225 Cherry Street
Manhattan, NY 10002BBL 1-00248-7501Map
Owner of record: Cps Fee Company LLC
225 Cherry Street is a condominium built in 2015 in Manhattan, 10002. It has 1,021 residential units across 72 floors. The owner of record is Cps Fee Company LLC. HPD has recorded 507 housing violations here, most recently on October 5, 2026. 41 of the 50 most recent violations are still open. City tax records listed 205 rent-stabilized apartments here in 2024.
- HPD violations
- 507
- DOB violations
- 47
- ECB violations
- 65
- HPD complaints
- 761
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 507
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at compactor closet door at public hall, 4th story
Oct 5, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall at public hall, 10th story
Oct 5, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north and south walls at public hall, 10th story
Oct 3, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 7g, 7th story, 4th apartment from east at south
Oct 3, 2026 · Apt 7G
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 7g, 7th story, 4th apartment from east at south
Oct 3, 2026 · Apt 7G
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 7g, 7th story, 4th apartment from east at south
Oct 3, 2026 · Apt 7G
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective rubber gasket at upper and lower fridge in the kitchen located at apt 5s, 5th story, 4th apartment from west at north
Oct 3, 2026 · Apt 5S
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building front entrance door , 1st story
Sep 30, 2026
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling and north wall in the bathroom located at apt 14a, 14th story, 9th apartment from south at west
Sep 30, 2026 · Apt 14A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east wall at bathtub in the bathroom located at apt 6j, 6th story, 2nd apartment from south at west
Sep 30, 2026 · Apt 6J
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6j, 6th story, 2nd apartment from south at west
Sep 30, 2026 · Apt 6J
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the private hallway located at apt 4f, 4th story, 6th apartment from east at south
Sep 30, 2026 · Apt 4F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4f, 4th story, 6th apartment from east at south
Sep 30, 2026 · Apt 4F
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective entrance door in the bathroom located at apt 4f, 4th story, 6th apartment from east at south
Sep 30, 2026 · Apt 4F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4f, 4th story, 6th apartment from east at south
Sep 30, 2026 · Apt 4F
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls in the 2nd room from east located at apt 4f, 4th story, 6th apartment from east at south
Sep 30, 2026 · Apt 4F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 4f, 4th story, 6th apartment from east at south
Sep 30, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 1st room from east located at apt 4f, 4th story, 6th apartment from east at south
Sep 30, 2026 · Apt 4F
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper chute door at compactor closet, 8th story
Sep 23, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet door at public hall, 4th story
Sep 23, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department mail room ceiling at public hall, 1st story
Sep 23, 2026
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at mail room ceiling at public hall, 1st story
Sep 23, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at janitor closet door at public hall, 3rd story
Sep 23, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door ''c'' to public hall stair at public hall, 6th story
Sep 23, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges and latch set at fire door ''c'' to public hall stair at public hall, 7th story
Sep 23, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door ''c'' to public hall stair at public hall, 5th story
Sep 23, 2026
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 11t, 11th story, 3rd apartment from north at east
Sep 10, 2026 · Apt 11T
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective device in the entire apartment located at apt 11t, 11th story, 3rd apartment from north at east
Sep 10, 2026 · Apt 11T
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective device in the entire apartment located at apt 11t, 11th story, 3rd apartment from north at east
Sep 10, 2026 · Apt 11T
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 11t, 11th story, 3rd apartment from north at east
Sep 10, 2026 · Apt 11T
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective bell buzzer intrecom system from the building entrance door to the apartment east wall panel in the entrance located at apt 10w, 10th story, 11th apartment from south at west
Sep 8, 2026 · Apt 10W
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of ticks, mites and fleas in the entire apartment located at apt 10w, 10th story, 11th apartment from south at west
Sep 8, 2026 · Apt 10W
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing devices in the entire apartment located at apt 10w, 10th story, 11th apartment from south at west
Sep 8, 2026 · Apt 10W
Open — Not complied with - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing devices in the entire apartment located at apt 10w, 10th story, 11th apartment from south at west
Sep 8, 2026 · Apt 10W
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4f, 4th story, 6th apartment from east at south
