734 East 5 Street
Manhattan, NY 10009BBL 1-00374-0025Map
Owner of record: Isla Nena Housing Development Fund
734 East 5 Street is an elevator apartment building built in 2004 in Manhattan, 10009. It has 48 residential units across 7 floors. The owner of record is Isla Nena Housing Development Fund. HPD has recorded 88 housing violations here, most recently on June 29, 2026. 9 of the 50 most recent violations are still open. City tax records listed 48 rent-stabilized apartments here in 2024.
- HPD violations
- 88
- DOB violations
- 33
- ECB violations
- 13
- HPD complaints
- 178
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 88
- BHazardous
Abate the nuisance consisting of excessive storage of material throughout in the entire apartment located at apt 6f, 6th story, 3rd apartment from east at south
Jun 29, 2026 · Apt 6F
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective located at apt 6a, 6th story, 5th apartment from west at north
Jun 29, 2026 · Apt 6A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective located at apt 6a, 6th story, 5th apartment from west at north
Jun 29, 2026 · Apt 6A
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2f, 2nd story, 2nd apartment from east at south
Jan 29, 2026 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2f, 2nd story, 2nd apartment from east at south
Jan 29, 2026 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement at boiler room
Jan 29, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material ceiling and north wall at public hall, 6th story
Jan 28, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and north wall at public hall, 6th story
Jan 28, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6f, 6th story, 3rd apartment from south at west
Nov 27, 2024 · Apt 6F
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 4th apartment from west at north
Nov 21, 2024 · Apt 1A
Open — Invalid certification - CImmediately hazardous
Provide ready access to buildings heating system locked door leading to boiler room at boiler room
Nov 21, 2024
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective light fixture at ceiling at public hall, 1st story
Aug 23, 2024
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective light fixture at ceiling in the kitchenette located at apt 6f, 6th story, 3rd apartment from east at south
Aug 23, 2024 · Apt 6F
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2h, 2nd story, 1st apartment from east at south
Nov 29, 2023 · Apt 2H
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th story
Sep 26, 2023
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th story
Sep 26, 2023
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling and south wall at public hall, 7th story
Sep 8, 2023
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 6th story
Sep 8, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th story
Sep 8, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardent material at ceiling at public hall, 6th story
Sep 8, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and south wall at public hall, 7th story
Sep 8, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardent material at ceiling and south wall at public hall, 7th story
Sep 8, 2023
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak the ceiling in the 3rd room from east located at apt 3c, 3rd story
May 16, 2023 · Apt 3C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east located at apt 3c, 3rd story
May 16, 2023 · Apt 3C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 2nd room from east located at apt 3c, 3rd story
May 16, 2023 · Apt 3C
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak the ceiling in the 2nd room from east located at apt 3c, 3rd story
May 16, 2023 · Apt 3C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 3c, 3rd story
May 16, 2023 · Apt 3C
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak the ceiling in the 1st room from east located at apt 3c, 3rd story
May 16, 2023 · Apt 3C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling in the 1st room from east located at apt 6a, 6th story
Oct 26, 2022 · Apt 6A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 6a, 6th story
Oct 26, 2022 · Apt 6A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd room from east located at apt 6a, 6th story
Oct 26, 2022 · Apt 6A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 3c, 3rd story
Oct 26, 2022 · Apt 3C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 3c, 3rd story
Oct 26, 2022 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 1st room from east located at apt 6c, 6th story, 2nd apartment from west at north
Oct 4, 2022 · Apt 6C
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east located at apt 6c, 6th story, 2nd apartment from west at north
Oct 4, 2022 · Apt 6C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall. in the 2nd room from east located at apt 6c, 6th story, 2nd apartment from west at north
Oct 4, 2022 · Apt 6C
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 3rd room from east located at apt 6c, 6th story, 2nd apartment from west at north
Oct 4, 2022 · Apt 6C
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 3rd room from east located at apt 6c, 6th story, 2nd apartment from west at north
Oct 4, 2022 · Apt 6C
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 9, 2022
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 6b, 6th story, 3rd apartment from west at north
