6 Clinton Street
Manhattan, NY 10002BBL 1-00350-0050Map
Owner of record: Monpike Corp
6 Clinton Street is a walk-up apartment building built in 1930 in Manhattan, 10002. It has 20 residential units across 6 floors. The owner of record is Monpike Corp. HPD has recorded 128 housing violations here, most recently on April 29, 2026. 11 of the 50 most recent violations are still open. City tax records listed 20 rent-stabilized apartments here in 2024.
- HPD violations
- 128
- DOB violations
- 5
- ECB violations
- 5
- HPD complaints
- 161
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 128
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 17, 6th story, 1st apartment from north at east
Nov 3, 2024 · Apt 17
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at balcony, at building front stack at fire escape, 4th story
Nov 3, 2024
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds the maximun of 130 degrees at all hot water fixtures in the entire apartment located at apt 13, 5th story, 2nd apartment from west at north
Jun 28, 2023 · Apt 13
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard, 1st story
Jun 5, 2023
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jun 5, 2023
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air condition unit at the rear of the building at fire escape, 2nd story
Jun 5, 2023
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of hook and latch from vestibule door at public hall, 1st story
Apr 8, 2023
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing hook and latch at bottom of vestibule door at public hall, 1st story
Nov 19, 2022
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing hook and latch at bottom of front building entrance door at public hall, 1st story
Nov 19, 2022
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Remove device preventing door from being self-closing consisting of(hook) installed at interior of vestibule door
Oct 25, 2022
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of(hook) installed at interior of building entrance door
Oct 25, 2022
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 6th story
Oct 25, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th story
Oct 25, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th story
Oct 25, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas stove in the kitchen located at apt 10, 4th story, 1st apartment from north at east
Nov 10, 2021 · Apt 10
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 10, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at vestibule at public hall, 1st story
Nov 10, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Nov 10, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Nov 10, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at vestibule at public hall, 1st story
Nov 10, 2021
Open — Nov sent out - CImmediately hazardous
Code: arrange and make self-closing the doors to east yard at public hall, 1st story
Nov 10, 2021
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 6th story
Nov 10, 2021
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th story
Nov 10, 2021
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 6th story
Nov 10, 2021
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed on door leading to fire escape window in the 22nd room from east at north located at apt 10, 4th story, 1st apartment from north at east
Nov 10, 2021 · Apt 10
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors in the entrance located at apt 10, 4th story, 1st apartment from north at east
Nov 10, 2021 · Apt 10
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 10, 4th story, 1st apartment from north at east
Nov 10, 2021 · Apt 10
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 10, 4th story, 1st apartment from north at east
Nov 10, 2021 · Apt 10
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors in the entrance located at apt 2, 2nd story, 1st apartment from north at east
Nov 10, 2021 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 10, 2021 · Apt 2
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Nov 10, 2021
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 10, 4th story, 1st apartment from north at east
Nov 9, 2021 · Apt 10
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Nov 9, 2021
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Nov 9, 2021
Closed — Violation dismissed - BHazardous
§ 53,187,231 m/d law & dept rules & reg. provide means of egress from yard to street by fireproof passageway for which application must be filed for approval,or by unlocked door or gate in fence to adjoining premises with consent of adjacent owner.
Nov 9, 2021
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures ... in the entire apartment located at apt 10, 4th story, 1st apartment from north at east
Nov 9, 2021 · Apt 10
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 10, 4th story, 1st apartment from north at east
Nov 9, 2021 · Apt 10
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the foyer located at apt 10, 4th story, 1st apartment from north at east
Nov 9, 2021 · Apt 10
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of lockable door knob assembly on door to room with egress window in the 1st room from east at south located at apt 10, 4th story, 1st apartment from north at east
Nov 9, 2021 · Apt 10
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 10, 4th story, 1st apartment from north at east
Nov 9, 2021 · Apt 10
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wall created from floor to ceiling to create additional room in the 2nd room from east at north located at apt 10, 4th story, 1st apartment from north at east
Nov 9, 2021 · Apt 10
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of consisting of key operated lockset installed on door leading to fire escape in the 1st room from east at south located at apt 10, 4th story, 1st apartment from north at east
Nov 6, 2021 · Apt 10
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures throughout in the entire apartment located at apt 10, 4th story, 1st apartment from north at east
Nov 6, 2021 · Apt 10
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 10, 4th story, 1st apartment from north at east
Nov 6, 2021 · Apt 10
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Nov 6, 2021
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wall erected from floor to ceiling using wood studs and sheetrock creating additional room in the 2nd room from east located at apt 10, 4th story, 1st apartment from north at east
Nov 6, 2021 · Apt 10
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 6, 2021
Closed — Violation dismissed - ANon-hazardous
Remove device preventing door from being self-closing consisting of hook and latch installed at bottom of vestibule door. at public hall, 1st story
Nov 6, 2021
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pot at 4th story balcony, front stack at fire escape
Jan 9, 2020
Closed — Violation dismissed
DOB building violations · 5
- Construction other optional
Borough commissioner issued a stop work order due to applicant of record surrendered dob filing privileges for application #m00245830-l1. 0% of work completed, stop all work immediately and make the site safe.