Sep 3, 2026 · Apt 4F
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4f, 4th story, 6th apartment from east at south
Sep 3, 2026 · Apt 4F
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4f, 4th story, 6th apartment from east at south
Sep 3, 2026 · Apt 4F
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4r, 4th story, 5th apartment from west at north
Aug 24, 2026 · Apt 4R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4f, 4th story, 5th apartment from south at west
Aug 23, 2026 · Apt 4F
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in waste drain line at bathtub in the bathroom located at apt 4f, 4th story, 5th apartment from south at west
Aug 23, 2026 · Apt 4F
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4f, 4th story, 5th apartment from south at west
Aug 23, 2026 · Apt 4F
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Aug 23, 2026
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and east wall at public hall, 7th story
Aug 7, 2026
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and east wall at public hall, 7th story
Aug 7, 2026
Open — Not complied with - ANon-hazardous
Refit the door at entrance in the 3rd room from north located at apt 8f, 8th story, 5th apartment from south at west
Aug 7, 2026 · Apt 8F
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective michanical drain stopper at wash/basin in the bathroom located at apt 6j, 6th story, 2nd apartment from south at west
Aug 7, 2026 · Apt 6J
Open — Not complied with - ANon-hazardous
Properly repair or replace the broken or defective michanical drain stopper at bathtub in the bathroom located at apt 6j, 6th story, 2nd apartment from south at west
Aug 7, 2026 · Apt 6J
Open — Not complied with - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 6j, 6th story, 2nd apartment from south at west
Aug 7, 2026 · Apt 6J
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 6j, 6th story, 2nd apartment from south at west
Aug 7, 2026 · Apt 6J
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at door in the entrance located at apt 4f, 4th story, 5th apartment from south at west
Aug 7, 2026 · Apt 4F
Closed — Violation closed
DOB building violations · 47
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 16, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 21, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 3, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 3, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active
Show 37 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 2020
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 4, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 26, 2018
Vp*-violation unserved ecb- dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 28, 2016
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Sep 28, 2016
Vp*-violation unserved ecb- dismissed
ECB violations · 65
- Class - 2
Vf... hoist machine brake maintenance tag update missing provide.. 8.6.4.6... maintenance log update missing provide... 8.6.1.4...
Aug 28, 2026 · Penalty $625
Active - Class - 2
Class 2 item: car door gibs are worn and do not properly guide the door within its track. door is not maintained in proper condition, in violation of asme a17.1-2013 2.14.1.2, 2.14.1.4
Jul 29, 2026 · Penalty $625
Active - Class - 2
Class 2 items: access to elevator machine room was not provided at time of inspection, preventing inspection and access to elevator equipment, in violation of asme a17.1-2013 2.7.3 and 8.6.1.2.1, and nyc admini
Jul 17, 2026 · Penalty $625
Active - Class - 1
Observed large glass panel at exposure 1 in disrepair with stress crack running from top to bottom of glass panel., maintain exterior building wall
Jan 9, 2026 · Penalty $7,500
Resolve - Class - 1
Failure to maintain building wall(s) or appurtenances. at time of inspection, exposure 1 main entrance window is in a state of disrepair with a broken piece of glass. remedy: maintain exterior building wall.
Jul 9, 2025 · Penalty $5,000
Resolve - Class - 2
Permanent dwelling used/converted for other than permanent residentialpurposes. dob records indicate premises to be legally approved as a class "a" multiple dwelling. at time of inspection noted apartment 18m i
Jun 11, 2024 · Penalty $1,250
Resolve - Class - 2
Permanent dwelling used/converted for other than permanent residentialpurposes. dob records indicates premises to be legally approved as a class "a" multiple dwelling. at time of inspection, noted apartment 40b
Jun 11, 2024 · Penalty $1,250
Resolve - Class - 1
Bc907.2.8. failure to provide the required class "j" fire alarm systemfor transient use at apts. #18m and 403. remedy: discontinue illegal occupancy.
Jun 11, 2024
Resolve - Class - 1
Cease use/ class 1 elevator is under repair by kone elevator co. provide to restore to service.
Jan 25, 2024 · Penalty $625
Resolve - Class - 1
Failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection, the device is found to be out of service, creating a hazardous condition per 1rcny 11
Dec 7, 2023 · Penalty $1,563
Resolve
Show 40 more ↓
- Class - 1
The elevator is out of service . up on inspection the device is found out of service, repair and restore to service immediately .
Nov 24, 2023 · Penalty $625
Resolve - Class - 1
Failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection, the device is found to be out of service, creating a hazardous condition per 1rcny 11
Sep 22, 2023
Resolve - Class - 2
Class 2, recurrent condition,97/x/17 restore to service for proper inspection by dob.
