131 Rivington Street
Manhattan, NY 10002BBL 1-00353-0057Map
Owner of record: 122 Norfolk Street, LLC
131 Rivington Street is a walk-up apartment building built in 1920 in Manhattan, 10002. It has 30 residential units across 6 floors. The owner of record is 122 Norfolk Street, LLC. HPD has recorded 159 housing violations here, most recently on August 30, 2023. 7 of the 50 most recent violations are still open. City tax records listed 13 rent-stabilized apartments here in 2024.
- HPD violations
- 159
- DOB violations
- 16
- ECB violations
- 19
- HPD complaints
- 116
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 159
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 2nd room from north located at apt 13, 4th story, 3rd apartment from west at north
Aug 30, 2023 · Apt 13
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the 2nd room from north located at apt 13, 4th story, 3rd apartment from west at north
Aug 30, 2023 · Apt 13
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 16, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories, all balconies and all componets at building front at fire escape
Sep 21, 2020
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner unit installed at window 2nd story balcony at building front
Sep 21, 2020
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner unit installed at window 6th story balcony at building front
Sep 21, 2020
Closed — Violation closed - BHazardous
Replace with new the broken or defective sink base cabinet in the kitchen located at apt 13, 4th story, 3rd apartment from west at north
Sep 16, 2020 · Apt 13
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation heat riser in the kitchen located at apt 13, 4th story, 3rd apartment from west at north
Sep 16, 2020 · Apt 13
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north located at apt 13, 4th story, 3rd apartment from west at north
Sep 16, 2020 · Apt 13
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors , in the entrance located at apt 13, 4th story, 3rd apartment from west at north
Sep 16, 2020 · Apt 13
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 13, 4th story, 3rd apartment from west at north
Sep 16, 2020 · Apt 13
Closed — Violation closed - BHazardous
Replace with new the broken or defective wire glass at skylight in public hall bulkhead , 6th story
Aug 25, 2020
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor at public hall, 2nd story
Aug 25, 2020
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pot at 3rd story balcony, north stack at fire escape
Aug 25, 2020
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors ... in the entrance located at apt 17, 4th story, 2nd apartment from east at south
Aug 25, 2020 · Apt 17
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall, west wall, north wall, ceiling in the bathroom located at apt 5, 2nd story, 2nd apartment from east at south
Aug 22, 2020 · Apt 5
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from east at south wall in the kitchen located at apt 5, 2nd story, 2nd apartment from east at south
Aug 22, 2020 · Apt 5
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall, west wall, north wall, ceiling in the kitchen located at apt 5, 2nd story, 2nd apartment from east at south
Aug 22, 2020 · Apt 5
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 5th room from east located at apt 5, 2nd story, 2nd apartment from east at south
Aug 22, 2020 · Apt 5
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door from west at north wall, 1st door frame from west at north wall in the foyer located at apt 5, 2nd story, 2nd apartment from east at south
Aug 22, 2020 · Apt 5
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the foyer located at apt 5, 2nd story, 2nd apartment from east at south
Aug 22, 2020 · Apt 5
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall, west wall, north wall, ceiling in the 1st room from east located at apt 5, 2nd story, 2nd apartment from east at south
Aug 22, 2020 · Apt 5
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, west wall in the 4th room from east located at apt 5, 2nd story, 2nd apartment from east at south
Aug 22, 2020 · Apt 5
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall in the 4th room from east located at apt 5, 2nd story, 2nd apartment from east at south
Aug 22, 2020 · Apt 5
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall, west wall, north wall in the 5th room from east located at apt 5, 2nd story, 2nd apartment from east at south
Aug 22, 2020 · Apt 5
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; located at apt 5, 2nd story, 2nd apartment from east at south
Aug 22, 2020 · Apt 5
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice located at apt 5, 2nd story, 2nd apartment from east at south
Aug 22, 2020 · Apt 5
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall, 1st window frame from east at south wall in the bathroom located at apt 5, 2nd story, 2nd apartment from east at south
Aug 22, 2020 · Apt 5
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall, 1st door frame from east at south wall, picture moulding at east wall, picture moulding at west wall, east wall in the foyer located at apt 5, 2nd story, 2nd apartment from east at south
Aug 22, 2020 · Apt 5
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from east at south wall in the 1st room from east located at apt 5, 2nd story, 2nd apartment from east at south
Aug 22, 2020 · Apt 5
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall in the 4th room from east located at apt 5, 2nd story, 2nd apartment from east at south
Aug 22, 2020 · Apt 5
Open — Defect letter issued - BHazardous
Properly repair with similar material the broken or defective metal cornice at roof north
Aug 21, 2020
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Aug 21, 2020
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Aug 21, 2020
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 3rd story balcony, north stack at fire escape
Aug 21, 2020