Jan 5, 2021
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed
ECB violations · 5
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings: previous complaint 1567195 issued violation 39038989h for work without permit for additional
Oct 20, 2021
Resolve - Class - 2
Failure to maintain building in code compliant manner: upon inspection observed at rear 2 mechanical exhaust vent systems. the exhaust vents are rusted with grease throughout and emanating noises., repair and/o
Oct 20, 2021 · Penalty $312
Active - Class - 2
Work without a permit: noted: upon inspection observed 2 mechanical exhaust vent systems for two separate eating and drinking establishments. both exhaust vents exit at ground level and extend to the roof. perm
Apr 7, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code-compliant manner.note:at time fo inspection of all common areas of above premises, observed all of floor tiles throught entire interior hallway leaving loose and uneven mort
Sep 24, 2019 · Penalty $310
Resolve - Class - 2
Failure to maintain bldg in code compliant manner re-installation maintenance of plumbing materials equipment per pc 102.3 & per fgc 404.1.in the 6 stories mix use bldg gas meters & related gas piping are insta
Feb 21, 2012 · Penalty $500
Resolve
Complaints
- Heat/hot water
Entire building
May 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2025 · Apt 2
Close - Heat/hot water
Entire building
Dec 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 3, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 29, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 23, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 15, 2023 · Apt 18
Close - Unsanitary condition
Garbage/recycling storage
Jun 25, 2023 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jun 23, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 14, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 7, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 24, 2022 · Apt BLDG
Close - Door/window
Door
Oct 24, 2022 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Oct 17, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 8, 2022 · Apt BLDG
Close - Electric
Power outage
Nov 15, 2021 · Apt 10
Close - Electric
Power outage
Nov 7, 2021 · Apt 10
Close - Electric
Power outage
Nov 5, 2021 · Apt 10
Close - Appliance
Electric/gas range
Nov 4, 2021 · Apt 10
Close - Appliance
Refrigerator
Nov 4, 2021 · Apt 10
Close - Electric
No lighting
Nov 4, 2021 · Apt 10
Close - Door/window
Door
Nov 4, 2021 · Apt 10
Close - Heat/hot water
Entire building
Jan 8, 2020 · Apt BLDG
Close - Paint/plaster
Ceiling
Aug 19, 2019 · Apt 9
Close - Heat/hot water
Apartment only
Mar 28, 2019 · Apt 9
Close - Flooring/stairs
Floor
Sep 5, 2018 · Apt 9
Close - Paint/plaster
Wall
Sep 5, 2018 · Apt 9
Close - Electric
Power outage
Sep 5, 2018 · Apt 9
Close - Electric
Wiring
Sep 5, 2018 · Apt 9
Close - Paint/plaster
Ceiling
Sep 5, 2018 · Apt 9
Close - Paint/plaster
Wall
Sep 5, 2018 · Apt 9
Close - Electric
Wiring
Sep 5, 2018 · Apt 9
Close - Safety
Smoke detector
Jun 22, 2018 · Apt 1
Close - Water leak
Slow leak
Jun 22, 2018 · Apt 1
Close - Unsanitary condition
Pests
Jun 22, 2018 · Apt 1
Close - Unsanitary condition
Pests
Jun 22, 2018 · Apt 1
Close - Water leak
Heavy flow
Jun 8, 2018 · Apt 9
Close - Heat/hot water
Entire building
Jan 6, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 6, 2018 · Apt 6
Close - Heat/hot water
Apartment only
Jan 6, 2018 · Apt 9
Close - Heat/hot water
Entire building
Jan 6, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 15, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 15, 2017 · Apt 13
Close - Unsanitary condition
Pests
Oct 9, 2017 · Apt 9
Close - Water leak
Slow leak
Oct 9, 2017 · Apt 9
Close - Water leak
Slow leak
Aug 26, 2017 · Apt 6
Close - Water leak
Slow leak
Aug 26, 2017 · Apt 6
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1930
- Floors
- 6
- Residential units
- 20
- Building area
- 13,045 ft²
- Lot area
- 2,700 ft²
- Zoning
- R8A
- Community board
- 103
- Council district
- 2
- Block / lot
- 350 / 50
- Assessed value
- $1,519,200
- Landmark / historic district
- No
HPD registration #122399, last renewed Jul 21, 2026.
Questions about 6 Clinton Street
Who owns 6 Clinton Street?
The owner of record in NYC Department of City Planning PLUTO data is Monpike Corp.
Does 6 Clinton Street have violations?
Yes. NYC HPD has recorded 128 housing violations at this property.
Is 6 Clinton Street rent stabilized?
NYC Department of Finance tax bills listed 20 rent-stabilized units here in 2024 (about 100% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 6 Clinton Street built?
City records list 1930 as the year it was built.
How many apartments are in 6 Clinton Street?
It has 20 residential units and 22 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.