Aug 18, 2023
Resolve - Class - 2
Elevator out of service; restore to service
Jul 26, 2023
Resolve - Class - 2
59bb15, 78e14: brake maintenance tag expired (59-bb-15) tension weightin pit rubbing (78-e-14)
Feb 12, 2020
Resolve - Class - 2
Work does not conform to approved const. docs and / or approved amendments. observed large recreational structure approx 20' w x 20' l x 20' h ( including staircase ) erected on 3rd floor outdoor area, steel ba
Dec 31, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to safeguard public & property. in response to complaint#1530335 where it was reported by site safety manager school bus hit manlift stored at grade level storage area. site inspection revealed boomlift
Dec 11, 2019
Resolve - Class - 1
Failure to notify the dept of an incident that resulted in a fatality or an injury. a worker was injured while delivering matewrials,he was transported to a hospital by ems. as per the dept records,the permit
Aug 24, 2019
Resolve - Class - 2
16m7.16m7-hoistway seperated screen missing provide
Apr 26, 2019
Resolve - Class - 2
Failure to safeguaurd all persons and property affected by construction operations.in response to an incident (#1501804)that took place at approximately 1:45pm in which a worker was carrying lumber out of th ej
Feb 14, 2019
Resolve - Class - 1
Failure to maintained & institute safe operations. @ time of insp of the incident that occupied where a worker was struck by a falling piece of metal approx 2x4 inches when the metal was grinded off by a iron w
Jul 26, 2018
Resolve - Class - 1
26i10cu; 26x10cu. 26i10- repair exit cover; 26x10-remove the jumper form the switch.
Jul 20, 2018 · Penalty $312
Resolve - Class - 1
No hot works permit/work w/o permit at the time of my inspection of new bldg under construction bldg at the roof top/bulkhead level. i observed worker at the 46th fl cutting a piece of metal w/a grinder produci
May 24, 2018
Resolve - Class - 1
Sec. 3303.7.2 no fire extinguisher. at the time of my inspection it was observed an active construction site w/72 sty new bldg where it was noted grinding operations at 46th fl-where no fire extinguisher was
May 24, 2018 · Penalty $625
Resolve - Class - 1
Sec. 3301.2 failure to comply w/fire code. no fire watch. at the time of my inspection it was observed an active construction site of 72 sty new bldg where it wad noted grinding operations at 46 sty next to ele
May 24, 2018
Resolve - Class - 1
Sec: bc 3301.1.2. failure to comply w/ nyc fire code. @ time of insp of new bldg under construction bldg @ rooftop/bulkhead level, observed worker @ the 46 flr cutting a piece of metal w/ a grinder producing sp
May 24, 2018 · Penalty $625
Resolve - Class - 1
Sec. 3301.3 manufacturer specifications. at the time of my inspection it was observed an active construction site-new bldg w/72 sty in construction-where it was noted metal grinder in use by contractor w/o guar
May 24, 2018
Resolve - Class - 2
Viewing panels. at the time of my inspection of new bldg under construction-bldg at the roof top/bulkhead level,i observed that the jobsite fence located along jobsite perimeter at exp#3 has 0/no viewing panels
May 24, 2018
Resolve - Class - 2
Sec. 3303.7.2 fire extinguishers at the time of my inspection of new bldg under construction bldg at roof top/bulkhead level. i observed fire extinguishers on the ground,not properly mounted at several floors &
May 7, 2018
Resolve - Class - 1
No controlled access zone. at the time of my inspection of new bldg under construction bldg at roof top/bulkhead level i observed 2 workers on scissor lift performing overhead work(above 8'). no controlled acce
May 7, 2018
Resolve - Class - 2
Sec. 3301.1.3 manufacturer specifications/misuse equipment. at the time of my inspection of new bldg under construction-bldg at roof top/bulkhead level. i observed fire extinguishers on the ground being used to
May 7, 2018
Resolve - Class - 1
Sec. 3303.9 no exit signs at the time of my inspection of new bldg under construction-bldg at rooftop/bulkhead level,i observed at all floors from roof level to 17th floor. no exit signs in place in hallways.
May 7, 2018
Resolve - Class - 2
Trip hazard(housekeeping) at the time of my inspection of new bldg under construction work at the roof top/bulkhead level. i observed at various locations throughout bldg extension cords on the ground in hallwa
May 7, 2018 · Penalty $625
Resolve - Class - 2
97r07. illegal operation of elevator. 1p50026 operating with an expired certificate of compliance.
