188 Norfolk Street
Manhattan, NY 10002BBL 1-00355-0048Map
Owner of record: 186 Norfolk LLC C/O G
188 Norfolk Street is a walk-up apartment building built in 1900 in Manhattan, 10002. It has 13 residential units across 6 floors. The owner of record is 186 Norfolk LLC C/O G. HPD has recorded 14 housing violations here, most recently on March 15, 2023. City tax records listed 7 rent-stabilized apartments here in 2024.
- HPD violations
- 14
- DOB violations
- 10
- ECB violations
- 6
- HPD complaints
- 60
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 16, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective bell /buzzer/return/ intercom from building entrance to the apartment in the entrance located at apt 4h, 4th story, 1st apartment from north at east
Mar 20, 2021 · Apt 4H
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 4h, 4th story, 1st apartment from north at east
Mar 20, 2021 · Apt 4H
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor at radiator in the 3rd room from east located at apt 4h, 4th story, 1st apartment from north at east
Mar 20, 2021 · Apt 4H
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor at radiator in the 2nd room from east located at apt 4h, 4th story, 1st apartment from north at east
Mar 20, 2021 · Apt 4H
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor at west in the 1st room from east located at apt 4h, 4th story, 1st apartment from north at east
Mar 20, 2021 · Apt 4H
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor at north in the 1st room from east located at apt 4h, 4th story, 1st apartment from north at east
Mar 20, 2021 · Apt 4H
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall behind range and rear of base cabinet in the kitchen located at apt 4h, 4th story, 1st apartment from north at east
Mar 20, 2021 · Apt 4H
Closed — Violation dismissed
Show 4 more ↓
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4h, 4th story, 1st apartment from north at east
Mar 20, 2021 · Apt 4H
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4h, 4th story, 1st apartment from south at west
Mar 4, 2021 · Apt 4H
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective window sashes counter balance in the 1st room from north located at apt 4h, 4th story, 1st apartment from south at west
Mar 4, 2021 · Apt 4H
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective reglaze tub in the 1st bathroom from north located at apt 4h, 4th story, 1st apartment from south at west
Mar 4, 2021 · Apt 4H
Closed — Violation dismissed
DOB building violations · 10
- Immediate emergency anythingoptional
Erect sidewalk shed at exposure#1 approximately 25' (full length of ex posure#10 with catchall on the left side(covering entrance to adjacent property 190 norfolk street) to provide overhead pedestrain protection forthwith
Jun 7, 2022
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - active - Construction other optional
C-construction other optional
Apr 11, 1991
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Apr 11, 1991
Dob violation - dismissed - Plumbing none
P-plumbing none
Mar 20, 1991
Dob violation - active
ECB violations · 6
- Class - 1
Failure to maintain building in a code- compliant manner. at time of inspection, observed vertical crack ranging in width from the 6th floor to the roof level of exposure #2, separating the brick from the morta
Jun 7, 2022 · Penalty $1,250
Resolve - Non-hazardous
Work w.o a permit work noted at 1st floor public hallway in approx 10'-12' drop down ceiling created using combination of metal and wood framing with 5/8' sheet rock finish with recessed which installed w/o
Jan 22, 2004 · Penalty $2,500
Resolve - Hazardous
Exit passageway or corridor: total obstruction. noted:passageway from rear fireescape is blocked by 8'-0" high wood wall made with 2"x4" wood studs & 2 plywood sheets. fireescape entirely overgrown by vines.
Jun 19, 2001 · Penalty $480
Resolve - Non-hazardous
Exit passageway: total obstruction. noted: at rear yard north side approx 8' fence with sealed doorway of erected preventing passage fromrear fire escape to area of refuge. yard enclosed less than 30' deep.
