roofy

25 Broadway

Manhattan, NY 10004BBL 1-00013-0027Map

Owner of record: 25 Broadway Office Properties LLC

25 Broadway is an office building built in 1921 in Manhattan, 10004. The owner of record is 25 Broadway Office Properties LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
304
ECB violations
124
HPD complaints
23

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 304

  • Hazardous condition (facade) facade required

    Cycle 9c unsafe report filed

    Feb 16, 2024

    Dob violation - active
  • Residential elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Dec 17, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 21, 2021

    Dob violation - dismissed
  • Construction other optional

    Emergency work order. take and provide safety measures and repair damaged facade to protect public. remedy: install public protection at exp 3 west elev. and exp 4 north elev. remove any loose unsafe material on facade

    May 3, 2021

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 11, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 11, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 11, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 11, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 11, 2021

    Dob violation - resolved
Show 40 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 11, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 11, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 11, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 11, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 7, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 7, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 7, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 7, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 7, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 8, 2020

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Sprinkler none

    Failed to file final sprinkler report by july 1, 2019

    Sep 3, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 11, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 10, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 10, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 10, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 8, 2019

    Dob violation - resolved
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Mar 26, 2018

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 18, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 17, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 17, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 15, 2018

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 5, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 5, 2017

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed

ECB violations · 124

  • Class - 2

    Failure to file acceptable amended cycle 8c and 9c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #900020. remedy: file acceptable report.

    Apr 20, 2026 · Penalty $1,280

    Active
  • Class - 1

    Tampered with, removed or defaced a written posted stop work order for 39525708k. at time of inspection, noted pwso has been partially torn away and is not readable., comply with code

    Apr 17, 2025

    Resolve
  • Class - 3

    Failure to maintain building in code complaint manner. at time of inspection, noted graffiti on street barrier and building walls with layers posted advertisements along building exposure 1 and 4, debris and du

    Apr 17, 2025

    Resolve
  • Class - 1

    The registered design professional hired by the owner failed to immediately notify the department of unsafe conditions as mandated by ac 28-302.3. through a review of dob compliance filing record tr6-900020-9c-

    Dec 6, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    Atoi, i observed several lifeline parapet clamps installed on some parapet walls. upon request for the required parapet stability wall reports, non was provided. stop the use of all suspended scaffold units wit

    Jun 17, 2024 · Penalty $1,250

    Resolve
  • Class - 1

    Atoi, i observed active suspended scaffold units with not installed to code (tie- is not independent; beam is deflated (no manufacturer's specification); tie-back installed at an angle and missing beam hanger/

    Jun 17, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    Atoi, i observed several tie-back angle iron plates installed on some walls. upon request for the required pull test reports, non was provided. stop the use of all suspended scaffold units with wall tie-back an

    Jun 17, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#800020.remedy:submit acceptable require

    Oct 19, 2022 · Penalty $1,250

    Active
  • Class - 2

    Sec. ac 27-929.1 failure to complete the installation of a full systemof automatic sprinklers & file a final sprinkler report prepared by a registered design professional in an office bldg 100 feet or more in

    Nov 1, 2021

    Resolve
  • Class - 2

    Failure to maintain exterior building facade and appurtenances.note:atthe time of inspection observed.exposure#3 west elevation vertical and stepped cracks on stone masonry facade at multiple locations cracks a

    Jun 10, 2021 · Penalty $1,250

    Active
Show 40 more ↓
  • Class - 1

    Failure to maintain exterior bldg facade or appurtenances.noted:atoi,observed@1)exp1,e elevation(broadway);spalled-eroded stone secs in multiple [email protected])exp4,n elevation(morris st);spalled stone se

    Apr 30, 2021 · Penalty $2,530

    Active
  • Class - 2

    27-929.1 ac27-929.1,failure to complete installation of full system ofautomatic sprinklers&file final sprinkler report prepared by registered design professional in office bldg 100' or more in ht in existence o

    Mar 30, 2021 · Penalty $6,250

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation#35358197r issued on 9/16/20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain build

    Jan 15, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    At time of inspection,observed on going construction activities contrary to mayor's emergency executive order 120 and,subsequent orders incorporating requirements of governors executive order 202.3.4 and subseq

    Jul 28, 2020 · Penalty $5,000

    Resolve
  • Class - 2

    Sec. ac 27-929.1 failure to complete the installation of a full systemof automatic spriklers & file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office bldg 100 feet or

    Jul 13, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    27-929.1 a.c. 27-929.1,failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office buildin

    Nov 15, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/ violation #35248361m issued on 10/26/17 and to file a certificate of correction pursuant to 28.201 and 1rcny 102-01(d)(2).an acceptable

