140 Baruch Place is a walk-up apartment building built in 1920 in Manhattan, 10002. It has 36 residential units across 6 floors. The owner of record is NYC Housing Authority. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
25
ECB violations
19
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 25

  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)

    Jun 23, 2024

    Dob violation - dismissed
  • Construction other optional

    Emergency work order.at time of inspection,obsrvd in cellar boiler room,cool room,&trash compactr rom ground fl draped mesh slabs&steel beams in a state of disrepair.obrsvd corroded steel beams,concrt.ownr to engage nyspe&endrsd cntrctr to immed install temp shorng of ground fl slab&utilities@cellar,as req.all wrk to be supervisd full time

    Apr 10, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain.@ time of inspection,obsrvd in cellar boiler room, &trash compacter room ground fl draped meshlabs&steel beams in a state of disrepair.obsrvd corroded steel beams.ownr to engage nyspe&endrsd cntrctr to eval the ent bldg&rpair under permit.complete repair work by 6/12/2024

    Apr 10, 2024

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)

    Aug 21, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Jun 20, 2021

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 29, 2020

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)

    Mar 27, 2018

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)

    Feb 16, 2017

    Dob violation - dismissed
Show 15 more ↓
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Aug 16, 2016

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2015

    Mar 14, 2016

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7a technical report by 02/21/2012

    Jan 31, 2013

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Jan 22, 2013

    Dob violation - active
  • Facade facade optional

    (27-misc,28-misc) : local law report filed as "unsafe" bc-misc remedy: provide for safety of public as per above codes. file amended report when unsafe conditions are corrected : badge# 2252

    May 11, 2009

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Apr 24, 2009

    Dob violation - dismissed
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Aug 8, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed

ECB violations · 19

  • Class - 2

    Leaking water valve. heat rising in building. unable to secure due to flooded basement, maintain boiler; correct condition ______________________________________________________________________

    Jun 16, 2026 · Penalty $1,250

    Active
  • Class - 2

    Observed in the basement/cellar excessive combustible storage in the gas meter room. the combustible storage was 1 and 5 gallon paint containers and metal shelves. as per appendix e of the fgc gas meter rooms,

    Dec 6, 2023 · Penalty $625

    Active
  • Class - 2

    Firestopping removed, from the back exit passage way, first level. firestopping removed from the ceiling of office space exposing structural joist/wood beams 1st floor level., provide/maintain fire stopping

    Dec 6, 2023 · Penalty $1,250

    Active
  • Class - 2

    Failure to submit acceptable required cycle9a report of critical examination documenting condition of exterior wall&appurtenances required by28-302.4 for control#900652.submit acceptable required technical repo

    Dec 2, 2022 · Penalty $1,250

    Active
  • Class - 2

    - at ground level, heavy sidewalk shed/electric lighting has been installed around the buildings without a permit., obtain all permits

    Sep 19, 2022

    Resolve
  • Class - 2

    At buildings a&b, roof level staircase walls, walls show stucco damage and paint peeling due to water penetration through the walls, maintain exterior building wall

    Sep 19, 2022 · Penalty $1,250

    Active
  • Class - 2

    Failure to provide continuity of metalic raceway of electrical conduit (not provided) observed in cellar sidewalk shed conduit sperated and does not provide effective continuity of ground provide continuity of

    Jul 31, 2019 · Penalty $6,000

    Active
  • Class - 2

    Failure to maintain bldg in code compliant manner re: installation/ maintenance of plumbing materials/equipment per pc 102.3;28-902. observed in cellar over fifty feet of pvc plumbing piping material install

    Apr 27, 2018

    Active
  • Class - 2

    Failure to maintain bldg in code compliant manner observed in garden at exposure one of building storm water from roof being pumped out to the street through hoses. the plumbing code of 2014 requires that stor

    Apr 27, 2018

    Resolve
  • Class - 1

    Sec. 408.2 drips-future connection exits down stream of appliance. observed on 3-20-17 at above address future gas connections exits in basement. remedy: comply w/summons.

    Mar 20, 2017

    Resolve
Show 9 more ↓
  • Class - 2

    Failure to maintain exterior bldg roof- boiler chimney spalling brick coping cracked- chainlink fence disrepair/(nw corner) north fire escape screen white wire- roof drains holding water- southeast fire escape

    Oct 6, 2016

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner. noted: exit windows at bldg is a,b,c,d,e, and f has defective window balance (windows had to close when open) rmdy: repair and/or replace windows.

    Feb 8, 2016

    Resolve
  • Class - 2

    Failure to maintain bldg wall(s) or appurtenances.noted: at exp#3 (btw3rd flr and 4th flr) exterior brick facade has cracks around window and lintel areas. rmdy:maintain exteiror bldg wall.

    Feb 8, 2016

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner.noted: bulkhead roof skylight at buildings:a,b,c,d,e and f has cracks and allowing water to enter building.rmdy: repair and or replace skylights.

    Feb 8, 2016

    Resolve
  • Class - 2

    Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. 36009827n. remedy: file an amended report following

    Jul 16, 2010

    Resolve
  • Class - 1

    Local law report filed as "unsafe"by architect/engineer-no amended report was filed "unsafe conditions"require safety provisions for the public as per code 27-129(d),1rcny 32-03(b)(5)(c),no sidewalk shed,fence,

    Jan 10, 2010

    Resolve
  • Class - 2

    28-302-5local law report files as "unsafe" by arthitect or engineer,noamended report was filed "unsafe conditions"require safety provisions for the public as per jl 27-129 1-rcny 32-03(b) (5) (i)no sdwlk shed

    Dec 3, 2009

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report remedy:file an amended report following remedial repa

    Oct 23, 2009

    Resolve
  • Class - 2

    Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings

    Nov 21, 2008

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C4)
Year built
1920
Floors
6
Residential units
36
Building area
77,910 ft²
Lot area
23,058 ft²
Zoning
R7-2
Community board
103
Council district
2
Block / lot
325 / 1
Assessed value
$5,116,500
Landmark / historic district
No

Questions about 140 Baruch Place

Who owns 140 Baruch Place?

The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.

Does 140 Baruch Place have violations?

NYC HPD has no housing violations on record for this property.

Is 140 Baruch Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 140 Baruch Place built?

City records list 1920 as the year it was built.

How many apartments are in 140 Baruch Place?

It has 36 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.