125 Delancey Street
Manhattan, NY 10002BBL 1-00352-7501Map
Owner of record: Unavailable Owner
125 Delancey Street is a condominium built in 2016 in Manhattan, 10002. It has 195 residential units across 26 floors. The owner of record is Unavailable Owner. HPD has recorded 6 housing violations here, most recently on February 10, 2026. City tax records listed 98 rent-stabilized apartments here in 2024.
- HPD violations
- 6
- DOB violations
- 45
- ECB violations
- 39
- HPD complaints
- 8
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 6
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door hinges in the entrance located at apt 1508, 15th story, 2nd apartment from east at south
Feb 10, 2026 · Apt 1508
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 1st room from north located at apt 1905, 19th story, 1st apartment from north at east
Oct 1, 2023 · Apt 1905
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from north located at apt 1905, 19th story, 1st apartment from north at east
Oct 1, 2023 · Apt 1905
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from north located at apt 1905, 19th story, 1st apartment from north at east
Oct 1, 2023 · Apt 1905
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed
DOB building violations · 45
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed
Show 35 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2022
Apr 22, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 14, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 14, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 14, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 14, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 14, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 14, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 14, 2020
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 14, 2018
Dob violation - dismissed - Construction other optional
Due to truck striking sidewalk shed
May 2, 2018
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 25, 2017
Vp*-violation unserved ecb- dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 14, 2017
Dob violation - dismissed - Construction other optional
Due to truck striking i beam above column on sidewalk shed
May 11, 2017
Dob violation - dismissed
ECB violations · 39
- Class - 2
Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #917508. remedy: submit acceptable requ
Apr 8, 2025 · Penalty $2,500
Resolve - Class - 2
Work without a permit. at time of inspection, noted 1-story exterior wood dining structure attached to building approximately 28'l x 10'd at exposure 1. no permits issued or filed with dob., obtain all permits
Feb 18, 2025 · Penalty $1,250
Active - Class - 1
C/u;89i11,97#17,97##:(89)damaged step-replace-cease use item (97)all ffaulty musy be cleared and installed checked-cease use item. (97)failure to report accident promptly according to bc 3012.1. accident occurr
Mar 30, 2023 · Penalty $3,750
Resolve - Class - 2
#a9 sprinkler unit i.e. fire sprinkler installed above escalator has to be removed. non-compliance with escalator code.
Feb 13, 2019
Resolve - Class - 2
Respondent failed to make the proper notification for mobile crane after may 1, 2018 to the department. at time of inspection it was discovered that no mobile crane (cn 34418) was on site.notification was made
Jan 15, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain safe operations(exposed cables lines)responding toan incident of a worker(zapped)installing low-voltage cables when he made contact w/a temporary fixture connected to permenant(high voltage)
Aug 21, 2018
Resolve - Class - 1
Hoist no in readiness. in response to an incident which occurred that 13 workers were stuck in an elevator between 1st and 6th flr. at time of inspection elevator company were still working on fixing the eleva
Jul 31, 2018
Resolve - Class - 1
Unlawfully to continue to work contrary to swo at time of inspection for complaint#1474999,observed workers on site working on the area thatis currently under a partial swo issued by badge#2870,vio#35317775z on
Apr 6, 2018 · Penalty $5,000
Resolve - Class - 1
Failure to safeguard. at the time of response to incident in which worker had fallen into con edsion utility vault at exterior(sidewalk)of bldg at exp#3. i observed plywood that was used to cover opening of vau
Mar 23, 2018 · Penalty $10,000
Resolve - Class - 1
3301.2 safety measures: note: at time of inspection of a 26 story new building that is topped out. i observed on several floors with electrical cords on the floors at several locations creating a tripping hazar
Feb 5, 2018 · Penalty $400
Resolve
Show 29 more ↓
- Class - 2
Inadequate housekeeping. note: at time of inspection of a 26 story new building that is topped out. i observed on several floors- debris - consisting of construction materials & cutoffs scattered on several flo
Feb 5, 2018
Resolve - Class - 1
100b06,16i10,26n10-100b06)general contractor using electric pallet jack on hoist not to code must be manually pushed and wheels secured. 16i10)hoist doors damaged from jack, repair. 26n10)top emergency exit swi
Dec 19, 2017 · Penalty $250
Resolve - Class - 1
38i11,44i11-38i11)replace damaged traveling cable. 44i11)replace damaged traveling cable trolly must provide test weights for cease use lift also call - (212) 393-2500 or email [email protected].