    Jul 6, 2018

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order contained in summons/violation# 35263002x issued on 9/13/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work does not conform to approved plans & docs @

    Nov 9, 2017

    Resolve
  • Class - 1

    Work does not conform to approved plans and docs.at the time of my inspection of tpa#1164/2017 all tpa activities in progress on request for firguards(3)was provided w/fdny cert of fitness.as per tpa plans&docs

    Sep 13, 2017 · Penalty $1,000

    Resolve
  • Class - 1

    Electrical work w/o a permit.the entire 5th fl:sub feeders sub panels branch circuit wiring,receptacles outlets,switches,lighting fixtures."we work"rem:obtain permit:

    Oct 24, 2014 · Penalty $8,000

    Resolve
  • Class - 1

    250.114,equipment connected by cord & plug.under any of the conditionsdescribed in 250.114(1)through exposed non-(currying)metal ports of cord-&-plug-connected equipment likely to become energized shall be conn

    Oct 24, 2014 · Penalty $8,000

    Resolve
  • Class - 2

    Conductors of the same circuit.all conductors of the some circut &,where used,the grounded conductor & wall equipment grounding conductors &bonding conductors shall be contained w/in the some raceay,auxiliary g

    Oct 24, 2014 · Penalty $4,000

    Resolve
  • Class - 2

    33b07,52b07.(33b07)provide a code compliant entry spinner.(52b07)provide a code compliant entry spinners.

    Aug 23, 2012 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 28-116.4.1. 97r07- operating device w/o a c/compliance. no reportof inspection submitted to dob and no witnessing of test by dob. remedy contact dob [email protected] or [email protected] to

    Apr 13, 2012 · Penalty $1,600

    Resolve
  • Class - 1

    97r07- operating device w/o a c/c no report of inspection submitted todob and no witnessing of test by dob. remedy: contact dob [email protected] or [email protected] to schedule test appointment

    Apr 13, 2012 · Penalty $1,600

    Resolve
  • Class - 2

    71l10. 71l10-pit light repair.

    Feb 15, 2012

    Resolve
  • Class - 2

    18m07)provide hoistway door z bracket.

    Aug 3, 2011

    Resolve
  • Class - 2

    18m07)provide hoistway/door z bracket.

    Aug 3, 2011

    Resolve
  • Class - 2

    18m07)provide hoistway door z bracket.

    Aug 3, 2011

    Resolve
  • Class - 2

    18m07)provide hoistway door z bracket.

    Aug 3, 2011

    Resolve
  • Class - 2

    97x10,69m07. 97x10-restore car to service. 69m07- provide code data plate.

    Jun 25, 2011

    Resolve
  • Class - 2

    100-l-07/100-l-07-provide hoist cables spin out device

    Jun 22, 2011

    Resolve
  • Class - 2

    100b11. 100b11- provide proper spin out on hoist cable.

    Jun 18, 2011

    Resolve
  • Class - 2

    100b11. 100b11- provide proper spinout on hoistway cables.

    Jun 18, 2011

    Resolve
  • Class - 1

    Sec. 3313.1 1 storage & use of all volatile flammable & combustible mixtures. compressed gases as noted: at time of inspection at above active construction site observed storage of oxygen & acetylene approx 3

    Feb 15, 2011 · Penalty $1,600

    Resolve
  • Class - 1

    No fdny permit for oxygen and acetylene compressed gases - noted: stipulation of permit has not been complied with - permit states - tanks are not to be stored at site - tanks are to be removed daily - at time

    Jun 7, 2010 · Penalty $1,600

    Resolve
  • Class - 1

    56r09,42r09. 56r09-observed wood scaffold on top of machine to installnew a/c - while the device is still operating - remove scaffolds. cease use, call dob before returning back to service. 212-566-5542.

    Mar 3, 2010 · Penalty $1,000

    Resolve
  • Class - 1

    56r09,42r09. observed wood scaffold on top of machine and controller to install a new a/c while the device is still operating - remove scaffold. cease use call dob before returning back to service 212-566-5542

    Mar 3, 2010 · Penalty $1,000

    Resolve
  • Class - 1

    No record of dail inspection of supported scaffold performed by authorized person at site.note:daily inspection log not available at time ofinspection.

    Dec 31, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Use of supported scaffold without a scaffold user certificate.note:no 4hr. user card for worker injured on supported scaffold.remedy:comply with code obtain supported scaffold user certificate.

    Dec 31, 2009

    Resolve
  • Class - 3

    53k11,16b06.(53/k-replace rusted & undersized governor rope.16/b-properly secure shaft doors on shaftway side 14th & 15th floors.

