33 Henry Street
Manhattan, NY 10002BBL 1-00280-0006Map
Owner of record: 33 Henry Street Cc LLC
33 Henry Street is a walk-up apartment building built in 1900 in Manhattan, 10002. It has 18 residential units across 5 floors. The owner of record is 33 Henry Street Cc LLC. HPD has recorded 169 housing violations here, most recently on August 25, 2026. 23 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 169
- DOB violations
- 7
- ECB violations
- 15
- HPD complaints
- 97
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 169
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Aug 25, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Aug 25, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Repair leaky water closet flush pipe connection in the bathroom located at apt 14, 4th story, 1st apartment from north at east
Jun 21, 2026 · Apt 14
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 14, 4th story, 1st apartment from north at east
Jun 21, 2026 · Apt 14
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 14, 4th story, 1st apartment from north at east
Jun 21, 2026 · Apt 14
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the bathroom located at apt 3, 2nd story, 2nd apartment from north at east
Mar 16, 2026 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3, 2nd story, 2nd apartment from north at east
Mar 16, 2026 · Apt 3
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3, 2nd story, 2nd apartment from north at east
Mar 16, 2026 · Apt 3
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mechanical air vent at ceiling in the bathroom located at apt 3, 2nd story, 2nd apartment from north at east
Mar 16, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3, 2nd story, 2nd apartment from north at east
Mar 16, 2026 · Apt 3
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3, 2nd story, 2nd apartment from north at east
Mar 16, 2026 · Apt 3
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the kitchen located at apt 3, 2nd story, 2nd apartment from north at east
Mar 16, 2026 · Apt 3
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3, 2nd story, 2nd apartment from north at east
Mar 16, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3, 2nd story, 2nd apartment from north at east
Mar 16, 2026 · Apt 3
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the bathroom located at apt 3, 2nd story, 2nd apartment from north at east original violation 18714394 issued 16-mar-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Mar 16, 2026 · Apt 3
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the kitchen located at apt 3, 2nd story, 2nd apartment from north at east original violation 18714400 issued 16-mar-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Mar 16, 2026 · Apt 3
Open — Notice of issuance sent to tenant - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following . , 1st story
Feb 18, 2026
Open — Nov sent out - BHazardous
Provide adequate lighting at hallway at public hall, 2nd story
Nov 12, 2025
Open — Nov sent out - BHazardous
Provide adequate lighting for at building entrance , 1st story
Nov 12, 2025
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules ,defective in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Oct 24, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Oct 24, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at south fire door to recycling room at public hall, 1st story
Jul 6, 2024
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of garbage and cardboard boxes at public hall, 1st story
Jul 6, 2024
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of key operated lock at door leadind to fire escape window in the 1st room from north located at apt 14, 4th story, 1st apartment from north at east
Jun 10, 2024 · Apt 14
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 16, 5th story, 2nd apartment from south at west
Jun 3, 2024 · Apt 16
Closed — Violation dismissed - BHazardous
Replace with new the missing upper escutcheon plate at riser pipe in the 2nd room from north located at apt 2, 1st story, 1st apartment from north at east
Jun 3, 2024 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door to roof
Jun 3, 2024
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 16, 5th story, 2nd apartment from south at west
Jun 3, 2024 · Apt 16
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 16, 5th story, 2nd apartment from south at west
Jun 3, 2024 · Apt 16
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all story, all balconies, all steps and drop ladder at south building front at fire escape
Sep 12, 2023
Closed — Violation closed - ANon-hazardous
Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided., 1st story
Sep 12, 2023
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 12, 2023
Closed — Violation closed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the boxes, garbage bags, house hold items, compactor closet , 1st story
Sep 12, 2023
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the compactor closet , 1st story
Sep 12, 2023
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at public hall, 1st story
Sep 12, 2023
Closed — Violation dismissed - ANon-hazardous
Provide place within the building for the storage of waste receptacles and disinfect same regularly.