Oct 19, 1999 · Penalty $350
Resolve - Non-hazardous
Work does not conform to approved plans. noted: at 1st fl level rear apt #1i rear bdrm wood frame loft type structure erected w/ accessory wood frame stairs leading to loft. opening larger than 3'x7' w/ windo
Jul 21, 1999 · Penalty $250
Resolve - Hazardous
Failure to provide required means of egress for every floor. noted:- egress of rear fire escape & rear yard does not lead to safe area but blocked with 8' high fence. (rear yard 10'x 20' totally sealed) remedy
Dec 17, 1997 · Penalty $480
Resolve
Complaints
- General
Bell/buzzer/intercom
Mar 1, 2025 · Apt 4G
Close - Door/window
Door
Mar 1, 2025 · Apt 4G
Close - Safety
Window guard broken/missing
Sep 16, 2022 · Apt BLDG
Close - Flooring/stairs
Floor
Mar 15, 2021 · Apt 4H
Close - General
Bell/buzzer/intercom
Mar 15, 2021 · Apt 4H
Close - General
Bell/buzzer/intercom
Feb 19, 2021 · Apt 4H
Close - Plumbing
Bathtub/shower
Feb 19, 2021 · Apt 4H
Close - Flooring/stairs
Floor
Feb 19, 2021 · Apt 4H
Close - Door/window
Window frame
Feb 19, 2021 · Apt 4H
Close - Unsanitary condition
Pests
Feb 19, 2021 · Apt 4H
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Jan 25, 2019 · Apt 5H
Close - Heat/hot water
Entire building
Oct 2, 2015 · Apt 4H
Close - Nonconst
Vermin
Apr 24, 2008 · Apt 5G
Close - Heating
Heat related
Jan 1, 2008 · Apt 5G
Close - Heating
Heat related
Dec 1, 2007 · Apt 5G
Close - Heating
Heat related
Nov 24, 2007 · Apt 5G
Close - Heating
Heat related
Nov 10, 2007 · Apt 5G
Close - Paint/plaster
Ceiling
Sep 12, 2007 · Apt 5G
Close - General
Windows
Sep 12, 2007 · Apt 5G
Close - General
Floor
Sep 12, 2007 · Apt 5G
Close - General
Floor
Sep 12, 2007 · Apt 5G
Close - Nonconst
Vermin
Sep 12, 2007 · Apt 5G
Close - Nonconst
Vermin
Aug 25, 2007 · Apt 5G
Close - Nonconst
Vermin
Aug 25, 2007 · Apt 5G
Close - General
Floor
Mar 11, 2007 · Apt 5G
Close - Nonconst
Vermin
Mar 11, 2007 · Apt 5G
Close - Heating
Heat related
Jan 21, 2007 · Apt 6G
Close - Nonconst
Vermin
Dec 4, 2006 · Apt 5G
Close - Nonconst
Vermin
Oct 3, 2006 · Apt 5G
Close - Nonconst
Vermin
Jul 25, 2006 · Apt 4G
Close - Nonconst
Vermin
Jul 25, 2006 · Apt 5G
Close - Nonconst
Vermin
Jul 7, 2006 · Apt 5G
Close - Nonconst
Vermin
Jul 7, 2006 · Apt 5G
Close - Nonconst
Vermin
Jul 7, 2006 · Apt 5G
Close - General
Mold
May 31, 2005 · Apt 1G
Close - General
Locks
Feb 26, 2005 · Apt 5G
Close - Electric
Electric-supply
Feb 26, 2005 · Apt 6H
Close - Heating
Heat related
Feb 11, 2005 · Apt 5G
Close - Heating
Heat related
Jan 18, 2005 · Apt 5G
Close - Heating
Heat related
Jan 17, 2005 · Apt 6G
Close - Heating
Heat related
Jan 15, 2005 · Apt 6G
Close - Heating
Heat related
Dec 14, 2004 · Apt 6G
Close - Heating
Heat related
Dec 14, 2004 · Apt BLDG
Close - Heating
Heat related
Dec 14, 2004 · Apt 5G
Close - Heating
Heat related
Dec 12, 2004 · Apt 5G
Close - Heating
Heat related
Nov 8, 2004 · Apt 5G
Close - Heating
Heat related
Sep 14, 2004 · Apt 1G
Close - Paint/plaster
Wall
Jul 20, 2004 · Apt PUBLI
Close - Nonconst
Janitor/super
Jul 20, 2004 · Apt PUBLI
Close - Nonconst
Vermin
Jul 20, 2004 · Apt PUBLI
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1900
- Floors
- 6
- Residential units
- 13
- Building area
- 8,568 ft²
- Lot area
- 1,875 ft²
- Zoning
- R8A
- Community board
- 103
- Council district
- 2
- Block / lot
- 355 / 48
- Assessed value
- $909,000
- Landmark / historic district
- No
HPD registration #138781, last renewed Sep 12, 2025.
Questions about 188 Norfolk Street
Who owns 188 Norfolk Street?
The owner of record in NYC Department of City Planning PLUTO data is 186 Norfolk LLC C/O G.
Does 188 Norfolk Street have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 188 Norfolk Street rent stabilized?
NYC Department of Finance tax bills listed 7 rent-stabilized units here in 2024 (about 54% of its 13 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 188 Norfolk Street built?
City records list 1900 as the year it was built.
How many apartments are in 188 Norfolk Street?
It has 13 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.