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ... vinyl floor cover. in the 4th room from east located at apt 5, 2nd story, 2nd apartment from east at south
Jun 29, 2020 · Apt 5
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ... vinyl floor cover. in the kitchen located at apt 5, 2nd story, 2nd apartment from east at south
Jun 29, 2020 · Apt 5
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ... 4 sqft of plaster at ceiling in the kitchen located at apt 5, 2nd story, 2nd apartment from east at south
Jun 29, 2020 · Apt 5
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ... 4 sqft of plaster at south wall in the kitchen located at apt 5, 2nd story, 2nd apartment from east at south
Jun 29, 2020 · Apt 5
Closed — Violation closed - BHazardous
Replace with new the broken or defective ... wood door in the 1st room from east located at apt 5, 2nd story, 2nd apartment from east at south
Jun 29, 2020 · Apt 5
Closed — Violation closed - BHazardous
Replace with new the broken or defective .. glass at north dormer window in the 4th room from east located at apt 5, 2nd story, 2nd apartment from east at south
Jun 29, 2020 · Apt 5
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ... 4 sqft of plaster at east wall in the 1st room from east located at apt 5, 2nd story, 2nd apartment from east at south
Jun 29, 2020 · Apt 5
Closed — Violation closed - BHazardous
Provide an adequate supply of gas to the fixtures ...at stove in the kitchen located at apt 5, 2nd story, 2nd apartment from east at south
Jun 29, 2020 · Apt 5
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department .. east wall, south wall, north wall, ceiling in the kitchen located at apt 5, 2nd story, 2nd apartment from east at south
Jun 29, 2020 · Apt 5
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department .. 1st window frame from east at south wall, south wall in the 4th room from east located at apt 5, 2nd story, 2nd apartment from east at south
Jun 29, 2020 · Apt 5
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department .. south wall, east wall, 1st door frame from north at east wall in the 5th room from east located at apt 5, 2nd story, 2nd apartment from east at south
Jun 29, 2020 · Apt 5
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ... 4 sqft of plaster at ceiling in the 1st room from east located at apt 5, 2nd story, 2nd apartment from east at south
Jun 29, 2020 · Apt 5
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 5th room from east located at apt 5, 2nd story, 2nd apartment from east at south
Jun 29, 2020 · Apt 5
Open — Defect letter issued
DOB building violations · 16
- Construction other optional
Failure to maintain building in a code compliant manner.at time of ins pection observed multiple areas of cracked/spalling stone at exp1.at e xp2 observed multiple areas of cracled/spalled stone in multiple locat ions of the building.exp1 damaged window sills.observed cracked stucco at exp1 street level.remedy:repair and/or replace
Apr 9, 2024
Dob violation - active - Construction other optional
Emergency work order due to hazrdous loose material observed at exp1 l oose cracked stone at multiple locations.at exp2 observed loose cracke d stone at multiple locations.remedy:immediately remove loose hazardou s material noted.provide safety measures under the direction of a lic professional.install sidewalk shed
Apr 9, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 7, 2024
Dob violation - dismissed - Construction other optional
Failure to maintain building in a code compliant manner.observed at exposure#1 north elevation 1st floor.defected conditions at exposure: crack open joint,spalled concrete,damaged stucco/flaking paint
Dec 26, 2023
Dob violation - active - Construction other optional
Failure to maintain building in code compliant manner.observed crack stucco 1 floor at exposure 1 north elevation with defect at entrance masonry awning.crack open joints.spalling & flooring of points/stucco remedy:maintain building,repair and or replace
Aug 23, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active
Show 6 more ↓
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Construction other optional
The borough commissioner has issued a stop work order for application #123136828 due to a failed audit. stop all work immediately, make site safe, contact borough commissioner office forthwith
May 11, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 7, 2018
Dob violation - dismissed - Construction other optional
The borough commissioner has placed an administrative stop work order for application/permit# 122329113. the applicant of record has withdra wn. stop all work, make site safe. contact borough commissioner's offi ce immediately
Jan 17, 2018
Dob violation - active - Construction other optional
Borough commissioner has issued a stop work order for application #123 136828 due to audit objection of pw1 sec 26, stop all work immediately except to make site safe, provide all required information to borough commissioner
Nov 29, 2017
Dob violation - active - Construction other optional
C-construction other optional
May 1, 1990
Dob violation - dismissed
ECB violations · 19
- Class - 2
Failure to submit an acceptable required cycle 8c and 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #914981. agg1: prior nov 3702311
Apr 8, 2025 · Penalty $10,000
Active - Class - 2
At time of inspection of a 6-story building observed sidewalk shed erected exp#1 sidewalk shed not conform to approve drawing. not covering the full area drawing show sidewalk shed shall cover the full area exp
Dec 24, 2024 · Penalty $1,250
Active - Class - 2
Failure to maintain building walls and appurtenances. at time of inspection, i observed cracking stucco surrounding chimney of roof level area at expo. (3)east elevation. and cracking ceramic coping at expo. (
Mar 4, 2024 · Penalty $1,250
Active - Class - 2
At time of inspection on a 6 story observe sidewalk shed erected at exposure #1 sidewalk shed not confrom to approved drawings. not covering the full areas to be covered of the building at exposure#1-2..