Sep 12, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 1st story
Sep 7, 2023
Open — Not complied with - BHazardous
Trace and repair the source and abate the visible mold condition... 10 sq ft of mold ceiling at public hall, 1st story original violation 16213176 issued 07-sep-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Sep 7, 2023
Open — Defect letter issued - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling at public hall, 1st story
Sep 7, 2023
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective fire retardent material ceiling at public hall, 1st story
Sep 7, 2023
Open — Not complied with - ANon-hazardous
Trace and repair the source and abate the visible mold condition... 10 sq ft of mold ceiling at public hall, 1st story
Sep 7, 2023
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water temperature exceeding 130 degrees in the entire apartment located at apt 14, 4th story, 1st apartment from north at east
Sep 7, 2023 · Apt 14
Open — Not complied with - BHazardous
Refit entrance door in the 3rd room from north located at apt 2, 1st story, 1st apartment from north at east
Aug 22, 2023 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the kitchen located at apt 2, 1st story, 1st apartment from north at east
Aug 22, 2023 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2, 1st story, 1st apartment from north at east
Aug 22, 2023 · Apt 2
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 2, 1st story, 1st apartment from north at east
Aug 22, 2023 · Apt 2
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Aug 22, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Aug 22, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge broken, in the entrance located at apt 10, 3rd story, 1st apartment from west at north
Jun 7, 2023 · Apt 10
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts, all components at all stories stack at east, building front at fire escape
Jun 7, 2023
Closed — Violation closed
DOB building violations · 7
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 27, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 27, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 15, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 21, 2021
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed
ECB violations · 15
- Class - 2
Failure to comply with the commissioners order contained in summons/violation#35587067h issued on 9/15/21 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.no c/of/o on file.remedy:c
Nov 6, 2021
Resolve - Class - 2
Failure to safeguard public and property:note at time of inspection ofa 5 story building under facade work,i observed active work on site with construction debris falling down from sidewalk shed unto pedestrian
Oct 29, 2021
Resolve - Class - 2
Bc330763-failure to extend sidewalk shed as required.noted:at time of inspection i observed sidewalk shed installed not extended with 5 feetminimum extention required i observed catch all does not cover full he
Oct 29, 2021 · Penalty $1,250
Active - Class - 1
Bc3307649-obstruciton of egress.note:at time of inspection of a 5 story building under facade work.i observed sidewalk shed installed at expo#1 with the vertical post and horizontal cross braces blocking the ba
Oct 29, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to maintain building in code compliant manner at time of inspection noted:exposure#1 facade numerous locations with masonry window sills in state of disrepair with cracked and/of missing masonry sidewal
Oct 26, 2021
Resolve - Class - 1
Failure to maintain building in code compliant manner.note:at exp #1 front facade at 3rd and 4th floor window sills in disrepair with spalling concrete on most windows.remedy:repair and/or replace.
Sep 15, 2021
Resolve - Class - 1
Failure to maintain building in code compliant manner.noted at exp1 masonry window sills have damaged and/or missing masonry throughout facade.remedy:comply with code.
Jul 29, 2021
Resolve - Class - 1
Failure to maintain building in code compliant manner. noted:at time of my inspection i observed:at exposure#1 at the 3 and 4 fl facade windows sills is broken w/ pieces of stone missing,vio#35557787z issued on
Jul 28, 2021
Resolve - Class - 1
Failure to maintain building in code compliant manner third ave foruth floors facade windows sills pieces of stone at exposure #1 maintain building as per code provide repairs
Jun 16, 2021 · Penalty $3,125
Active - Class - 1
Failure to maintain building in a code-compliant manner. at time of inspection, observed damaged/cracked, missing pieces of the stone sills around the windows of the facade at exposure #1. damaged facade non co
Mar 26, 2021 · Penalty $1,250
Active
Show 5 more ↓
- Class - 1
Failure to maintain bldg in code compliant manner. lack of a system of automatic sprinklers where required per bc 903.2;27-954 for transient use. remedy: discontinue illegal occupancy.
Mar 19, 2018 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. failure to provide # of required means of egress for every floor per bc 1021.1;bc1018.1;27-366 for transient use. remedy: discontinue illegal occupancy.
Mar 19, 2018 · Penalty $2,500
Resolve - Class - 1
Sec. 907.2.8 failure to provide fire alarm system for transient use. remedy: discontinue illegal occupancy.
Mar 19, 2018 · Penalty $2,500
Resolve - Class - 2
Permanent dwelling used/converted for other that permament residentialpurposes. dob records indicates that bldg to be legally occupied as a class'a'm.d. now pat#3 illegally &/converted to transient use.
