350
Resolve - Hazardous
Failure to maintain. (hazardous). metal chimney at east side of bldg. is rotted, defective & comming apart at various elevations. remedy: make all necessary repairs immediately.
May 14, 1999 · Penalty $800
Resolve - Hazardous
Work without a permit noted:at rear of bldg. hole created at foundation wall wall 5'x5' for installing of window leaving rubble stone interior unsupported. tintel install at exterior resting on leaning bricks.
Jan 25, 1999 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain building exterior. noted at building rear (south elevation drop ladder of fire escape off guide rails perventing properand safe egress. repair all defects at once.
Jan 25, 1999 · Penalty $800
Resolve - Hazardous
Exit passage way corridor total obstruction. rear of building. drop ladder of fire escape not mounted to guides. re entry door to basementprevented by illegal sliding locks, no provide through fences for exit
Jan 25, 1999 · Penalty $480
Resolve - Non-hazardous
Work without a permit. noted: at rear of bldg basement level west side opening created approx 4'x5' in rubble stone and brick extesion wall for improperble installed and supported sliding windows. remedy; stop
Jul 10, 1998 · Penalty $800
Resolve
Complaints
- Unsanitary condition
Pests
Jul 7, 2026 · Apt B1
Close - Water leak
Slow leak
Sep 25, 2025 · Apt 4
Close - Electric
Lighting
Sep 25, 2025 · Apt 4
Close - Paint/plaster
Wall
Aug 27, 2025 · Apt 8
Close - Unsanitary condition
Pests
Aug 27, 2025 · Apt 8
Close - Unsanitary condition
Pests
Aug 20, 2025 · Apt BE
Close - Door/window
Window frame
Aug 13, 2025 · Apt 6
Close - Unsanitary condition
Pests
Aug 13, 2025 · Apt 6
Close - Unsanitary condition
Pests
Oct 4, 2023 · Apt 8
Close - Plumbing
Bathtub/shower
Oct 4, 2023 · Apt 8
Close
Show 40 more ↓
- Unsanitary condition
Pests
Oct 4, 2023 · Apt 8
Close - Electric
Lighting
Oct 4, 2023 · Apt 8
Close - Door/window
Window frame
Oct 4, 2023 · Apt 8
Close - Unsanitary condition
Pests
Jun 10, 2023 · Apt BE
Close - Unsanitary condition
Pests
Jun 10, 2023 · Apt BE
Close - Unsanitary condition
Pests
Apr 26, 2023 · Apt 13
Close - Unsanitary condition
Pests
Nov 29, 2022 · Apt BE
Close - Door/window
Door
Nov 29, 2022 · Apt BE
Close - Unsanitary condition
Garbage/recycling storage
Nov 17, 2022 · Apt BLDG
Close - Unsanitary condition
Pests
Oct 10, 2022 · Apt 8
Close - Unsanitary condition
Pests
Oct 10, 2022 · Apt 8
Close - Unsanitary condition
Pests
Oct 10, 2022 · Apt 8
Close - Door/window
Window frame
Oct 10, 2022 · Apt 8
Close - General
Bell/buzzer/intercom
Jun 14, 2021 · Apt 8
Close - Unsanitary condition
Pests
Jun 14, 2021 · Apt 8
Close - Paint/plaster
Ceiling
Jun 2, 2021 · Apt 4
Close - Door/window
Door
Jun 2, 2021 · Apt 4
Close - Unsanitary condition
Pests
Mar 1, 2021 · Apt 8
Close - Paint/plaster
Wall
Sep 17, 2018 · Apt 8
Close - Paint/plaster
Wall
Sep 17, 2018 · Apt 8
Close - Paint/plaster
Wall
Sep 17, 2018 · Apt 8
Close - Plumbing
Water supply
Sep 17, 2018 · Apt 8
Close - General
Cabinet
Sep 17, 2018 · Apt 8
Close - Heat/hot water
Entire building
Jan 7, 2018 · Apt BLDG
Close - Paint/plaster
Ceiling
Jan 5, 2015 · Apt 9
Close - Heating
Heat related
Mar 8, 2013 · Apt 17
Close - Heating
Heat related
Mar 8, 2013 · Apt 17
Close - Heating
Heat related
Mar 8, 2013 · Apt 17
Close - Heating
Heat related
Mar 8, 2013 · Apt 17
Close - Heating
Heat related
Mar 8, 2013 · Apt 17
Close - Heating
Heat related
Mar 8, 2013 · Apt 17
Close - Heating
Heat related
Mar 8, 2013 · Apt 17
Close - Heating
Heat related
Feb 23, 2013 · Apt 17
Close - Heating
Heat related
Jan 21, 2013 · Apt 1
Close - Heating
Heat related
Jan 4, 2013 · Apt 1
Close - General
Window guards
Dec 5, 2012 · Apt 9
Close - General
Window guards
Dec 5, 2012 · Apt 9
Close - General
Floor
Dec 4, 2012 · Apt 9
Close - General
Windows
Dec 4, 2012 · Apt 9
Close - Nonconst
Janitor/super
Dec 4, 2012 · Apt 9
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1910
- Floors
- 5
- Residential units
- 22
- Building area
- 10,185 ft²
- Lot area
- 2,583 ft²
- Zoning
- R8B
- Community board
- 103
- Council district
- 2
- Block / lot
- 391 / 22
- Assessed value
- $1,683,900
- Landmark / historic district
- No
HPD registration #110141, last renewed Sep 4, 2025.
Questions about 630 East 9 Street
Who owns 630 East 9 Street?
The owner of record in NYC Department of City Planning PLUTO data is 630 East 9th Street Realty LLC.
Does 630 East 9 Street have violations?
Yes. NYC HPD has recorded 97 housing violations at this property.
Is 630 East 9 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 27% of its 22 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 630 East 9 Street built?
City records list 1910 as the year it was built.
How many apartments are in 630 East 9 Street?
It has 22 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.