Dec 7, 2023 · Penalty $1,250
Resolve - Class - 1
At time of inspection on a 6 story observe sidewalk shed erected at exposure #1with no electrical permit on file on dob nowprovide permit
Dec 7, 2023
Resolve - Class - 1
Failure to maintain exterior building facade and appurtenances. at thetime of inspection i observed the chimney at the roof level has cracked and bulding all around as i observed cracked at the coping in multip
Dec 7, 2023 · Penalty $2,500
Active - Class - 1
Responding a complaint observed: supported scaffold installed at expo# 4 contrary to approved drawings eq-104.00 elevation c; with 6 fully plank levels and truss beam support on the center section no showing on
Jun 14, 2023 · Penalty $625
Resolve - Class - 2
Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#814981.agg1:prior nov 37018255h under 2
Oct 19, 2022 · Penalty $3,125
Active - Class - 2
Failure to maintain building exterior walls/facade and appurtenances.note at the time of inspecitons view at exposure 1 north elevation a/c support inadequate at 3rd and 4th floor.object/flower pots on fire esc
Jul 28, 2021 · Penalty $1,250
Active - Class - 2
Temporary construction equipment on site expired pemrit for sidewlka shed at time of inspection in resposne to complaint fo expired permit observed sidewlak shed in place at exposure #1 and #2 and upon researcg
Jun 17, 2020 · Penalty $3,125
Resolve
Show 9 more ↓
- Class - 2
Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#814981.remedy:submit acceptable require
Feb 13, 2020 · Penalty $6,250
Active - Class - 2
Bc 3307.6.4.4 failure to maintain sidewalk shed. at time of inspection,in response to complaint#1521247,observed sidewalk shed in place w/ its vertical members placed on sidewalk closer from 18" from the face o
Sep 11, 2019 · Penalty $620
Resolve - Class - 2
Expired permit for sidewalk shed @tim eof inspection in response to compliant #1521247, observed sidewalk shed in place eith expired permit on 07/31/2019. temporary const equipment requires a permit of all time
Sep 11, 2019 · Penalty $1,250
Resolve - Class - 1
Filed a cert,form,app etc.containing a material false statement(s)noted:the owner/rep made false cert on sec#26 of pwi job #123136828 which was filed on 08/30/17 by check marking"no"for both "owners cert regard
Nov 14, 2017 · Penalty $4,800
Active - Class - 2
Failure to maintain bldg walls and appurtenances.noted at time of inspection (i) at east courtyard; a-at north facing facades-spalled brick work at spandrel between 1/f basement windows; b-at south facing facad
Apr 14, 2016 · Penalty $500
Active - Non-hazardous
Failure to maintain building exterior wall- in that the one story extention at south is bulging with open, defective, and loose mortar joints, condition exist from top of parapet wall to grade level. remedy:
Jul 6, 2005 · Penalty $180
Active - Non-hazardous
Work without a permit. work noted: demolition on ceilings and walls in various apartments. remedy: stop all work until all necessary permits are obtained.
Dec 12, 1991
Resolve - Non-hazardous
Failure to maintain defect is marble landings between floors at public stairs are cracked and defective steel stringers and risers throughout public stairs are rotted and defectlive. remedy file plans obtain a
Nov 28, 1988 · Penalty $100
Resolve - Non-hazardous
Failure to maintain. remedy: file plans, obtain permit and repair and replace above noted defects.