Mar 19, 2018 · Penalty $1,250
Resolve - Non-hazardous
Occupancy contrary to that allowed by building department records- in that the south store has been converted into a social club for women contrary to records- lawful use is store. remedy: discontinue illegal
Apr 28, 2006 · Penalty $400
Resolve
Complaints
- Water leak
Slow leak
Aug 25, 2026 · Apt 1
Close - Water leak
Heavy flow
Aug 25, 2026 · Apt 5
Close - Plumbing
Toilet
Jul 10, 2026 · Apt 14
Close - Plumbing
Toilet
Jun 19, 2026 · Apt 14
Close - Plumbing
Toilet
Jun 19, 2026 · Apt 14
Close - General
Bell/buzzer/intercom
Mar 27, 2026 · Apt 4
Close - Plumbing
Toilet
Jan 21, 2026 · Apt 14
Close - Unsanitary condition
Mold
Dec 14, 2025 · Apt 3
Close - Water leak
Heavy flow
Dec 14, 2025 · Apt 3
Close - Plumbing
Bathtub/shower
Dec 14, 2025 · Apt 3
Close
Show 40 more ↓
- Water leak
Slow leak
Nov 25, 2025 · Apt 3
Close - Unsanitary condition
Mold
Nov 25, 2025 · Apt 3
Close - Heat/hot water
Entire building
Nov 10, 2025 · Apt 3
Close - Heat/hot water
Apartment only
Oct 23, 2025 · Apt 1
Close - Heat/hot water
Entire building
Jan 27, 2025 · Apt 4
Close - Heat/hot water
Apartment only
Jan 22, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Jan 21, 2025 · Apt 4
Close - Heat/hot water
Apartment only
Jan 16, 2025 · Apt 4
Close - Appliance
Refrigerator
Dec 5, 2024 · Apt 4
Close - Door/window
Door
Dec 5, 2024 · Apt 4
Close - Heat/hot water
Apartment only
Dec 3, 2024 · Apt 4
Close - Unsanitary condition
Pests
Nov 30, 2023 · Apt 13
Close - Heat/hot water
Apartment only
Nov 30, 2023 · Apt 13
Close - Heat/hot water
Entire building
Nov 30, 2023 · Apt 13
Close - Heat/hot water
Entire building
Nov 29, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2023 · Apt 13
Close - Heat/hot water
Entire building
Nov 29, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 28, 2023 · Apt 13
Close - Heat/hot water
Entire building
Nov 28, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 26, 2023 · Apt 13
Close - Heat/hot water
Apartment only
Nov 26, 2023 · Apt 13
Close - Heat/hot water
Entire building
Nov 26, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 25, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Nov 13, 2023 · Apt 13
Close - Heat/hot water
Apartment only
Sep 9, 2023 · Apt 1
Close - Heat/hot water
Apartment only
Sep 7, 2023 · Apt 1
Close - Heat/hot water
Apartment only
Sep 7, 2023 · Apt 1
Close - Heat/hot water
Entire building
Sep 6, 2023 · Apt BLDG
Close - Door/window
Door
Sep 5, 2023 · Apt 10
Close - Water leak
Slow leak
Sep 5, 2023 · Apt 10
Close - Unsanitary condition
Mold
Sep 5, 2023 · Apt 10
Close - Electric
Lighting
Aug 17, 2023 · Apt 2
Close - Flooring/stairs
Floor
Aug 17, 2023 · Apt 2
Close - Water leak
Slow leak
Aug 17, 2023 · Apt 2
Close - Unsanitary condition
Mold
Aug 14, 2023 · Apt 10
Close - Water leak
Heavy flow
Aug 3, 2023 · Apt 2
Close - Water leak
Slow leak
Jul 17, 2023 · Apt 2
Close - Flooring/stairs
Floor
Jul 17, 2023 · Apt 2
Close - Flooring/stairs
Floor
Jul 10, 2023 · Apt 2
Close - Water leak
Slow leak
Jul 10, 2023 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1900
- Floors
- 5
- Residential units
- 18
- Building area
- 8,360 ft²
- Lot area
- 2,188 ft²
- Zoning
- R7-2
- Community board
- 103
- Council district
- 1
- Block / lot
- 280 / 6
- Assessed value
- $824,400
- Landmark / historic district
- No
HPD registration #118959, last renewed Jan 28, 2026.
Questions about 33 Henry Street
Who owns 33 Henry Street?
The owner of record in NYC Department of City Planning PLUTO data is 33 Henry Street Cc LLC.
Does 33 Henry Street have violations?
Yes. NYC HPD has recorded 169 housing violations at this property.
Is 33 Henry Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 33% of its 18 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 33 Henry Street built?
City records list 1900 as the year it was built.
How many apartments are in 33 Henry Street?
It has 18 residential units and 21 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.