23 Catherine Street
Manhattan, NY 10038BBL 1-00280-0055Map
Owner of record: 21-23 Catherine St Cc LLC
23 Catherine Street is a walk-up apartment building built in 1900 in Manhattan, 10038. It has 15 residential units across 6 floors. The owner of record is 21-23 Catherine St Cc LLC. HPD has recorded 204 housing violations here, most recently on September 27, 2026. 44 of the 50 most recent violations are still open. City tax records listed 5 rent-stabilized apartments here in 2023.
- HPD violations
- 204
- DOB violations
- 6
- ECB violations
- 3
- HPD complaints
- 144
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 204
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Sep 27, 2026 · Apt 3B
Open — Notice of issuance sent to tenant - ANon-hazardous
Repair the broken or defective connection wasteline pipe at sink in the kitchen located at apt 3b, 3rd story, 1st apartment from east at south
Sep 27, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3b, 3rd story, 1st apartment from east at south
Sep 27, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Sep 27, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Sep 27, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mechanical lock at mail box at south for apt 2c at public hall, 1st story
Jan 28, 2026
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of expose electrical wire at celling at public hall, 1st story
Jan 28, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2c, 2nd story, 1st apartment from south at west
Jan 28, 2026 · Apt 2C
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
Jan 28, 2026 · Apt 2C
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
Jan 28, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Jan 24, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Jan 24, 2026 · Apt 3A
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6b, 6th story, 1st apartment from north at east
May 1, 2025 · Apt 6B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6b, 6th story, 1st apartment from north at east
May 1, 2025 · Apt 6B
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of garbage at public hall, 1st story
May 1, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the bathroom located at apt 5a, 5th story, 1st apartment from north at east
Oct 6, 2024 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective metal ceiling in the kitchen located at apt 5a, 5th story, 1st apartment from north at east
Oct 6, 2024 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 5a, 5th story, 1st apartment from north at east
Oct 6, 2024 · Apt 5A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 5a, 5th story, 1st apartment from north at east
Oct 6, 2024 · Apt 5A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 5a, 5th story, 1st apartment from north at east
Oct 6, 2024 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallway located at apt 5a, 5th story, 1st apartment from north at east
Oct 6, 2024 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 1st room from east at north located at apt 5a, 5th story, 1st apartment from north at east
Oct 6, 2024 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance at upper window sash at east wall in the 1st room from east at north located at apt 5a, 5th story, 1st apartment from north at east
Oct 6, 2024 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5a, 5th story, 1st apartment from north at east
Oct 6, 2024 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 5a, 5th story, 1st apartment from north at east
Oct 6, 2024 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at north located at apt 5a, 5th story, 1st apartment from north at east
Oct 6, 2024 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5a, 5th story, 1st apartment from north at east
Oct 6, 2024 · Apt 5A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at roof bulkhead ceiling at public hall
Sep 25, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at roof bulkhead ceiling at public hall
Sep 25, 2024
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak ceiling at roof bulkhead at public hall
Sep 25, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at roof bulkhead door at public hall
Sep 25, 2024
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 3rd room from east at south located at apt 6a, 6th story, 1st apartment from north at east
Sep 25, 2024 · Apt 6A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 3rd room from east at south located at apt 6a, 6th story, 1st apartment from north at east
Sep 25, 2024 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 3rd room from east at north located at apt 6a, 6th story, 1st apartment from north at east
Sep 25, 2024 · Apt 6A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling and east wall in the 3rd room from east at north located at apt 6a, 6th story, 1st apartment from north at east
Sep 25, 2024 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 6a, 6th story, 1st apartment from north at east
Sep 25, 2024 · Apt 6A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 2nd room from east located at apt 6a, 6th story, 1st apartment from north at east
Sep 25, 2024 · Apt 6A
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... at ceiling 4 (sq ft), east wall 4 (sq ft), south wall 4 (sq ft) in the bathroom located at apt 6a, 5th story, 1st apartment from north at east original violation 16920300 issued 23-apr-24 has been upgraded to class c per administrative code §27-2017.3a(5)(a) or (b).
Apr 23, 2024 · Apt 6A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective frame at bulkhead door
Apr 23, 2024
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the 1st room from east at south located at apt 6a, 5th story, 1st apartment from north at east
Apr 23, 2024 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 6a, 5th story, 1st apartment from north at east
Apr 23, 2024 · Apt 6A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the 1st room from east at north located at apt 6a, 5th story, 1st apartment from north at east
Apr 23, 2024 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at north located at apt 6a, 5th story, 1st apartment from north at east
Apr 23, 2024 · Apt 6A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the 2nd room from east at north located at apt 6a, 5th story, 1st apartment from north at east
Apr 23, 2024 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at north located at apt 6a, 5th story, 1st apartment from north at east
Apr 23, 2024 · Apt 6A
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling 4 (sq ft), east wall 4 (sq ft), south wall 4 (sq ft) in the bathroom located at apt 6a, 5th story, 1st apartment from north at east
Apr 23, 2024 · Apt 6A
Closed — Violation closed
DOB building violations · 6
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Electric signs none
Es-electric signs none
Mar 21, 1990
Dob violation - dismissed
ECB violations · 3
- Class - 2
Failure to maintain bldg in code complaint manner. noted: in cellar level observed the metal chimney of water heater tank is disrepair & has many holes. the smoke & emission leakes into boiler room.