    Nov 30, 2009

    Resolve
  • Class - 3

    100m7.100m provide ph ii fire service

    Nov 30, 2009

    Resolve
  • Class - 2

    Work does not conform to approved construction documents &/or approvedamendments. (suspended) note: scaffold #3 on exposure #1 contrary to approved c-d5 plans. remedy: conform to approved documents or amendmen

    Oct 23, 2009

    Resolve
  • Class - 2

    Sidewalk shed does not meet bldg code spec's. noted shed at exp.#4 morris st. ismissing handle proof covers,othr are hanging loose & entire street has no lights on.remedy:conform shed to code spec's.

    Sep 30, 2009 · Penalty $2,400

    Resolve
  • Class - 2

    100x10,67x10 100-firemen service phase 1 inoperative; relay pulled off controller

    Feb 11, 2009

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by const operations noted 1 man working on scaffold approx 15high with no fall protection no 4hr users card wheels unlocked and concrete debris on fl that

    Jan 13, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Sec 3307.6.5 misc viol: materials or debris shall not be stored on sidewalk shed. noted there is material & debris in excess strewn along shed roof at exp 4. remedy: comply with code.

    Dec 1, 2008 · Penalty $800

    Resolve
  • Class - 1

    No record of daily inspection of suspended scaffold performed at site remedy: maintain daily inspection records on site.

    Dec 1, 2008

    Resolve
  • Class - 1

    No record of daily inspection of suspended scaffold performed at site remedy: conform to safety regulations.

    Dec 1, 2008

    Resolve
  • Class - 1

    Erected or install supported scaffold 40ft or higher w/o a permit. noted: approx 4 section of scaffold erected am 22 fl set back approx 6ft wide. this makes scaffold measure from sidewalk approx 230 ft high.

    Dec 1, 2008 · Penalty $1,200

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Nov 29, 2025 · Apt 3C

    Close
  • Unsanitary condition

    Pests

    Sep 16, 2021 · Apt 457

    Close
  • Paint/plaster

    Ceiling

    Sep 16, 2021 · Apt 457

    Close
  • Unsanitary condition

    Pests

    Jul 30, 2020 · Apt 312

    Close
  • Heat/hot water

    Entire building

    Nov 27, 2018 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Jul 31, 2014 · Apt 3B

    Close
  • Flooring/stairs

    Floor

    Jul 31, 2014 · Apt 3B

    Close
  • Appliance

    Electric/gas range

    May 21, 2012 · Apt 1D

    Close
  • Appliance

    Refrigerator

    May 21, 2012 · Apt 1D

    Close
  • Heating

    Heat related

    Aug 20, 2008 · Apt 3C

    Close
Show 13 more ↓
  • Electric

    Wiring

    Jul 23, 2007 · Apt A

    Close
  • Plumbing

    Basin/sink

    Jul 23, 2007 · Apt A

    Close
  • General

    Ceramic-tile

    Jul 23, 2007 · Apt A

    Close
  • General

    Mold

    Jul 23, 2007 · Apt A

    Close
  • Paint/plaster

    Wall

    Jul 23, 2007 · Apt A

    Close
  • Paint/plaster

    Wall

    Jul 23, 2007 · Apt A

    Close
  • Electric

    Wiring

    Jul 23, 2007 · Apt A

    Close
  • General

    Doors

    Nov 9, 2005 · Apt 1D

    Close
  • General

    Ceramic-tile

    Nov 9, 2005 · Apt 1D

    Close
  • Plumbing

    Basin/sink

    Nov 9, 2005 · Apt 1D

    Close
  • Paint/plaster

    Wall

    Nov 9, 2005 · Apt 1D

    Close
  • Paint/plaster

    Wall

    Nov 9, 2005 · Apt 1D

    Close
  • Nonconst

    Vermin

    Nov 9, 2005 · Apt 1D

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Office building (O4)
Year built
1921
Floors
23
Residential units
—
Building area
809,401 ft²
Lot area
48,071 ft²
Zoning
C5-5
Community board
101
Council district
1
Block / lot
13 / 27
Assessed value
$72,055,350
Landmark / historic district
INDIVIDUAL AND INTERIOR LANDMARK

Questions about 25 Broadway

Who owns 25 Broadway?

The owner of record in NYC Department of City Planning PLUTO data is 25 Broadway Office Properties LLC.

Does 25 Broadway have violations?

NYC HPD has no housing violations on record for this property.

Is 25 Broadway rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 25 Broadway built?

City records list 1921 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.