288 Delancey Street
Manhattan, NY 10002BBL 1-00323-0001Map
Owner of record: NYC Housing Authority
288 Delancey Street is an elevator apartment building built in 1962 in Manhattan, 10002. It has 2,391 residential units across 14 floors. The owner of record is NYC Housing Authority. HPD has recorded 4 housing violations here, most recently on March 28, 2023. 4 of the 4 most recent violations are still open.
- HPD violations
- 4
- DOB violations
- 254
- ECB violations
- 95
- HPD complaints
- 8
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 4
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the kitchen , the foyer , the bathroom , the 2nd room from east, the 2nd private hallway from east, the 4th room from east, the 5th room from east at north located at apt gc, 1st story, 1st apartment from south at west
Mar 28, 2023 · Apt GC
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings and walls in the entire apartment located at apt ga, 1st story, 1st apartment from west at north
Dec 7, 2005 · Apt GA
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective door in the entrance located at apt ga, 1st story, 1st apartment from west at north
Dec 7, 2005 · Apt GA
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective lower window glass in the 1st room from north located at apt ga, 1st story, 1st apartment from west at north
Dec 7, 2005 · Apt GA
Open — Nov sent out
DOB building violations · 254
- Construction other optional
Emergency work order due to cracked/spalling slate coping stones at exposure #3 east elevation at first floor setback. remedy: provide adeauate safety measures (ie. fencing/netting) under direction of licensed professional at exposure #3 east elevation
Jun 20, 2025
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2023
Jun 23, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active
Show 40 more ↓
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - Construction other optional
Failure to comply with previous commissioner's order. failure to comply with commissioner's order #102419cllf02ns. as of 8/3/2021 owner has not complied with immediate cure order. remedy: immed comply with code and commissioner's order
Aug 3, 2021
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Oct 28, 2019
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Oct 28, 2019
Dob violation - active - Construction other optional
On 10/24/2019 at 2fl deterioration conditions at awning. cracks and damaged mortar joints and a/c supported by wood rmemdy:maintain building exterior walls/facade and appurtenance repair/make facade safe. provide adequate safety measures as per 1rcny 103-04
Oct 24, 2019
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Oct 16, 2019
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Oct 16, 2019
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Oct 15, 2019
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Oct 15, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst
Sep 6, 2019
Dob violation - dismissed - Nycha elev annual inspection/test elevatorrequired
Vio issued to nycha elevator-failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Nycha elev annual inspection/test elevatorrequired
Vio issued to nycha elevator-failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Site safety none
Cs-site safety none
Oct 1, 2018
Vp*-violation unserved ecb- dismissed - Facade safety program facade required
Fisp-facade safety program facade required
May 16, 2018
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
May 16, 2018
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Mar 27, 2018
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jan 31, 2018
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)
Feb 16, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed
ECB violations · 95
- Class - 2
Found underground steam pipe leaking outside of building, maintain boiler; correct violating condition submit certificate of correction ______________________________________________________________________
Aug 21, 2026 · Penalty $1,250
Active - Class - 2
Observed at front entrance door an active leak coming out from pipes and excessive steam causing condensation. there's a puddle in front of the building by public walkway by at exposure #1. boiler room directly
Jul 17, 2026 · Penalty $1,250
Active - Class - 1
Failure to maintain bldg exterior facade and appurtenances. note: at time of inspection, i observed exp #1 west-inadequate ac support multi loc.-exp #3 east (1)cracked/broken window 2nd fl. (2)loose/hanging met
Feb 13, 2026 · Penalty $5,000
Active - Class - 1
Failure to maintain bldg exterior facade and appurtenances. note: at time of inspection, i observed at exp #1 west(1) cracked brick by top fl window at southwest end (2)inadequate ac support multi loc. (3)multi
Feb 13, 2026 · Penalty $5,000
Active - Class - 1
Failure to maintain bldg exterior facade and appurtenances. note: at time of inspection, i observed exp #1 west(1) cracked brick by top fl window at southwest end. (2)inadequate ac support(wood) multi loc. (3)m
Nov 3, 2025 · Penalty $5,000
Active - Class - 2
Failure to maintain building exterior wall(s) or appurtenances. note:-at the time of inspection observed (1)at expo #1 west elevation crack on masonary and deteriorating mortar joint (2) at roof level step crac
Aug 18, 2025 · Penalty $2,500
Active - Class - 1
Failure to maintain exterior building facade and appurtenances. note: at time of inspection observed step crack on parapet walls of exp #1, 3, 4. broken/crack glass window exp #2. spalling brick of exp #3 spall
Jun 20, 2025 · Penalty $5,000
Active - Class - 1
Failure to provide/take required action to secure public safety at a designated unsafe building facade as per technical report tr6800634-8c-i1. note time of inspection i observed in multiple locations unlocked
Aug 22, 2024 · Penalty $10,000
Resolve - Class - 1