Apr 20, 2018 · Penalty $310
Resolve - Class - 2
Failure to maintain construction equipment.at time of inspection whileinspecting hoist load cable noticed a difficiency in cable called cork(severing).this defficiency was running along the wire rope for
Feb 9, 2018 · Penalty $800
Resolve - Class - 1
Failure to maintain construction equipment at time of inspection whileinspections hoist load cable, noticed a deficiency in cable called cork screwing. this deficiency was running along the wire rope for abo
Feb 9, 2018
Resolve - Class - 2
Posting of unlawul signs,noticed at time of inspection nb in progress noticed unlawful signs advertising condo lease/sale on shed parapet and on job site fence a picture banner.rem:remove unlawful signs
Feb 8, 2018
Resolve - Class - 1
Failure to provide unobstructed egress pathway. noticed at time of inspection nb in progress. noticed on floors 30 and 56 egress hallway paths blocked on 30 tools and sheetrock leave less then a foot to pass on
Feb 8, 2018
Resolve - Class - 2
Operation of a crane without a certificate of onsite inspection. i observed the following violating condition during my inspection on the 20th of december, pinnacle industries ii, llc was in violation of bc 331
Dec 20, 2017 · Penalty $2,400
Resolve - Class - 2
Posting of unlawful signs on fence and shed parapet.noticed at time ofinspection nb in progress noticed on parpet of shed around entire job unlawful sign advertising amenitys for condo sales,as well as afterwrk
Oct 19, 2017
Resolve - Class - 2
Bc3301.2/holes not covered.noticed at time of inspection nb in progress noticed on floors 50,52,53,60 & 62 holes not covered.holes large in size from 4 inch to more than 10 inches.rem:cover all holes as per cod
Oct 19, 2017 · Penalty $400
Resolve - Class - 1
Inadequate safety measures:use/operation of crane cd3757 cn57215 in anunsafe manner.respondent above failed to safeguard all persons & property affected by construction operations-faa approved warning lights sy
Jun 20, 2017 · Penalty $10,000
Resolve - Class - 1
3301.1.1 responsibility for safety unsafe construction methods noted at the time of inspectionof 72 story building erected to the 40th fl hoist work in progress at 39th floor carpenters with plywood for hoist
Apr 10, 2017
Resolve - Class - 1
Failure to safeuard all persons and property affected by construction operations.note:at time of inspectiion of 72 story building erected to the 39th fl. hoist workers were cutting plywood on hoist ramp when
Apr 10, 2017
Resolve - Class - 1
Bc3301.1.3 manufacturer specifications.note:at time of my inspection of a 72 story bldg at 20th flr, construction work in progress. i observed workers using embedded anchorage system for perimeter work and to
Oct 4, 2016 · Penalty $400
Resolve - Class - 1
Work does not conform to approved construction documents &/or amendments: shaft platforms noted: at time of inspeciton observed multiple shaft platforms floors 18-20 that had large amount of material placed on
Sep 28, 2016 · Penalty $250
Resolve - Class - 2
Failure to maintain: housekeeping. noted: at time of inspection of 72 sty bldg erected to 21 fl. observed scattered debris at floors 18-20. debris all over shaft platforms,egress paths,close to edge.
Sep 28, 2016
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. note: at time of insp of 72 sty bldg erected to the 21 fl. a 5ft long piece of rebar fell from 19 fl to 3rd fl set back on top of
Sep 28, 2016
Resolve - Class - 1
Unlawfully continued work while on notice of a swo. note: @ time of insp of a 72 story bldg @ 8th flr level, constr work in progress. i observed shoes install for cocoon system installation was removed. researc
Jul 22, 2016
Resolve - Class - 1
Failure to institute/maintain saftey equipment measures or temporary construction(guardrails/v-n)note:@the time of my inspection of a 72 stry bldg @8th flr level,construction work in progress.i observed that th
