29 Broadway
Manhattan, NY 10006BBL 1-00020-0001Map
Owner of record: Trinity Morris Corp
29 Broadway is an office building built in 1925 in Manhattan, 10006. The owner of record is Trinity Morris Corp. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 156
- ECB violations
- 37
- HPD complaints
- 69
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 156
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2022
Apr 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 21, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 21, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 21, 2021
Dob violation - resolved
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jan 21, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 21, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 21, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 21, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 21, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 21, 2021
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Sprinkler none
Failed to file final sprinkler report by july 1, 2019
Sep 3, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 16, 2019
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
Vio issued to elevator-fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - resolved - Elevator elevatorrequired
Vio issued to elevator-fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - resolved - Elevator elevatorrequired
Vio issued to elevator-fail to vorrect defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
Vio issued to elevator-fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 26, 2018
Dob violation - active - Elevator elevatorrequired
Vio issued to elevator-fail to correct deffects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
Vio issued to elevator-fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
Vio issued to elevator-fail to correct deffects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator elevatorrequired
Vio issued to elevator-fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - resolved - Elevator elevatorrequired
Vio issued to elevator-fail to correct deffects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
Vio issued to elevator-fail to correct deffects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
Vio issued to elevator-fail to correct deffects on 2016 cat 1 insp/tst
Jan 26, 2017
Dob violation - active - Elevator elevatorrequired
Vio issued to elevator-fail to correct deffects on 2016 cat 1 insp/tst
Jan 26, 2017
Dob violation - active - Elevator elevatorrequired
Vio issued to elevator-fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2017
Dob violation - resolved - Elevator elevatorrequired
Vio issued to elevator-fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2017
Dob violation - resolved - Elevator elevatorrequired
Vio issued to elevator-fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 25, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 25, 2016
Dob violation - resolved
ECB violations · 37
- Class - 2
Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#90059.rem:submit acceptable required te
Apr 11, 2024 · Penalty $1,250
Active - Class - 1
Work does not conform to approved construction documents and/or approved amendments.at time of inspection observed following contrary conditions to approved cds-steel angle tiebacks,anchorage not installed as p
Jul 3, 2021 · Penalty $625
Resolve - Class - 2
Failure to provide approved plans at site.at time of inspection on an active jobsite of a 31stry bldg observed facade work in progress.upon request for approved architectural plans contractor was unable to prov
Sep 24, 2020 · Penalty $312
Resolve - Class - 2
Failure to safeguard all person and property affected by cosntruction operations note at time of my inspection of a 31 storys buidling udner facade repair in response to an incident reported by s.s.m that rail
Jun 16, 2020
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
Mar 20, 2020 · Penalty $3,125
Resolve - Class - 1
42/m/5 car door monitor missing perform and file for testing.
Jan 15, 2020 · Penalty $1,250
Resolve - Class - 2
27-929.1 a.c. 27-929.1,failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office buildin
Nov 15, 2019
Resolve - Class - 1
Sec. nfpa-14.7.3.1. sprinkler/standpipe system - inadequate installation inspector witnessed standpipe fire hose cabinet installed inside the basement ladies room, as per job #120811416. which creates visual
Jul 3, 2012 · Penalty $1,000
Resolve - Class - 2
Work does not conform to approved const documents & or approved amendments @ the time of my inspection existing bldg have 31 sty approx 12 worker on site repairing facade i observed on the south side of the bld
Aug 24, 2010
Resolve - Class - 1
Sec. 3301.7. design drawing requirements. noted: pipe supported scaffold setup at south side of bldg used for hoisting material - no drawings for this section of scaffolding found presented. remedy: stop all
May 24, 2010 · Penalty $1,600
Resolve
Show 27 more ↓
- Class - 2
Failure to safeguard all persons & property affected by construction operations. upon inspection as noted on alteration site the were cigarette butts on the roof top (31st) in violation of n.y.c. fire code 1404
Jan 27, 2010 · Penalty $400
Resolve - Class - 1
Sec. 28-105.12.8 & 27-201 work not in accordance with site safety plan. noted: on active job site supported pipe scaffold set upon east,west& south sides of building on floors 19,22,26,29, & 31 flrs site safety
Nov 9, 2009
Resolve - Class - 1
Sec. bc 3314.4.3 inspection all scaffolds shall be inspected daily brfore each use by a competent person designated by the trades using the scaffold. noted: at time of inspection asked foreman of side mr jose r
Nov 9, 2009 · Penalty $1,600
Resolve - Non-hazardous
Failure to submit a fifth round technical report: periodic inspection or exterior walls and appurtenances as required by local law 11 of 1998 and the department of buildings rules and regulations. remedy: file
Nov 28, 2003
Resolve - Non-hazardous
Expired permit noted shed along morris street.permit # 103216084-eq-sh,issued=08/12/02'expires 06/23/03.remedy:renew permit
Oct 7, 2003 · Penalty $250
Resolve - Non-hazardous
Having a prohibited sign on sidewalk shed noted shed on morris street side enclosure has nine approx one foot wide xone half foot deep advertising signs for sensivite clothing 211 centre street 212 925 1205
Oct 7, 2003
Resolve - Non-hazardous
60m 60 replace missing counterweight striking plate
Sep 10, 1998
Resolve - Non-hazardous
50i,54t,30o,73o,35o,55m,53b, 50-armature segment 54-provide properly city i.d numbers 73-car top
Feb 9, 1998
Resolve - Non-hazardous
75u02l01l15d 01 & 02 replace wiring to lobby pannel, emergency indicator lights defective 15-loose sight guard on 30th floor.