Failure to maintain exterior building and appurtenances.note:at time of inspection observed ac brakets hang and not secure at exposure#1.at exposure#1 observed step crack at parapet level at corner.rem:maintain
Aug 22, 2024 · Penalty $2,500
Resolve - Class - 1
At time of inspection, a 300 square foot puddle of foul smelling stagnant standing water observed accumulated at rear yard of premises, a 14 story 133 unit occupied multiple dwelling, posing a mosquito breeding
Dec 16, 2022 · Penalty $1,250
Resolve
Show 40 more ↓
- Class - 2
At time of inspection alt observed at exp 1 planter boxes consisting of concrete wall 8 ft height elevated above ground floor not covered and not secured, no hand rail installed at stair case leading to the sha
Jul 27, 2022
Resolve - Class - 1
Failure to take and provide adequate safety measures to protect and secure public safety from documented unsafe facade. the facade technicalreport received on 10/28/19 filed facades unsafe. inadequate safety me
May 17, 2022 · Penalty $10,000
Resolve - Class - 1
Failure to provide adequate safety measures such as sidewalk shed netting etc. where required to protect and secure public safety from documented unsafe facade as per 1rcny-103-04. facade technical report filed
Aug 12, 2021 · Penalty $10,000
Resolve - Class - 1
Failure to provide adequate safety measures such as sidewalk shed netting,etc. where required to protect and secure public safety from documented unsafe facade as per 1rcny-103-04. facade technical report filed
Jul 28, 2021 · Penalty $10,000
Resolve - Class - 1
Failure to provide adequate safety measures(sws netting etc) where required to protect&secure public safety from documented unsafe facade asper 1rcny103-04.facade technical report filed unsafe by pe/ra10/28/19&
Mar 11, 2021 · Penalty $10,000
Resolve - Class - 2
Slight steam leak bottom right rear boiler plate. correct violating condition and submit a certificate of correction
Dec 21, 2020 · Penalty $625
Resolve - Class - 2
Failure to provide approved/accepted construction documents at time ofinspection-structure stability report of existing building. at time ofinspection at an active jobsite alt-1,7-story bldg for flood control i
Dec 3, 2020
Resolve - Class - 2
Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control#800635. remedy: submit acceptable require
Feb 13, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control#800638. remedy: submit acceptable require
Feb 13, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to take provide adequate safety measure such as sidewalk shed,fence,ect.where required to protect and secure public safety from documented unsafe facade,as per 1rcny-103-04.facade technical report file
Dec 12, 2019 · Penalty $10,000
Resolve - Class - 1
Failure to take provide safety measure such as sidewalk shed fence ectwhere require to protect and secure public safety from documented unsafe facade as per 1rcny 103-04.facade technical report file by pe/ra on
Nov 26, 2019 · Penalty $10,000
Resolve - Class - 1
Failure to take provide safety measures such is sidewalk sheds fence etc.where required to protect and secure public safety from documented unsafe facade by pe/ra on 10/17/2019.unsafe facade notification compli
Nov 26, 2019 · Penalty $10,000
Active - Class - 1
Failure to take and provide safety measures such as sidewalk shed fence ect.where required to protect and secure public safety from documented unsafe facade as per 1rcny 103-04.facade technical report file by p
Nov 26, 2019 · Penalty $10,000
Resolve - Class - 1
Failru to take and provide adequate safety measures such as sidewalk shed fence ect.where required to protect and secure public safety from documented unsafe facade as per 1rcny 103-04.facade technical report f
Nov 26, 2019 · Penalty $10,000
Resolve - Class - 1
3301.13.1=site sfatey plan note at the time of inspection fo a 7 story alteration construction site in progress upon request to the superinetdent of site for site sfatey plan none was provided this can create
Nov 13, 2019
Resolve - Class - 1
Failure to take and provide safety measures such as sidewalk sheds fence ect where required to protect and secure public safety from documented unsafe facade as per 1rcny 103-04.facade technical report file uns
Oct 24, 2019 · Penalty $10,000
Resolve - Class - 1
Partial stop work order for suspended scaffold (h1)facade job issued pursuant to 28-207.2 posted at premises. work does not conform to approved construction documents and/or approved amendments failure to insta
Oct 1, 2018 · Penalty $2,500
Resolve - Class - 2
Installation inspection. all equipment is to be inspected once instal lation is completed. note: at time of inspection i observed suspend scaffolds in connection wihtout rigger beams in place and in use at
Oct 1, 2018
Resolve - Class - 1
Failure to designate and/or have site safety manager or site safeyt coordinator present at site as required. note: at time of insepction i observed suspended scaffolds at exp1, 2, 3 4. scaffold being used at ti
Oct 1, 2018
Resolve - Class - 1
Cu97l10; 70z09; 39o02; 73o02; 74o02; 100o02. cease use for first item onl; 97-whole entire device defective on up and down travel. leveling was off as well. repair and email [email protected] for reinsp
Sep 12, 2018
Resolve - Class - 2
Removal of sidewalk shed without approval.note:at the time of inspection building facade was still designated as unsafe.the amended facade report (tr6)800651-8c-a1 revised on 06/22/2018 has not been accepted an
Jun 29, 2018
Active - Class - 2
Removal of sidewalk shed without department approval.note:at time of inspection building facade was still designated as unsafe.the amended facade report(tr6)800646-8c-al revised on 06/22/2018 has not been accep
Jun 29, 2018
Active - Class - 2
Work w/out permit. note: @ time of insp observed sidewalk shed on site. sidewalk shed permit was signed off on date 8/21/2017. sidewalk shed no longer authorized to be on site. rem: obtain all required permits.