Jul 20, 2016 · Penalty $1,200
Resolve
Complaints
- General
Bell/buzzer/intercom
Oct 5, 2026 · Apt 11K
Open - Plumbing
Toilet
Oct 5, 2026 · Apt 11K
Open - Unsanitary condition
Pests
Oct 4, 2026 · Apt 10THFL
Close - Paint/plaster
Ceiling
Oct 4, 2026 · Apt 10THFL
Close - Door/window
Door
Oct 4, 2026 · Apt 12T
Open - Plumbing
Basin/sink
Oct 4, 2026 · Apt 12T
Open - Paint/plaster
Ceiling
Oct 4, 2026 · Apt 10THFL
Close - Paint/plaster
Wall
Oct 4, 2026 · Apt 10THFL
Close - Water leak
Damp spot
Oct 4, 2026 · Apt LOBBY
Open - Water leak
Slow leak
Oct 4, 2026 · Apt LOBBY
Open
Show 40 more ↓
- Water leak
Damp spot
Oct 4, 2026 · Apt LOBBY
Open - Water leak
Slow leak
Oct 4, 2026 · Apt LOBBY
Open - General
Signage missing
Oct 2, 2026 · Apt BLDG
Open - Unsanitary condition
Pests
Oct 2, 2026 · Apt 10THFL
Close - Elevator
Maintenance
Oct 2, 2026 · Apt 10THFL
Close - Paint/plaster
Ceiling
Oct 2, 2026 · Apt 10THFL
Close - Paint/plaster
Wall
Oct 2, 2026 · Apt 10THFL
Close - Water leak
Slow leak
Sep 28, 2026 · Apt LOBBYM
Open - Water leak
Slow leak
Sep 28, 2026 · Apt LOBBY
Close - Unsanitary condition
Garbage/recycling storage
Sep 26, 2026 · Apt BLDG
Close - Flooring/stairs
Floor
Sep 26, 2026 · Apt 4F
Close - Plumbing
Basin/sink
Sep 26, 2026 · Apt 4F
Close - Appliance
Refrigerator
Sep 26, 2026 · Apt 4F
Close - Appliance
Electric/gas range
Sep 26, 2026 · Apt 4F
Close - Electric
Wiring
Sep 26, 2026 · Apt 4F
Close - Unsanitary condition
Pests
Sep 26, 2026 · Apt 4F
Close - General
Cabinet
Sep 26, 2026 · Apt 4F
Close - Door/window
Door
Sep 26, 2026 · Apt 4F
Close - Unsanitary condition
Mold
Sep 26, 2026 · Apt 4F
Close - Unsanitary condition
Pests
Sep 26, 2026 · Apt 4F
Close - Flooring/stairs
Floor
Sep 26, 2026 · Apt 4F
Close - Paint/plaster
Wall
Sep 26, 2026 · Apt 4F
Close - Unsanitary condition
Pests
Sep 25, 2026 · Apt 7G
Close - Flooring/stairs
Floor
Sep 17, 2026 · Apt 4F
Close - Water leak
Damp spot
Sep 17, 2026 · Apt 4F
Close - Plumbing
Basin/sink
Sep 17, 2026 · Apt 4F
Close - Electric
Wiring
Sep 17, 2026 · Apt 4F
Close - Door/window
Door
Sep 17, 2026 · Apt 4F
Close - Flooring/stairs
Floor
Sep 17, 2026 · Apt 4F
Close - Paint/plaster
Wall
Sep 17, 2026 · Apt 4F
Close - Unsanitary condition
Mold
Sep 17, 2026 · Apt 4F
Close - Unsanitary condition
Pests
Sep 17, 2026 · Apt 4F
Close - Unsanitary condition
Pests
Sep 17, 2026 · Apt 4F
Close - Paint/plaster
Wall
Sep 17, 2026 · Apt 4F
Close - Appliance
Refrigerator
Sep 17, 2026 · Apt 4F
Close - Paint/plaster
Ceiling
Sep 17, 2026 · Apt 4F
Close - General
Cabinet
Sep 17, 2026 · Apt 4F
Close - Appliance
Electric/gas range
Sep 17, 2026 · Apt 4F
Close - Appliance
Refrigerator
Sep 16, 2026 · Apt 5S
Close - Appliance
Electric/gas range
Sep 6, 2026 · Apt 10W
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2015
- Floors
- 72
- Residential units
- 1,021
- Building area
- 1,099,034 ft²
- Lot area
- 94,619 ft²
- Zoning
- C6-4
- Community board
- 103
- Council district
- 1
- Block / lot
- 248 / 7501
- Assessed value
- $244,288,394
- Landmark / historic district
- No
HPD registration #144763, last renewed Jul 17, 2026.
Questions about 225 Cherry Street
Who owns 225 Cherry Street?
The owner of record in NYC Department of City Planning PLUTO data is Cps Fee Company LLC.
Does 225 Cherry Street have violations?
Yes. NYC HPD has recorded 507 housing violations at this property.
Is 225 Cherry Street rent stabilized?
NYC Department of Finance tax bills listed 205 rent-stabilized units here in 2024 (about 20% of its 1,021 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 225 Cherry Street built?
City records list 2015 as the year it was built.
How many apartments are in 225 Cherry Street?
It has 1,021 residential units and 1,023 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.