219 East Broadway
Manhattan, NY 10002BBL 1-00285-0016Map
Owner of record: 201 Clinton St Rltyinc
219 East Broadway is a walk-up apartment building built in 1910 in Manhattan, 10002. It has 10 residential units across 6 floors. The owner of record is 201 Clinton St Rltyinc. HPD has recorded 1 housing violation here, most recently on December 14, 2023. City tax records listed 4 rent-stabilized apartments here in 2024.
- HPD violations
- 1
- DOB violations
- 8
- ECB violations
- 14
- HPD complaints
- 22
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door hinge in the entrance located at apt 7, 5th story, 1st apartment from west at north
Dec 14, 2023 · Apt 7
Closed — Violation dismissed
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 6, 1996
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Mar 6, 1996
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
Jun 9, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 13, 1991
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Feb 13, 1991
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 20, 1989
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Sep 20, 1989
Dob violation - dismissed
ECB violations · 14
- Class - 2
Failure to maintain bldg in a code-compliant manner. exhaust dischargemust be no closer than 10' from bldg openings. observed: exhaust discharges from 1st flr dry cleaners approx 5' and 6' away from 2nd flr
Dec 18, 2009 · Penalty $400
Resolve - Class - 1
Failure to maintain bldg in a code-compliant manner - use of illegal door hardware. observed: at stairwell bulkhead - 2 bulkhead doors w/slide bolts installed, panic bars de-activated. door(s) lead to roof and
Dec 18, 2009 · Penalty $1,000
Resolve - Class - 3
50a.50b.48a.b fulton vt boiler 10hp nb70619 oil 1994 50a loose furnace cement over lay at lower hand hole port sleeves remove cement and install metal sleeves at lower handholes 48a.b.dirty and leaking gauge gl
Aug 26, 2009
Resolve - Class - 1
Unlawfully continued to work while on notice of a swo. noted: stop work order & violation issued on 12.05.08 for supervision or use of rigging equip. w/o riggers license. remedy: comply w/stop work order.
Dec 6, 2008 · Penalty $4,800
Resolve - Class - 1
Supervision or use rigging equipment without a rigger's license. notedinstalled 2 point guarded scaffold w/o rigger's license. remedy: comply w/code.
Dec 5, 2008 · Penalty $4,800
Resolve - Class - 2
Work w/o a permit work expired work permit noted:at time of inspectionposted permit for appl. # 110228904 exp.10-23-08 renew or obtain updated permit & post remedy:obtain permit or restore premises to prior leg
Dec 1, 2008 · Penalty $400
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations noted:at time of inspection at public hallway stair landingto roof window removed plywood to cover window laying on fl of landing
Dec 1, 2008 · Penalty $2,400
Resolve - Non-hazardous
50a,b,18a,b. fulton vt boiler,10hp,nb 70619, 1994.50a-water leakage atat blowdown line outlet.defective primary & secondary blowdown valves.replace both valves.50b-water leakage at water column drain outlet.
Mar 8, 2008 · Penalty $350
Resolve - Non-hazardous
38,48ab,18ab,50.fulton v.t. boiler,10hp,nb70619,oil,1994.38-no fixed fresh air ventilation for enclosed boiler.48ab-dirty/leaking gauge glass.18ab-corroded/leaking lower handholes.50-dislocated seal at flue pip
Aug 18, 2004
Resolve - Non-hazardous
16 18a 48a 49 oil lines to be properly installed and secured and properly buried in cement to avoid injury to them and oil leaks 2 bring.
Jun 12, 2000 · Penalty $180
Resolve
Show 4 more ↓
- Non-hazardous
Second in water column drain to install gage glass drain pipe to extend down hand hold gasket to replace.
Nov 13, 1998
Resolve - Non-hazardous
Workw tihout a permits work noted. installed canves awning on ground floor. approx. 3 feet high by 3 ft. wide-25 feet long- wording shoe repair noted. broken glass on top of awning creating hazardous conditi
Jul 7, 1993 · Penalty $350
Resolve - Non-hazardous
Work without a permit. dated 061890 note: bn-9451/88 rescinded pur- suant note. location pizza shack- creating a lot-line opening without an easment at store rear. remedy: obtain a permit and approvals or r
Oct 9, 1990 · Penalty $285
Resolve - Non-hazardous
Work without a permit. remedy: obtain a permit.
Feb 7, 1990 · Penalty $125
Resolve
Complaints
- Unsanitary condition
Pests
Jan 3, 2024 · Apt 7
Close - Unsanitary condition
Pests
Jan 3, 2024 · Apt 7
Close - Unsanitary condition
Pests
Dec 7, 2023 · Apt 7
Close - Heat/hot water
Entire building
Nov 6, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2016 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 25, 2014 · Apt 10
Close
Show 12 more ↓
- Heating
Heat related
Oct 27, 2013 · Apt 5
Close - Heating
Heat related
Oct 20, 2006 · Apt 3
Close - Heating
Heat related
Oct 15, 2006 · Apt 3
Close - Electric
Electric-supply
Jul 8, 2004 · Apt 10
Close - Heating
Radiator
Jan 27, 2004 · Apt 10
Close - Plumbing
Basin/sink
Jan 27, 2004 · Apt 10
Close - Heating
Radiator
Jan 27, 2004 · Apt 10
Close - Heating
Radiator
Jan 27, 2004 · Apt 10
Close - General
Cooking gas
Jan 27, 2004 · Apt 10
Close - Appliance
Electric/gas range
Jan 27, 2004 · Apt 10
Close - General
Floor
Jan 27, 2004 · Apt 10
Close - Plumbing
Water-leaks
May 3, 2003 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1910
- Floors
- 6
- Residential units
- 10
- Building area
- 10,129 ft²
- Lot area
- 2,115 ft²
- Zoning
- R7-2
- Community board
- 103
- Council district
- 1
- Block / lot
- 285 / 16
- Assessed value
- $994,050
- Landmark / historic district
- No
HPD registration #106568, last renewed Jun 25, 2026.
Questions about 219 East Broadway
Who owns 219 East Broadway?
The owner of record in NYC Department of City Planning PLUTO data is 201 Clinton St Rltyinc.
Does 219 East Broadway have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 219 East Broadway rent stabilized?
NYC Department of Finance tax bills listed 4 rent-stabilized units here in 2024 (about 40% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 219 East Broadway built?
City records list 1910 as the year it was built.
How many apartments are in 219 East Broadway?
It has 10 residential units and 15 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.