Aug 25, 2021 · Apt 6B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from east located at apt 6b, 6th story, 3rd apartment from west at north
Aug 25, 2021 · Apt 6B
Open — Nov sent out - CImmediately hazardous
Code: arrange and make self-closing the doors ... in the entrance located at apt 6b, 6th story, 3rd apartment from west at north
Aug 25, 2021 · Apt 6B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6b, 6th story, 3rd apartment from west at north
Aug 25, 2021 · Apt 6B
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the 2nd room from east located at apt 6b, 6th story, 3rd apartment from west at north
Aug 25, 2021 · Apt 6B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 6b, 6th story, 3rd apartment from west at north
Aug 25, 2021 · Apt 6B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 6b, 6th story, 3rd apartment from west at north
Aug 25, 2021 · Apt 6B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the 3rd room from east located at apt 6b, 6th story, 3rd apartment from west at north
Aug 25, 2021 · Apt 6B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall in the 2nd room from east located at apt 3c, 3rd story, 2nd apartment from west at north
Jul 7, 2021 · Apt 3C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department north wall in the 3rd room from east at north located at apt 3c, 3rd story, apartment at north
Mar 19, 2021 · Apt 3C
Closed — Violation closed
DOB building violations · 33
- Construction other optional
Failure to maintain building in code compliant manner.as noted at the time of inspection,i observed on exp2 east elev:cracks in bricks and s pallinf mortar joints on the northeast and southeastern corners of par apet.exp3 south elev:damaged mortar joints at the southwestern end of parapet.remedy:repair and/or replace damaged facade in defective areas
Jan 23, 2026
Dob violation - active - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Feb 21, 2024
Dob violation - active - Construction other optional
Failure to maintain building in code compliant manner:observed bulging spalling,damaged joints and cracks at window lintels stones.remedy: maintain building replace and or replace
Aug 23, 2023
Dob violation - active - Construction other optional
Failure to maintain building in a code compliant manner.observed deteriorated mortar joints and hairline cracks in stone lintels on exposures#1 and #3 remedy:maintain building exterior facade.provide approved safety measures.make necessary repairs to facade
May 2, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2020
Dob violation - dismissed
Show 23 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Feb 21, 2017
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 24, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 7, 2013
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - active - Elevator elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspectio
Oct 1, 2012
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 20, 2012
Dob violation - resolved - Elevator elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspectio
Dec 13, 2011
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - active - Elevator elevatorrequired
Violation issued to elevator-failure to file category 1 2009 inspectio
Oct 8, 2010
Dob violation - active - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 6, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 30, 2006
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed
ECB violations · 13
- Class - 2
Class 2 item: access to elevator machine room was not provided at time of inspection, preventing inspection and access to elevator equipment, in violation of asme a17.1-2013 2.7.3 and 8.6.1.2.1, and nyc adminis
Jul 17, 2026
Resolve - Class - 1
97/l/17 class 1 , restore to service for proper inspection by dob.
Jun 26, 2026 · Penalty $1,250
Resolve - Class - 1
5/l/10 class 1,car cease use, class 1, car door restrictor defective repair.
Apr 9, 2026 · Penalty $1,250
Active - Class - 2
Time of inspection observed an erected sidewalk shed at the buildings exposure 1, upon review of departmental records to check for compliance, which revealed the permit for the temporary construction equipment
Apr 3, 2023 · Penalty $1,280
Resolve - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #913160.remedy:submit acceptable required te
Dec 9, 2022 · Penalty $3,125
Resolve - Class - 2
Failure to file acceptable amended cycle8a report indicating correction of unsafe conditions described in initial facades report required by28-302.5 for control#813160.file acceptable report
Oct 8, 2021 · Penalty $1,250
Resolve - Class - 2
At time of inspection, observed auto vehicle parked with no registration/license plates on vacant lot, contrary to department of building records. records indicate, building demolish under permit #dp-21579, oat
May 5, 2021
Resolve - Class - 1
No door lock monitor installed in controller as mandated in 3.10.12 of appendix k of the 2014 buuilding code. remedy: install dlm, file and perform test with nyc dob
Aug 7, 2020 · Penalty $1,280
Resolve - Class - 2
At time of insp in response to complaint #1505024 observed sidewalk shed in place w/uncapped & protruding bolts,sharp edges creating a hazardous condition for pedestrians walking under the shed.rem:comply w/cod
Mar 25, 2019 · Penalty $2,400
Resolve - Class - 3
Vio of parking regulations in residential zone noted:commercial van lic plate #31096 mb & other vehicles parked on vacant land contrary to zonning.rem:conform to zoning.