Dec 15, 2017
Resolve - Class - 1
Housekeeping @time of insp observed inadequate housekeeping @various locn fls throughout site & @leading edge of elevator shaft,consisting of loose material debris,extension cords strewen about & laying on fls,
Oct 25, 2017 · Penalty $2,400
Resolve - Class - 2
Failure to insitute safety measures @time of insp observed that there was no control access zone established @the 6th sty balcony w/an over head tower crane in full use liftng large window sections from grade t
Oct 25, 2017 · Penalty $5,000
Resolve - Class - 2
Failure to installed equipment as per (cd5) note:observed out rigger beams erected not on center line of the base that does no conform to cd5,all equipment must be installed as per cd5 do not use suspended scaf
Sep 26, 2017 · Penalty $250
Resolve - Class - 1
No handrails noticed at time of inspection nb in progress noticed handrails missing in open stair cases on floors 7,8,9,10,11,12,13,14,15,16,17,and 20.remedy:provide handrails as per code
Sep 25, 2017 · Penalty $1,000
Resolve - Class - 2
3301.2 failure to maintain adequate egress. notices at time of inspection nb in progress.noticed on 5th floor corridor hallway egress path is partially blocked ny installed conduit pipe.pipe hangs down from cei
Sep 25, 2017 · Penalty $400
Resolve - Class - 2
3308.3 vertical netting not to code. noticed at time of inspection nb in progress.noticed on floors 11,15,16,17,18 and 20 vertical netting not to code.nets have holes in various spots, nets loose hanging down a
Sep 25, 2017 · Penalty $400
Resolve - Class - 1
Failure to maintain housekeeping. noticed at time of inspection nb in progress.noticed on floors 15,16,and 19 housekeeping not maintained tocode.noticed on eyebrows beyond vertical netting debri not cleaned not
Sep 25, 2017 · Penalty $1,000
Resolve - Class - 1
97b07:unsafe use of personal hoist equipment;while preparing overhead protection.the hoist equipment was unsafe creating a hazardous condition causing an incident to where a t-bolt clamp fell and hit a parked
Sep 18, 2017
Resolve - Class - 1
Failure to maintian adequate housekeeping:note:a time of inspection of a proposed 26 story new building(poured)23rd fl. i observed ina dequate housekeeping from 15 to 19 story.construction materials and
Sep 16, 2017 · Penalty $2,400
Resolve - Class - 1
Failure to safeguard. noticed at time of inspection incident. worker lifting plywood hole covers on 3rd fl fell through hole down to 2nd fl approx 15foot drop. worker not wearing & proper protection. worker inj
Jul 5, 2017
Resolve - Class - 2
Refer to swo0505817xs01:operating a crane w/expired cd(cd#4845 cn#1134/15 hmo david sanchez lic#9873 exp 4/30/18 rem:obtain cd
May 8, 2017 · Penalty $2,400
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction oeprations. note: at the time of my inspection of a 26 sty bldg at 5th fl level,construction work in progress. responding to complaint#144805
Apr 13, 2017 · Penalty $25,000
Resolve - Class - 2
Failure to institute and maintain safety equipment measures and temporary construction.note: at the time of my insection of a 26story building at 5th floor level,construction work in progress.i observed that
Apr 13, 2017 · Penalty $5,000
Resolve - Class - 1
Sec. 3307.4.7 work or storage zones. note: at the time of my inspection of a 26 sty bldg at 5th fl level,construction work in progress. i observed pedestrian walkway below sidewalk shed adjacent to storage &
Apr 13, 2017
Resolve - Class - 1
Operation of an articulating boom crane without a certificate of operation.see swo #04117rh01.at time of inspection gc above contracter user (precision hoist) to erect personnel/material hoist at the corner of
Apr 11, 2017 · Penalty $1,000
Resolve - Class - 2
Operation of crane without a certificate of onsite inspection (no cn)see s wo#041117rh01.respondent above used knuckeboom to erect personnel /material hoist on active job site at corner of essex and delancy
