129 Avenue D
Manhattan, NY 10009BBL 1-00378-0031Map
Owner of record: 129 Ave D LLC
129 Avenue D is a walk-up apartment building built in 1910 in Manhattan, 10009. It has 12 residential units across 5 floors. The owner of record is 129 Ave D LLC. HPD has recorded 116 housing violations here, most recently on April 29, 2026. 9 of the 50 most recent violations are still open. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 116
- DOB violations
- 7
- ECB violations
- 7
- HPD complaints
- 272
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 116
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods drop ladder out of guide at fire escape building front
Aug 26, 2020
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective metal cornice parapet wall at roof at building front
Aug 26, 2020
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner unit installed at window 2nd story balcony at building front
Aug 26, 2020
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner unit installed at window 3rd story balcony at building front
Aug 26, 2020
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner unit installed at window 4th story balcony at building front
Aug 26, 2020
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner unit installed at window 5th story balcony at building front
Aug 26, 2020
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 5 story balcony, front east stack at fire escape
Aug 21, 2020
Open — Nov certified late - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 4 story balcony, front east stack at fire escape
Aug 21, 2020
Open — Nov certified late
Show 40 more ↓
- ANon-hazardous
Properly repair the broken or defective bell buzzer system in the kitchen located at apt 3c, 3rd story, 1st apartment from east at south
Mar 19, 2018 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective bell and return buzzer system from building entrance to foyer located at apt 3c, 3rd story, 1st apartment from south at west
Jan 8, 2018 · Apt 3C
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3b, 2nd story, 1st apartment from west at north
Mar 19, 2017 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 2nd room from east located at apt 3b, 2nd story, 1st apartment from west at north
Mar 19, 2017 · Apt 3B
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice located at apt 3b, 2nd story, 1st apartment from west at north
Mar 19, 2017 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Dec 20, 2016 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective window lower sash in the 1st room from north located at apt 3b, 2nd story, 1st apartment from west at north
Apr 3, 2016 · Apt 3B
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 9, 2016
Closed — Violation closed - BHazardous
Abate the nuisance consisting of excessive storage of material household items and books and paper throughout in the entire apartment located at apt 3b, 2nd story, 1st apartment from west at north
Mar 9, 2016 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective connection of waste pipe under the sink in the kitchen located at apt 3b, 2nd story, 1st apartment from west at north
Mar 9, 2016 · Apt 3B
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the kitchen located at apt 3b, 2nd story, 1st apartment from west at north
Mar 9, 2016 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective spring balance of the window ( bottom sash ) leading to the fire escape in the private hallway located at apt 3b, 2nd story, 1st apartment from west at north
Mar 9, 2016 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; at public hall, 2nd story
Jan 4, 2016
Closed — Violation closed - BHazardous
Replace with new the broken or defective sink in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west
Dec 20, 2015 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Dec 20, 2015 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Dec 20, 2015 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balances at lower sash at 2nd window from west at north wall in the 3rd room from east at north located at apt 2b, 2nd story, 1st apartment from south at west
Dec 20, 2015 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door to cellar locked at public hall, 1st story
Dec 20, 2015
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Dec 20, 2015 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective counter balance at the lower sash window in the 1st room from north at west located at apt 3b, 2nd story, 1st apartment from west at north