Mar 28, 2018 · Penalty $310
Resolve - Class - 3
Work w/o a permit. noted: in apt#2a observed drop ceiling installed in living room w/o permit. drop ceiling dim approx 11'l x 11'w 100% of work done w/o permit. remedy: obtain permit or restore premises to prio
Mar 28, 2018 · Penalty $250
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations.noted: renovation of apartment under permit #122559506-02- ew-ot alteration type 2 expires 12/06/2016 during renovation of apt5c
Dec 9, 2015 · Penalty $1,200
Resolve
Complaints
- Unsanitary condition
Pests
Sep 17, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Sep 17, 2026 · Apt 3B
Close - Appliance
Refrigerator
Sep 17, 2026 · Apt 3B
Close - Plumbing
Basin/sink
Sep 17, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Sep 17, 2026 · Apt 3B
Close - General
Cooking gas
Sep 17, 2026 · Apt 3B
Close - Safety
Smoke detector
Sep 17, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Aug 19, 2026 · Apt 3B
Close - Appliance
Electric/gas range
Aug 18, 2026 · Apt 3B
Close - Safety
Smoke detector
Aug 18, 2026 · Apt 3B
Close
Show 40 more ↓
- General
Ventilation system
Aug 18, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Aug 18, 2026 · Apt 3B
Close - Plumbing
Basin/sink
Aug 18, 2026 · Apt 3B
Close - Safety
Carbon monoxide detector
Aug 18, 2026 · Apt 3B
Close - Heat/hot water
Apartment only
Aug 18, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Aug 18, 2026 · Apt 3B
Close - Unsanitary condition
Garbage/recycling storage
Aug 18, 2026 · Apt 3B
Close - Paint/plaster
Wall
Aug 18, 2026 · Apt 3B
Close - Electric
Power outage
Jan 27, 2026 · Apt 2C
Close - Plumbing
Water supply
Jan 27, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Jan 22, 2026 · Apt 4A
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 21, 2025 · Apt 6B
Close - Heat/hot water
Apartment only
Dec 19, 2025 · Apt 6B
Close - Heat/hot water
Apartment only
Dec 11, 2025 · Apt 2C
Close - Plumbing
Water supply
Dec 11, 2025 · Apt 2C
Close - Heat/hot water
Entire building
Dec 11, 2025 · Apt 2C
Close - Unsanitary condition
Pests
Apr 8, 2025 · Apt 6B
Close - Door/window
Door
Apr 8, 2025 · Apt 6B
Close - Door/window
Door
Apr 5, 2025 · Apt 5C
Close - Heat/hot water
Entire building
Feb 18, 2025 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Feb 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2025 · Apt BLDG
Close - Electric
No lighting
Dec 23, 2024 · Apt BLDG
Close - Paint/plaster
Wall
Sep 26, 2024 · Apt 5A
Close - Plumbing
Basin/sink
Sep 26, 2024 · Apt 5A
Close - Plumbing
Basin/sink
Sep 26, 2024 · Apt 5A
Close - Paint/plaster
Ceiling
Sep 26, 2024 · Apt 5A
Close - Plumbing
Radiator
Sep 26, 2024 · Apt 5A
Close - Plumbing
Bathtub/shower
Sep 26, 2024 · Apt 5A
Close - Plumbing
Bathtub/shower
Jul 7, 2024 · Apt 6A
Close - Plumbing
Water supply
Jul 7, 2024 · Apt 6A
Close - Plumbing
Bathtub/shower
Jun 28, 2024 · Apt 6A
Close - Unsanitary condition
Mold
Apr 4, 2024 · Apt 6A
Close - Unsanitary condition
Sewage
Apr 4, 2024 · Apt 6A
Close - Paint/plaster
Wall
Apr 4, 2024 · Apt 6A
Close - Plumbing
Water supply
Apr 4, 2024 · Apt 6A
Close - Paint/plaster
Ceiling
Apr 4, 2024 · Apt 6A
Close - Paint/plaster
Ceiling
Apr 4, 2024 · Apt 6A
Close - Water leak
Slow leak
Apr 4, 2024 · Apt 6A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1900
- Floors
- 6
- Residential units
- 15
- Building area
- 12,383 ft²
- Lot area
- 2,420 ft²
- Zoning
- R7-2
- Community board
- 103
- Council district
- 1
- Block / lot
- 280 / 55
- Assessed value
- $1,413,000
- Landmark / historic district
- No
HPD registration #107897, last renewed Jun 2, 2026.
Questions about 23 Catherine Street
Who owns 23 Catherine Street?
The owner of record in NYC Department of City Planning PLUTO data is 21-23 Catherine St Cc LLC.
Does 23 Catherine Street have violations?
Yes. NYC HPD has recorded 204 housing violations at this property.
Is 23 Catherine Street rent stabilized?
NYC Department of Finance tax bills listed 5 rent-stabilized units here in 2023 (about 33% of its 15 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 23 Catherine Street built?
City records list 1900 as the year it was built.
How many apartments are in 23 Catherine Street?
It has 15 residential units and 17 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.