Apr 11, 2017 · Penalty $2,400
Resolve - Class - 1
Operation of articulating boom crane without certificate of operation.see sw o#0417rh01.at the time of inspection personnel/hoist material at corner of exxesx and delancey streets on active jobsite.user could
Apr 11, 2017 · Penalty $1,000
Resolve - Class - 1
Operation of an articulating boom crane without a certificate of operation see swo #041117rh01 at time of inspection (knucle)boom lk#17244-tc(ny)belonging to respondent above was being used to erect personel/
Apr 11, 2017 · Penalty $1,000
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. tower crane cd#4810 cn 1061/15 failure to maintain guardrails around tower crane perimeter base. remedy: build guardrails around
Feb 8, 2017 · Penalty $1,200
Resolve - Class - 1
3301.1.2 fire code: note at time of inspection of a 26 story building that is topped out. i observed missing exits signs at several stories. this creates a potential hazardous conditions for workers, first resp
Feb 5, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard. noticed at time of inspection nb in progress. incident concrete operations in progress. workers pouring 1st flr concrete.concrete pump track got damaged causing concrete to splatter over
Jan 27, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to maintain safety equipment measures-missing toe boards.noted:missing toe boards @guardrailing system, throughout.rem:provide toeboards,comply w.code.
Aug 4, 2016 · Penalty $1,000
Resolve - Class - 2
Sec. 3301.6.1 design. note: at the time of my inspection of a 26 sty bldg at excavation phase concrete pouring operation in progress. i observed that concrete washout was done in a makeshift box of plywood lumb
Apr 14, 2016
Resolve - Class - 1
Sides of excavation-guardrail system. note: at the time of my inspection of a 26 sty bldg at excavation phase approx 28feet below grade. i observed approx 20feet of unprotected excavation edge at exp#4,soil was
Apr 14, 2016 · Penalty $1,200
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operation. inadequate egress. note: at the time of my inspection of a 26 sty bldg at excavation phase approx 28feet below grade w/approx 50
Apr 14, 2016 · Penalty $2,400
Resolve - Class - 2
Sec. 3310.9 additional site safety personnel. note: at the time of my inspection of a 26 sty bldg in excavation phase concrete pouring operation in progress at sub cellar level. upon review of concrete safety
Apr 14, 2016
Resolve
Complaints
- Heat/hot water
Entire building
Oct 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 25, 2026 · Apt BLDG
Close - Plumbing
Water supply
May 12, 2025 · Apt 1905
Close - Water leak
Slow leak
Oct 16, 2023 · Apt 1905
Close - Water leak
Slow leak
Sep 29, 2023 · Apt 1905
Close - Water leak
Heavy flow
Sep 29, 2023 · Apt 1905
Close - Unsanitary condition
Pests
Sep 15, 2023 · Apt 703
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2016
- Floors
- 26
- Residential units
- 195
- Building area
- 320,601 ft²
- Lot area
- 43,206 ft²
- Zoning
- C6-1
- Community board
- 103
- Council district
- 1
- Block / lot
- 352 / 7501
- Assessed value
- $64,524,036
- Landmark / historic district
- No
HPD registration #144593, last renewed Jul 24, 2026.
Questions about 125 Delancey Street
Who owns 125 Delancey Street?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 125 Delancey Street have violations?
Yes. NYC HPD has recorded 6 housing violations at this property.
Is 125 Delancey Street rent stabilized?
NYC Department of Finance tax bills listed 98 rent-stabilized units here in 2024 (about 50% of its 195 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 125 Delancey Street built?
City records list 2016 as the year it was built.
How many apartments are in 125 Delancey Street?
It has 195 residential units and 199 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.