Jul 8, 1997 · Penalty $200
Resolve - Non-hazardous
75u15d 15-secure loose sight guards where necessary ,
Jul 8, 1997 · Penalty $200
Resolve - Non-hazardous
75u08j15d 15-secure loose sight guards where neccessary
Jul 8, 1997 · Penalty $200
Resolve - Non-hazardous
75u03i10i11q15l15j37i 03-car door jambs damaged 10-cover holes in car station 37-replace damaged wire in selector, wire insulation worn & broken.
Jul 8, 1997 · Penalty $200
Resolve - Non-hazardous
75u57o
Jul 8, 1997 · Penalty $200
Resolve - Non-hazardous
75u08j54u39q 54-install city id# tags on disconnect 39-re-install sheave guards.
Jul 7, 1997 · Penalty $200
Resolve - Non-hazardous
75u08j54u39q01l02l15h 01 & 02-repair wiring to main dispatch pannel in lobby, emerg. indicator light defective 15-repair defective door release roller assembly, 8th fl. 54-provide city id# tags on disconnec
Jul 7, 1997 · Penalty $200
Resolve - Non-hazardous
75u08j54v39q02l01l18q 54-need city id # tags on disconnect 39-re-install sheave guard 01402-repair wire to lobby pannel, emergency indicator lights defective 18-missing interlock cover, 14 floor.
Jul 7, 1997 · Penalty $200
Resolve - Non-hazardous
75u08j54v39q02l18q15l 54-need device #tags on disconnect 39-re-installsheave guard 01 & 02 repair wiring to lobby pannel & emergency indicator lights defective 18-missing interlock cover 5 floor 15-sight guard
Jul 7, 1997 · Penalty $200
Resolve - Non-hazardous
73#,46i,73o, 73.perform 5 year safety test, properly tag device, and file elev. 3 form.
Jun 2, 1992
Resolve - Non-hazardous
73#,73o, 73. perform 5 year safety test, properly tag device and file elev. 3. form.
Jun 2, 1992
Resolve - Non-hazardous
73#,73o, 73.,perform 5 year test properly tag device, and file elv. 3 form.
