50 Trinity Place
Manhattan, NY 10006BBL 1-00019-0024Map
Owner of record: Trinity NYC Hotel, LLC
50 Trinity Place is a hotel built in 2019 in Manhattan, 10006. The owner of record is Trinity NYC Hotel, LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 21
- ECB violations
- 25
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 21
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed
Show 11 more ↓
- Construction other optional
Additional information required. observed at cellar level in mta room concrete slab flooring has been chipped and steel rebar reinforcement exposed. remedy: email to concrete [email protected] within 2 weeks pe approved for chipping in concrete provide struct details, provide method of repair for all exposed rebar. prov calc
Sep 16, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 7, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 7, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 7, 2021
Dob violation - dismissed - Construction other optional
Due to vehicle striking fence and shed. approximately 32 linear feet of shed and fence displaced as a result
Feb 10, 2021
Dob violation - dismissed - Construction other optional
Borough commissioner issued swo to application # 121191995 due to site safety manager aswell as contractor withdraw. stop all work immediately and make site safe.
Jun 19, 2020
Dob violation - dismissed - Construction other optional
Boro-comm
Nov 13, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 7, 2010
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
1p12113
Sep 19, 2002
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 1996
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed
ECB violations · 25
- Class - 1
Failure to safeguard all person&property note:atoi in response to incident where pc of aluminum framing fell from supported scf on 6fl level(aprx)60' in ht landed on pedestrian sw.insps reveal scf wasnt enclose
Feb 7, 2022 · Penalty $10,000
Resolve - Class - 2
At the time of my inspection observed a new building under construction upon going through the inspection i observed a temporary structure.escape hatch on the elevator shaft contrary to tha approved plans on 17
May 3, 2021
Resolve - Class - 1
Bc3308.5-failure to maintain vertical netting (zero cable) note at the time of my inspection at new 29 story building activ jobsite currently at 26 stoyr being framed i observed on numerous floors vertical nett
Apr 14, 2021 · Penalty $2,530
Resolve - Class - 1
Bc3301.2-holes in floor larger than 2.note at the time of my sinepction at new 19 story building active jobsite currently at 26 story i observed throughout jobsite on numerous floors holes.penetrations larger t
Apr 14, 2021
Resolve - Class - 1
Failure to maintain adequate housekeeping note at the time of my inspection at new 29 story building actiev jobsite currently at 26 story i observed on numerous floors throughout jobsite large amounts of constr
Apr 14, 2021 · Penalty $2,500
Resolve - Class - 1
Faiure to comply with manufacturers specifications.note:in response toincident where a worker fell and got injured upom my inspection and what ssm told me worker placed "a"fram ladder at top of stairs at leadin
Apr 14, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to institute and maintain safety measures at the time of my sinepction at new 29 story building active jobsite current 26 story in response to incident i observed at 23rd story in response to incident
Apr 14, 2021 · Penalty $10,000
Resolve - Class - 2
Sec. bc 3307.6.5.8 inspection letter for shed. note: at time of my inspection of a proposed 29 sty's new bldg inder construction active jobsite at 3rd fl level. i observed sidfewalk shed installed at exp#1 of
Sep 28, 2020
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements.at the time of inspection on an nb 29 stories for transient.note i observed a active site with a ssm on site.also observed a cellar 1st and 2nd
Feb 28, 2020 · Penalty $625
Resolve - Class - 1
Failure to display/maintain documents required by chapter 33.at time of inspection on an nb 29 stories building i observed active jobsite with a smm present.upon request a dot permit.none was provided/except ex
Feb 28, 2020 · Penalty $625
Resolve
Show 15 more ↓
- Class - 1
Failure to provide protection at side of excavation.at time of inspection on an active jobsite,i obserevd an excavation pit @exp#2 approx. 12'in depth w/o any sheeting,shoring & bracing.this can create a poten
Jul 17, 2019 · Penalty $5,000
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection defect noted. at time of inspection observe construction wooden fence installed under job#121041586,however construction fence does not con
Mar 14, 2017 · Penalty $400
Resolve - Class - 2
Job site fence not constructed pursuant to subsection. defect noted: the gate installed to the construction fence along rector st is separated from hingers & leaning excessively inwards & creating wide opening
Nov 9, 2013
Resolve - Class - 3
Work w/o a permit. an 8' high plywood construction fence has been erected & maintained on the trinity place and rector st sides of lot. dob records show no permit for this fence. remedy: obtain a fence permit.
Mar 17, 2012
Resolve - Class - 2
Expired permit for temporary construction equipment - fence. noted at time of inspection fence permit #104935714 expired 1.1.10. dept records indicate no renewal obtained. remedy: renew permit.
Oct 24, 2011 · Penalty $800
Resolve - Class - 2
Failure to maintain bldg walls or appurtenanes.noted defect:noted a structure has been completly demolished to grade.site is fenced at trinity pl. & recotor st. demo#104683255.noted fencing at trinity pl. is se
Aug 31, 2011 · Penalty $500
Resolve - Class - 2
Work w/o a permit. expired permit. permit #104935714 for construction fence expired on 1.1.10 8' high fence remains up at vacant lot. remedy: renew permit.
Jan 11, 2010 · Penalty $4,000
Resolve - Class - 2
Fail to post permit for wrk @ premises a 8'high construction fence hasbeen erected & maintained @ north & east sides of lot & no permit for this fence is posted.rem:post permit
Dec 7, 2009
Resolve - Class - 3
Permit not posted.noted:bldg at above location demo to grade site not graded.debris & post of foundation wall on site.no site permits posted.remedy:post permits.
Dec 11, 2008 · Penalty $150
Resolve - Class - 2
Sec 28-05.11 permit not posted. noted: bldg on above address down, part of foundation walls and debris on site. no permit posted. remedy: post permit.
Jul 17, 2008 · Penalty $400
Resolve - Hazardous
27-1034a3. failure to provide weatherproofing. on inspection blue tarpwas provided for weatherproofing at adj property on west side. exterior wall at 89 greenwich st must have permanent protection in place
May 21, 2008
Resolve - Hazardous
Failure to safely remove material in a safe and proper manner from demo site. demo debris has been allowed to accumulate to 10' & exerting pressure on exterior wall near pedestrian travel. remedy: remove
Apr 25, 2008
Resolve - Hazardous
Failure to carry out demolition operation in a safe and proper manner.at demo site skid loader was left on angle of repose braced by free standing wall in front of construction fence w/pedestrian traffic on
Apr 25, 2008
Resolve - Hazardous
Job site fence defective job site fence is inadequately supported by extension cord & missing adequate bracing for 40' of fence. remedy: repair fence immediately.
Apr 25, 2008 · Penalty $500
Resolve - Non-hazardous
No permit for side walk chute erected thru sidewalk shed. 2nd floor for the removed of construction debris. "discontinue use" remedy: obtain permit for wide walk chute.
Jan 31, 2008 · Penalty $200
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (HB)
- Year built
- 2019
- Floors
- 29
- Residential units
- —
- Building area
- 74,373 ft²
- Lot area
- 3,758 ft²
- Zoning
- C5-5
- Community board
- 101
- Council district
- 1
- Block / lot
- 19 / 24
- Assessed value
- $17,525,250
- Landmark / historic district
- No
Questions about 50 Trinity Place
Who owns 50 Trinity Place?
The owner of record in NYC Department of City Planning PLUTO data is Trinity NYC Hotel, LLC.
Does 50 Trinity Place have violations?
NYC HPD has no housing violations on record for this property.
Is 50 Trinity Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 50 Trinity Place built?
City records list 2019 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.