Oct 11, 1988 · Penalty $500
Resolve
Complaints
- Unsanitary condition
Mold
Dec 29, 2025 · Apt 13
Close - Door/window
Window frame
Oct 26, 2023 · Apt 29
Close - Paint/plaster
Wall
Oct 26, 2023 · Apt 29
Close - Electric
Outlet/switch
Oct 26, 2023 · Apt 29
Close - Unsanitary condition
Mold
Sep 13, 2023 · Apt 13
Close - Water leak
Heavy flow
Aug 26, 2023 · Apt 13
Close - Electric
Lighting
Aug 26, 2023 · Apt 13
Close - Water leak
Heavy flow
Aug 21, 2023 · Apt 13
Close - Plumbing
Basin/sink
Sep 15, 2020 · Apt 13
Close - Paint/plaster
Radiator
Sep 15, 2020 · Apt 13
Close
Show 40 more ↓
- Unsanitary condition
Pests
Sep 15, 2020 · Apt 13
Close - Flooring/stairs
Floor
Sep 15, 2020 · Apt 13
Close - Plumbing
Steam pipe/riser
Sep 15, 2020 · Apt 13
Close - General
Cabinet
Sep 15, 2020 · Apt 13
Close - Plumbing
Bathtub/shower
Sep 15, 2020 · Apt 13
Close - Plumbing
Basin/sink
Sep 15, 2020 · Apt 13
Close - Unsanitary condition
Mold
Sep 15, 2020 · Apt 13
Close - Door/window
Door
Sep 15, 2020 · Apt 13
Close - Paint/plaster
Wall
Aug 19, 2020 · Apt 5
Close - Safety
Fire escape
Aug 19, 2020 · Apt BLDG
Close - Door/window
Door
Aug 19, 2020 · Apt 9
Close - Safety
Smoke detector
Aug 19, 2020 · Apt 9
Close - Safety
Carbon monoxide detector
Aug 19, 2020 · Apt 9
Close - Door/window
Door
Aug 19, 2020 · Apt 17
Close - Door/window
Door
Aug 19, 2020 · Apt 13
Close - Safety
Smoke detector
Aug 19, 2020 · Apt 27
Close - Safety
Carbon monoxide detector
Aug 19, 2020 · Apt 27
Close - Water leak
Slow leak
Aug 19, 2020 · Apt 5
Close - Unsanitary condition
Pests
Aug 19, 2020 · Apt 5
Close - Safety
Window guard broken/missing
Aug 19, 2020 · Apt 5
Close - Paint/plaster
Ceiling
Aug 19, 2020 · Apt 5
Close - Paint/plaster
Wall
Aug 19, 2020 · Apt 5
Close - Safety
Window guard broken/missing
Aug 19, 2020 · Apt 5
Close - Safety
Window guard broken/missing
Aug 19, 2020 · Apt 4
Close - Paint/plaster
Ceiling
Aug 19, 2020 · Apt 5
Close - Safety
Window guard broken/missing
Aug 19, 2020 · Apt 5
Close - Paint/plaster
Wall
Aug 19, 2020 · Apt 5
Close - Paint/plaster
Ceiling
Aug 19, 2020 · Apt 5
Close - Paint/plaster
Wall
Aug 19, 2020 · Apt 5
Close - Paint/plaster
Ceiling
Aug 19, 2020 · Apt 5
Close - Outside building
Skylight
Aug 19, 2020 · Apt BLDG
Close - General
Signage missing
Aug 19, 2020 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 19, 2020 · Apt 9
Close - Paint/plaster
Wall
Jun 18, 2020 · Apt 5
Close - Appliance
Electric/gas range
Jun 18, 2020 · Apt 5
Close - General
Cooking gas
Mar 3, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 3, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 2, 2020 · Apt BLDG
Close - General
Cooking gas
Mar 2, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 2, 2020 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1920
- Floors
- 6
- Residential units
- 30
- Building area
- 25,650 ft²
- Lot area
- 5,025 ft²
- Zoning
- R7A
- Community board
- 103
- Council district
- 1
- Block / lot
- 353 / 57
- Assessed value
- $3,131,100
- Landmark / historic district
- No
HPD registration #100479, last renewed Sep 22, 2025.
Questions about 131 Rivington Street
Who owns 131 Rivington Street?
The owner of record in NYC Department of City Planning PLUTO data is 122 Norfolk Street, LLC.
Does 131 Rivington Street have violations?
Yes. NYC HPD has recorded 159 housing violations at this property.
Is 131 Rivington Street rent stabilized?
NYC Department of Finance tax bills listed 13 rent-stabilized units here in 2024 (about 43% of its 30 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 131 Rivington Street built?
City records list 1920 as the year it was built.
How many apartments are in 131 Rivington Street?
It has 30 residential units and 32 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.