60 Lispenard Street
Manhattan, NY 10013BBL 1-00194-0032Map
Owner of record: 60-62 Lispenard LLC
60 Lispenard Street is an elevator apartment building built in 1895 in Manhattan, 10013. It has 7 residential units across 7 floors. The owner of record is 60-62 Lispenard LLC. HPD has recorded 1 housing violation here, most recently on April 29, 2026. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 1
- DOB violations
- 39
- ECB violations
- 17
- HPD complaints
- 19
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed
DOB building violations · 39
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 7, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 8, 2016
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed
Show 29 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Oct 17, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 26, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 19, 2008
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 30, 2006
Dob violation - resolved - Elevator elevatorrequired
1p19947
Jun 21, 2000
Dob violation - resolved - Elevator elevatorrequired
1p19947
Jan 12, 1999
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 6, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 1996
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 1994
Vp*-violation unserved ecb- dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed - Elevator elevatoroptional
2
Jun 28, 1993
Dob violation - dismissed - Facade facade optional
Ll1080-local law 10/80 - facade facade optional
Jul 1, 1992
Dob violation - dismissed - Elevator elevatoroptional
1
Apr 7, 1992
Dob violation - dismissed - Elevator elevatoroptional
2
Jun 29, 1990
Dob violation - dismissed - Construction other optional
C-construction other optional
May 2, 1989
Dob violation - dismissed - Construction other optional
C-construction other optional
May 2, 1989
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 20, 1989
Dob violation - dismissed - Elevator elevatorrequired
(07)provide proper clearance for sheave in pit (51)provide faciad plate below hoistway door saddle on main floor
Dec 14, 1988
Dob violation - resolved - Elevator elevatorrequired
(51)restore elevtor to proper operation jor file building notice and obtain permit to dismantle or remove complete
Dec 14, 1988
Dob violation - resolved
ECB violations · 17
- Class - 1
Failure to maintain exterior building facade and appurtenances.at south elevation,exposure#3 observed broken weldings at fire escape step landing between 6th & 7th floors.also observed at this exposure damaged
Sep 29, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to comply with nyc fire code.at south elevation,exposure#3 obseved defected fire escape step and broken weldings at landing between 6th & 7th floors also observed no fire guard were provided.rem:comply
Sep 29, 2021 · Penalty $2,500
Resolve - Class - 1
Cease use items : both (double sided doors) door zone restrictors have been tampered with/ disabled and rendered inoperative. this is a safety device to ensure passengers' safety. repair restrictor and contact
Apr 5, 2021
Resolve - Class - 2
Failure to submit an acceptable required cycle 8a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control#800430. agg1 prior nov 37010208z under 28
Apr 1, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to maintain building wall (s) and appurtenances. observed disrepair & cracks in masonry wall around the door and window at 1st floor & cellar level at expo # 03. also observed metal lintel deteriorated
Jun 26, 2019
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/ violation #35356014x issued on 10/3/18 and to file a certificate of correction pursuant ot 28-201.1 and 1rcny 102-01.no cofc on file. rmdy:
Nov 19, 2018
Resolve - Class - 1
Failure to provide unobstructed exit passageway.noted:premises 7-story semi-attached occupied masonry.frame sprinkler building.at the time of inspection.i observed 2-guys working on rear yard fire escape.replac
Oct 3, 2018
Resolve - Class - 1
Work without a permit.noted:premises 7-story semi-attached masonry frame sprinkler building at the time of inspection i observed fire escape metal treads replacement work in progress 3rd to 4th floor level at r
Oct 3, 2018
Resolve - Class - 2
Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #800430. rmdy: submit required technical report.
May 18, 2018 · Penalty $1,280
Resolve - Class - 2
Failureto post or properly post permits for equipment @premises.note:@time of insp observed supported scaffold in conjuction w/sidewalk shedin place w/no permit posted in any conspicous place @work or the use &
Jan 9, 2018 · Penalty $800
Resolve
Show 7 more ↓
- Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 and the dob rules and regulations
Nov 21, 2008 · Penalty $800
Resolve - Hazardous
Stop work order issued no.384 licensed rigger failed to name a designated foreman. no designated foreman id. remedy: obtain id. for workers
Apr 18, 2008 · Penalty $500
Resolve - Non-hazardous
84m7/66z13/41s9/40i10/38l10/16b1/83b1/39m7 84)provide toe guard on basement side of car platform 66)remove water-seal leak 41)remove non fire retardanielment 40)repair door hardwork repair car top inspection.
Feb 2, 2005
Resolve - Non-hazardous
13m07,14m07,30p07,37g11,57p07,74##.13-provie.14-provide.30-provide.37-jumper on fuse.57-provide.74-restore communication in car.
May 17, 2001
Resolve - Non-hazardous
35p,15c,15l,47l,57z,74l,18l,74al 74)repair the skylight in the overhead 74a)repair car switch
May 16, 1991 · Penalty $1,000
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/84 certifyingto the installation of required fire protection sysetems. remedy-file report
Jan 28, 1991 · Penalty $500
Resolve - Non-hazardous
Occupancy contrary to that allowed by the c of o. remedy: discontinue illegal use at once.
Mar 15, 1990 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Apartment only
Nov 16, 2021 · Apt 7TH
Close - Heat/hot water
Entire building
Oct 2, 2021 · Apt BLDG
Close - Plumbing
Toilet
Apr 26, 2021 · Apt 4F
Close - Heat/hot water
Apartment only
Dec 6, 2020 · Apt 7FL
Close - Heat/hot water
Apartment only
Dec 3, 2020 · Apt 7
Close - Heat/hot water
Entire building
Apr 3, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 3, 2020 · Apt 7THFL
Close - Water leak
Heavy flow
May 29, 2019 · Apt 7FL
Close - Electric
Lighting
May 29, 2019 · Apt 7FL
Close - Paint/plaster
Ceiling
May 29, 2019 · Apt 7FL
Close
Show 9 more ↓
- Heating
Heat related
Jan 8, 2013 · Apt 7
Close - Heating
Heat related
Nov 2, 2011 · Apt 6
Close - Heating
Heat related
Oct 30, 2010 · Apt 4R
Close - Heating
Heat related
Dec 5, 2009 · Apt 7FL
Close - Heating
Heat related
Dec 4, 2009 · Apt 4R
Close - Heating
Heat related
Dec 4, 2009 · Apt 3F
Close - Heating
Heat related
Nov 13, 2009 · Apt 4R
Close - Heating
Heat related
Apr 12, 2009 · Apt 4R
Close - Heating
Heat related
Apr 3, 2009 · Apt 4R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 1895
- Floors
- 7
- Residential units
- 7
- Building area
- 29,158 ft²
- Lot area
- 4,420 ft²
- Zoning
- C6-2A
- Community board
- 101
- Council district
- 1
- Block / lot
- 194 / 32
- Assessed value
- $13,118,850
- Landmark / historic district
- Tribeca East Historic District
HPD registration #142416, last renewed Sep 3, 2025.
Questions about 60 Lispenard Street
Who owns 60 Lispenard Street?
The owner of record in NYC Department of City Planning PLUTO data is 60-62 Lispenard LLC.
Does 60 Lispenard Street have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 60 Lispenard Street rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 29% of its 7 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 60 Lispenard Street built?
City records list 1895 as the year it was built.
How many apartments are in 60 Lispenard Street?
It has 7 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.