Feb 12, 2015 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective counter balance at the lower sash fire escape window in the kitchen located at apt 3b, 2nd story, 1st apartment from west at north
Feb 12, 2015 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east located at apt 3b, 3rd story, 1st apartment from west at north
Nov 14, 2014 · Apt 3B
Closed — Violation closed - BHazardous
Properly repair the broken or defective lower sash window in the 1st room from east located at apt 3b, 2nd story, 1st apartment from west at north
Sep 12, 2014 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles in the bathroom located at apt 3b, 2nd story, 1st apartment from west at north
Sep 12, 2014 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3b, 2nd story, 1st apartment from west at north
Sep 12, 2014 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 3b, 2nd story, 1st apartment from west at north
Sep 12, 2014 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balance lower sash window in the 2nd room from east located at apt 3b, 2nd story, 1st apartment from west at north
Sep 12, 2014 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroom located at apt 3b, 2nd story, 1st apartment from west at north
Sep 12, 2014 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 2nd room from east located at apt 3b, 2nd story, 1st apartment from west at north
Sep 12, 2014 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective lockset at entrance door in the foyer located at apt 3b, 2nd story, 1st apartment from west at north
Sep 12, 2014 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). that is missing in the entire apartment located at apt 3b, 2nd story, 1st apartment from west at north
Sep 12, 2014 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector that is missing in the entire apartment located at apt 3b, 2nd story, 1st apartment from west at north
Sep 12, 2014 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at south and west wall in the bathroom located at apt 3b, 2nd story, 1st apartment from west at north
Sep 7, 2014 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3b, 2nd story, 1st apartment from west at north
Sep 7, 2014 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3b, 2nd story, 1st apartment from west at north
Sep 7, 2014 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective wood floor in the kitchen located at apt 3b, 2nd story, 1st apartment from west at north
Sep 7, 2014 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at west located at apt 3b, 2nd story, 1st apartment from west at north
Sep 7, 2014 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3b, 2nd story, 1st apartment from west at north
Sep 7, 2014 · Apt 3B
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective fire proof door in the entrance located at apt 3b, 2nd story, 1st apartment from west at north
Sep 7, 2014 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3b, 2nd story, 1st apartment from west at north
Sep 2, 2014 · Apt 3B
Closed — Violation dismissed
DOB building violations · 7
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 18, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 20, 2021
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Construction other optional
Work w/out permit
May 24, 2009
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
May 24, 2009
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed
ECB violations · 7
- Class - 1
Failure to maintain building in code compliant manner.observed in basement 2 future gas connections.it has a plug on the run side of the tee and #2 has a plub on a reducing gas fitting.also gas pipe in boiler r
May 27, 2021 · Penalty $1,250
Active - Class - 1
Failure to maintain building in code-complaint manner i observed in basement lack support on gas pipe. no gas stickers on gas pipe. corrosion on gas pipe used jim cap on waste line. on first floor in deli marke
Oct 29, 2020 · Penalty $1,280
Active - Class - 2
Observed disrepair metal cornice in roof level at expo # 01 & 02. decorative 5-dental in cornice damaged and open. also observed spalling bend stone in 3rd floor level at expo # 01 and disrepair metal flashing
May 8, 2019 · Penalty $625
Active - Class - 1
Work w/o a permit. note in 2nd flr apt full height partition walls illegally erected and removed at various locations by closing up existing& removed @ various locations by closing up existing interior doorways
May 18, 2013
Resolve - Class - 1