Mar 27, 2018
Resolve
Show 3 more ↓
- Class - 2
39p7,40p7,70p7,2l10,23i7,23m7. (39,40,70p)no access to car top,machine room & pit. (2l)phone in elevator cab does not work. (23i)hall station @ 6th flr is damaged, needs to be fixed. (23m)hall station @ top lan
Dec 26, 2017
Resolve - Class - 2
Failure to provide sidewalk shed parapet sign.note:at time of inspection sidewalk shed at exp#1 missing parapet sign.it must contain,the address of the shed the name of contractor responsible for the sidewalk s
Jun 14, 2017
Resolve - Class - 1
Failure to take provide safety measures such as sidewalk sheds,fence,etc,where require to protect & secure public safety from documented unsafe facade as per 1rcny 103-04. facade technicak report file"unsafe"by
Apr 6, 2017 · Penalty $2,400
Resolve
Complaints
- Door/window
Door
Aug 20, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 19, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 3, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 3, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Mar 7, 2026 · Apt 1G
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 5, 2025 · Apt 1H
Close - Heat/hot water
Apartment only
Oct 27, 2025 · Apt 1H
Close - Plumbing
Water supply
Aug 26, 2025 · Apt 2H
Close
Show 40 more ↓
- Door/window
Door
Aug 6, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 4, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 3, 2025 · Apt 6A
Close - Heat/hot water
Entire building
Mar 2, 2025 · Apt BLDG
Close - Paint/plaster
Wall
Feb 19, 2025 · Apt 3C
Close - Heat/hot water
Apartment only
Feb 16, 2025 · Apt 6H
Close - Heat/hot water
Apartment only
Feb 12, 2025 · Apt 6H
Close - Unsanitary condition
Garbage/recycling storage
Feb 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 10, 2024 · Apt 6C
Close - Heat/hot water
Apartment only
Dec 9, 2024 · Apt 6G
Close - Heat/hot water
Apartment only
Dec 9, 2024 · Apt 3C
Close - Heat/hot water
Apartment only
Dec 9, 2024 · Apt 6H
Close - Unsanitary condition
Mold
Dec 8, 2024 · Apt 6A
Close - Heat/hot water
Apartment only
Dec 8, 2024 · Apt 6A
Close - Heat/hot water
Apartment only
Dec 8, 2024 · Apt 6A
Close - Paint/plaster
Door/frame
Dec 8, 2024 · Apt 6A
Close - Plumbing
Water supply
Dec 8, 2024 · Apt 6A
Close - Heat/hot water
Entire building
Dec 8, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 7, 2024 · Apt 3C
Close - Heat/hot water
Apartment only
Dec 7, 2024 · Apt 6A
Close - Heat/hot water
Apartment only
Dec 6, 2024 · Apt 6H
Close - Heat/hot water
Entire building
Nov 25, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 25, 2024 · Apt 2E
Close - Heat/hot water
Entire building
Nov 18, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 14, 2024 · Apt 3C
Close - Heat/hot water
Apartment only
Nov 10, 2024 · Apt 6H
Close - Heat/hot water
Entire building
Apr 19, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2024 · Apt BLDG
Close - Door/window
Door
Jan 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 3, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 25, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Plumbing
Basin/sink
Nov 13, 2023 · Apt 2H
Close - Electric
Lighting
Nov 13, 2023 · Apt 2H
Close - Plumbing
Basin/sink
Nov 13, 2023 · Apt 2H
Close - Heat/hot water
Entire building
Oct 22, 2023 · Apt 3F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2004
- Floors
- 7
- Residential units
- 48
- Building area
- 49,792 ft²
- Lot area
- 12,694 ft²
- Zoning
- R8B
- Community board
- 103
- Council district
- 2
- Block / lot
- 374 / 25
- Assessed value
- $1,128,150
- Landmark / historic district
- No
HPD registration #142658, last renewed Aug 27, 2025.
Questions about 734 East 5 Street
Who owns 734 East 5 Street?
The owner of record in NYC Department of City Planning PLUTO data is Isla Nena Housing Development Fund.
Does 734 East 5 Street have violations?
Yes. NYC HPD has recorded 88 housing violations at this property.
Is 734 East 5 Street rent stabilized?
NYC Department of Finance tax bills listed 48 rent-stabilized units here in 2024 (about 100% of its 48 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 734 East 5 Street built?
City records list 2004 as the year it was built.
How many apartments are in 734 East 5 Street?
It has 48 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.