Mar 8, 2018
Resolve - Class - 2
Failure to maintain exterior bldg walls and appurtenances. at time of inspection i obsred exp1 west elevation damage mortar joints, missing mortar joints and cracked mortar joints at parapet. exp#3 east elevati
Feb 13, 2018
Resolve - Class - 2
Failure to maintain exterior bldg walls and appurtenances. note: exp 1east elevation i observed spalled and crack brick at several location,eroding mortar joint; exposures #3 west elev. damaged mortar joints.
Feb 13, 2018
Resolve - Class - 1
Failure to take and provide safety measures (sidewalk shed, netting etc) where required to protect and secure public safety from documented unsafe facade as per 1rcny 103-04.*facade technical report file unsa
Jan 3, 2017
Resolve - Class - 1
Failure to provide safety measures such as sidewalk sheds fence etc toprotect public from unsafe conditions as per 1rcny 103-04 and as per notification of unsafe condition complaint #1414909 by ra/pe dated 1/8/
Feb 26, 2016
Resolve - Class - 2
Failure to notify dob prior to installation or removal of suspended scaffold.noted @ time of inspection the dob was not notified prior to the installation of outrigger beams for suspended scaffold on exp1.rem:c
Apr 30, 2015 · Penalty $800
Resolve - Class - 1
3314.6.3 pswo (suspended scaffold)lifelines & suspension ropes shall each be attached to a different point of (anchorage) noted @ time of inspection lifelines & tiebacks are secured to the same achor point on t
Apr 30, 2015 · Penalty $1,600
Resolve - Class - 1
3314.16.4 inspection the equipment setting for corner & angle scaffoldshall be inspected by dob prior to its use additional inspection by the dob shall be required each time the equipment is moved to a differen
Apr 30, 2015 · Penalty $1,600
Resolve - Class - 1
3314.16.4 inspection. the equipment setting for corner & angle scaffold shall be inspected by dob prior to its use.additional inspection by dob shall be required each time the equipment is moved to a different
Apr 30, 2015 · Penalty $1,600
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Jan 5, 2015
Resolve - Class - 1
97x07. 97x- restore to service.
Apr 10, 2010
Resolve - Class - 1
97x07. 97x- restore to service.
Apr 10, 2010
Resolve - Class - 1
45j1.45m7.45j governor sw tripped adjust governor sw 45m governor seal missing calibrate governor in the presence of a nyc inspector 212 566-5542
Feb 22, 2010
Resolve - Class - 2
03b10.39o2.03b toe guard noise up and down travel 39o clean and adjust car top plank switch grenade sw
Feb 2, 2010
Resolve - Class - 1
97x10 97x10 only elevator in bldg out of service thereby creating conditions dangerous to human life repair immediately call dob elevator unit for re-inspection 212 566-5544
Oct 4, 2009
Resolve - Class - 1
97x10 97x10 only elevator in bldg out of service thereby creating conditions dangerous to human life repair immediately call dob elevator unit for re-inspection 212 566-5544
Oct 4, 2009
Resolve - Class - 2
Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings
Nov 21, 2008
Resolve - Class - 2
Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the department of buildings
Nov 21, 2008
Resolve
Complaints
- Unsanitary condition
Mold
Sep 21, 2022 · Apt 9F
Close - Paint/plaster
Wall
Sep 21, 2022 · Apt 9F
Close - Flooring/stairs
Floor
Sep 20, 2022 · Apt 9F
Close - Heat/hot water
Apartment only
Jan 1, 2018 · Apt 3D
Close - Unsanitary condition
Pests
Sep 25, 2014 · Apt 4E
Close - Unsanitary condition
Pests
Aug 22, 2014 · Apt 4E
Close - Unsanitary condition
Pests
Aug 17, 2014 · Apt 4E
Close - Plumbing
Water supply
Oct 2, 2005 · Apt 9A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 1962
- Floors
- 14
- Residential units
- 2,391
- Building area
- 2,948,300 ft²
- Lot area
- 1,206,975 ft²
- Zoning
- R7-2
- Community board
- 103
- Council district
- 2
- Block / lot
- 323 / 1
- Assessed value
- $129,299,850
- Landmark / historic district
- No
Questions about 288 Delancey Street
Who owns 288 Delancey Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.
Does 288 Delancey Street have violations?
Yes. NYC HPD has recorded 4 housing violations at this property.
Is 288 Delancey Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 288 Delancey Street built?
City records list 1962 as the year it was built.
How many apartments are in 288 Delancey Street?
It has 2,391 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.