Failure to comply w/an order of the comm's respondant failed to correct condition in # 34755231y ground fl store renovation fl at front of store all plumbing fixtures taken apart remedy:comply w/code obtain pe
Sep 19, 2009
Resolve - Class - 1
Work w/o a permit. noted: ground flr store under renovation. new wood flooring at front of store, all plumbing fixtures taken apart, new sheetrock work at exterior walls. stop all work. remedy: obtain permit or
May 24, 2009 · Penalty $1,600
Resolve - Non-hazardous
Work does not conform to plan. noted: isntallation of telecom. antennas and cable run on roof does not conform to plan (regarding position/location). approved plan # 102594943 dt. 6/15/01 (g-2) remedy: conform
Mar 11, 2003 · Penalty $250
Resolve
Complaints
- Unsanitary condition
Pests
Feb 11, 2026 · Apt 3D
Close - Water leak
Heavy flow
Feb 28, 2024 · Apt C1
Close - Paint/plaster
Ceiling
Feb 28, 2024 · Apt C1
Close - Unsanitary condition
Pests
Dec 13, 2023 · Apt 1C
Close - Plumbing
Radiator
Dec 13, 2023 · Apt 1C
Close - Unsanitary condition
Pests
Nov 27, 2023 · Apt C1
Close - Heat/hot water
Entire building
Mar 24, 2023 · Apt 3D
Close - General
Ventilation system
Jun 1, 2021 · Apt 3C
Close - Heat/hot water
Apartment only
Feb 13, 2021 · Apt 3C
Close - General
Ventilation system
Jun 13, 2020 · Apt 3C
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Dec 22, 2019 · Apt 3C
Close - General
Bell/buzzer/intercom
Apr 4, 2018 · Apt 3C
Close - General
Bell/buzzer/intercom
Mar 8, 2018 · Apt 3C
Close - Heat/hot water
Entire building
Jan 5, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 5, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 5, 2018 · Apt 3B
Close - Heat/hot water
Entire building
Jan 5, 2018 · Apt 3B
Close - Heat/hot water
Apartment only
Jan 5, 2018 · Apt 3C
Close - Heat/hot water
Entire building
Jan 5, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 2, 2018 · Apt 1
Close - Heat/hot water
Apartment only
Jan 2, 2018 · Apt 3C
Close - Heat/hot water
Apartment only
Jan 2, 2018 · Apt 2B
Close - Heat/hot water
Entire building
Jan 1, 2018 · Apt 2B
Close - Heat/hot water
Entire building
Jan 1, 2018 · Apt 3C
Close - Heat/hot water
Apartment only
Jan 1, 2018 · Apt 3C
Close - Heat/hot water
Apartment only
Dec 28, 2017 · Apt 3C
Close - General
Bell/buzzer/intercom
Dec 26, 2017 · Apt 3C
Close - Heat/hot water
Entire building
Nov 1, 2017 · Apt 2B
Close - Heat/hot water
Entire building
Mar 5, 2017 · Apt 2B
Close - Heat/hot water
Entire building
Mar 5, 2017 · Apt 3B
Close - Door/window
Window frame
Jan 20, 2017 · Apt 3B
Close - Unsanitary condition
Pests
Jan 20, 2017 · Apt 3B
Close - Unsanitary condition
Mold
Jan 20, 2017 · Apt 3B
Close - Safety
Fire escape
Jan 7, 2017 · Apt 3B
Close - Unsanitary condition
Pests
Jan 7, 2017 · Apt 3B
Close - Unsanitary condition
Mold
Jan 7, 2017 · Apt 3B
Close - Heat/hot water
Entire building
Jan 1, 2017 · Apt 2C
Close - Heat/hot water
Apartment only
Dec 20, 2016 · Apt 3C
Close - Heat/hot water
Entire building
Dec 17, 2016 · Apt 2B
Close - Heat/hot water
Entire building
Oct 20, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 20, 2016 · Apt BLDG
Close - General
Bell/buzzer/intercom
Mar 11, 2016 · Apt 3B
Close - Unsanitary condition
Mold
Mar 11, 2016 · Apt 3B
Close - General
Bell/buzzer/intercom
Mar 11, 2016 · Apt 3B
Close - Unsanitary condition
Mold
Mar 11, 2016 · Apt 3B
Close - Flooring/stairs
Floor
Feb 24, 2016 · Apt 3B
Close - Flooring/stairs
Floor
Feb 24, 2016 · Apt 3B
Close - Unsanitary condition
Pests
Feb 24, 2016 · Apt 3B
Close - Safety
Fire escape
Feb 24, 2016 · Apt 3B
Close - Flooring/stairs
Floor
Feb 16, 2016 · Apt 3B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1910
- Floors
- 5
- Residential units
- 12
- Building area
- 10,420 ft²
- Lot area
- 2,178 ft²
- Zoning
- R8A
- Community board
- 103
- Council district
- 2
- Block / lot
- 378 / 31
- Assessed value
- $1,076,400
- Landmark / historic district
- No
HPD registration #107006, last renewed Nov 1, 2025.
Questions about 129 Avenue D
Who owns 129 Avenue D?
The owner of record in NYC Department of City Planning PLUTO data is 129 Ave D LLC.
Does 129 Avenue D have violations?
Yes. NYC HPD has recorded 116 housing violations at this property.
Is 129 Avenue D rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 17% of its 12 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 129 Avenue D built?
City records list 1910 as the year it was built.
How many apartments are in 129 Avenue D?
It has 12 residential units and 14 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.