Jun 2, 1992
Resolve - Non-hazardous
73#,73o,
Jun 2, 1992 · Penalty $100
Resolve - Non-hazardous
73#,73o, (73) perform 5 year safety test, properly tag device & file elv 3 form
May 29, 1992
Resolve - Non-hazardous
73#,73o, (73) perform 5 year safety test, properly tag device & file 3elev-3 form
May 29, 1992
Resolve - Non-hazardous
73x,73#, (73) perform 5 year safety test, properly tag device & file elv3 form
May 29, 1992
Resolve - Non-hazardous
73#,73o, (73)=perform 5 year safety test, properly tag device & file elv3 form
May 29, 1992
Resolve - Non-hazardous
75#,73o,#75+perform 5 year safety test, properly tag device & file elv-3 form
May 29, 1992
Resolve - Non-hazardous
Work without permits at time of inspection electrion work being done on first fl of 29 broadway in rear of card store nre wire in to electrical boxes see photo remedy: stop all work electrical obtain permit and
Feb 21, 1992
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 6, 2026 · Apt E5B
Close - Plumbing
Toilet
Oct 6, 2026 · Apt E5B
Close - Plumbing
Water supply
Jun 21, 2026 · Apt C23G
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 14, 2025 · Apt D32C
Close - Flooring/stairs
Floor
Aug 29, 2025 · Apt D31G
Close - Appliance
Refrigerator
Aug 29, 2025 · Apt D31G
Close - Paint/plaster
Wall
Aug 29, 2025 · Apt D31G
Close - Electric
Lighting
Aug 29, 2025 · Apt D31G
Close - Heat/hot water
Apartment only
Jan 5, 2025 · Apt D25K
Close
Show 40 more ↓
- Water leak
Heavy flow
Feb 10, 2024 · Apt 12J
Close - Unsanitary condition
Mold
Aug 25, 2023 · Apt E12C
Close - Paint/plaster
Wall
Aug 25, 2023 · Apt E12C
Close - Safety
Carbon monoxide detector
Aug 25, 2023 · Apt E12C
Close - Safety
Smoke detector
Aug 25, 2023 · Apt E12C
Close - Unsanitary condition
Pests
Aug 25, 2023 · Apt E12C
Close - Heat/hot water
Apartment only
Dec 28, 2022 · Apt A8H
Close - Unsanitary condition
Mold
Apr 2, 2022 · Apt C172
Close - Heat/hot water
Entire building
Feb 20, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 2, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 22, 2021 · Apt BLDG
Close - Plumbing
Water supply
Jul 22, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 13, 2019 · Apt C16H
Close - Paint/plaster
Ceiling
Dec 3, 2019 · Apt E10K
Close - Unsanitary condition
Mold
Dec 3, 2019 · Apt E10K
Close - Water leak
Damp spot
Dec 3, 2019 · Apt E10K
Close - Heat/hot water
Apartment only
Dec 2, 2019 · Apt D2E
Close - Heat/hot water
Entire building
Dec 2, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 4, 2019 · Apt B17A
Close - Unsanitary condition
Mold
Jul 15, 2019 · Apt C26H
Close - Unsanitary condition
Mold
Jan 18, 2019 · Apt 6G
Close - Unsanitary condition
Mold
Jan 18, 2019 · Apt 6G
Close - Unsanitary condition
Mold
Jan 18, 2019 · Apt 6G
Close - Plumbing
Water supply
Jun 14, 2017 · Apt D31D
Close - Heat/hot water
Apartment only
Jan 28, 2017 · Apt 87A
Close - Heat/hot water
Apartment only
Jan 25, 2017 · Apt D2A
Close - Unsanitary condition
Pests
Sep 26, 2016 · Apt D21D
Close - Paint/plaster
Wall
Sep 26, 2016 · Apt D21D
Close - Paint/plaster
Wall
Sep 26, 2016 · Apt D21D
Close - Water leak
Heavy flow
Sep 26, 2016 · Apt D21D
Close - Unsanitary condition
Mold
Sep 26, 2016 · Apt D21D
Close - Water leak
Heavy flow
Sep 26, 2016 · Apt D21D
Close - Water leak
Slow leak
Jul 24, 2016 · Apt D31D
Close - Water leak
Slow leak
Jul 24, 2016 · Apt D31D
Close - Unsanitary condition
Mold
Jul 24, 2016 · Apt D31D
Close - Water leak
Damp spot
Jul 23, 2016 · Apt D31D
Close - Heat/hot water
Apartment only
Jan 19, 2016 · Apt C26H
Close - Heat/hot water
Entire building
Oct 5, 2015 · Apt BLDG
Close - Plumbing
Water supply
Apr 21, 2015 · Apt D28C
Close - Plumbing
Water supply
Apr 21, 2015 · Apt D28C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O4)
- Year built
- 1925
- Floors
- 31
- Residential units
- —
- Building area
- 316,150 ft²
- Lot area
- 14,490 ft²
- Zoning
- C5-5
- Community board
- 101
- Council district
- 1
- Block / lot
- 20 / 1
- Assessed value
- $16,633,350
- Landmark / historic district
- No
Questions about 29 Broadway
Who owns 29 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Trinity Morris Corp.
Does 29 Broadway have violations?
NYC HPD has no housing violations on record for this property.
Is 29 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 29 Broadway built?
City records list 1925 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.