31 Hylan Boulevard
Staten Island, NY 10305BBL 5-02829-7501Map
Owner of record: Oceanview Condominum
31 Hylan Boulevard is a condominium built in 1989 in Staten Island, 10305. It has 60 residential units across 14 floors. The owner of record is Oceanview Condominum. HPD has recorded 36 housing violations here, most recently on June 16, 2025.
- HPD violations
- 36
- DOB violations
- 45
- ECB violations
- 25
- HPD complaints
- 17
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 36
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 16, 2025
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Jun 16, 2025
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 16, 2025
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jun 16, 2025
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 16, 2025
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 16, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at at south wall in the 3rd room from east at south located at apt 12b, 12th story, 2nd apartment from north at east
Mar 14, 2025 · Apt 12B
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 3, 2024
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical cable at ceiling and east wall in the 4th room from north located at apt 12b, 12th story, 2nd apartment from west at north
Oct 29, 2024 · Apt 12B
Closed — Violation closed
Show 26 more ↓
- CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and the east wall in the 4th room from north located at apt 12b, 12th story, 2nd apartment from west at north
Oct 29, 2024 · Apt 12B
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2024
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 2nd bathroom from north located at apt 12b, 12th story, 2nd apartment from west at north
Jan 8, 2024 · Apt 12B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd bathroom from north located at apt 12b, 12th story, 2nd apartment from west at north
Jan 8, 2024 · Apt 12B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north located at apt 12b, 12th story, 2nd apartment from west at north
Jan 8, 2024 · Apt 12B
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the 5th room from north located at apt 12b, 12th story, 1st apartment from west at north
Dec 6, 2023 · Apt 12B
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the 1st bathroom from north located at apt 12b, 12th story, 1st apartment from west at north
Dec 6, 2023 · Apt 12B
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the 2nd bathroom from north located at apt 12b, 12th story, 1st apartment from west at north
Dec 6, 2023 · Apt 12B
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 30, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from east at penthouse located at apt ph, 1st apartment from west at north
Mar 7, 2023 · Apt PH
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over east wall in the 3rd room from east at north in penthouse located at apt ph, 1st apartment from west at north
Mar 7, 2023 · Apt PH
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over the north wall in kitchen at penthouse located at apt ph, 1st apartment from west at north
Mar 7, 2023 · Apt PH
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling and north wall at the public hall stairs exit for the penthouse apartment, at apt ph, 1st apt from west at north
Mar 7, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 7, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 6, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 23, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 23, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 3, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 2, 2015
Closed — Violation dismissed
DOB building violations · 45
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 3, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 3, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 30, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 30, 2018
Dob violation - resolved - Construction other optional
Work without a permit-work noted: dept. records indicate penthouse was enlarged by approx. 1200sq of floor area added towards the east.a sports room & a theater room remedy:obtain a permit or restore premises to prior legal condition
May 9, 2017
Vw-violation work without permit - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 2, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 2, 2017
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 25, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 8, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2016
Dob violation - resolved
Show 35 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 22, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 22, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 22, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 11, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 11, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 15, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 5, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 5, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2013
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 7, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 16, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 16, 2012
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 25, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 25, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 25, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 20, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 20, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 9, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 9, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 4, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 4, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 10, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 19, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 19, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active
ECB violations · 25
- Class - 2
Failure to maintain building exterior walls or appurtenances.note:at the time of inspection observed at expo#1 south elevation crack on top floor level.defective balconies slab at several level of expo#4 east e
May 6, 2024
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons#35538018k issued on 12/11/2020,and failure to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptable certific
Mar 19, 2024 · Penalty $1,250
Active - Class - 2
Class 2: car floor not level to landing sill. adjust car to level at every floor landing. water leak in pit. pump water out of pit & clear drain. replace sump pump if needed.
Mar 1, 2023
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. noted at time of inspection south elevation exposure#1(penthouse) loose/displaced window gaskets on greenhouse glass of penthouse apt. cracked/spa
Dec 11, 2020 · Penalty $1,250
Active - Class - 2
Unapproved/unsafe/unsuitable electrical equiptment apparatus,materials,devices,appliances or wiring in use. observed at side of bldg electrical meter room pan defective & detached from bldg & to be replace with
Apr 6, 2017
Resolve - Class - 2
Failure to submit acceptable 7th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-301.4.remedy:submit required technical report.
Feb 3, 2017
Resolve - Class - 1
Wrk w/out a permit.failure to comply with the commissioners order contained in summons/violation#35163217p issued on 10/28/15 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.extens
Jan 20, 2017
Resolve - Class - 1
Work w/o a permit. noted: bldg dept approved penthouse floor plan dated on 2-24-87 indicates exsting length of penthouse at north is 57ft & easr of bldg is roof. presently illegal extension towards east is made
Oct 28, 2016
Resolve - Class - 2
Failure to maintain exterior bldg west elevation exp#1 2nd flr masonry above entrance is chipped and cracked.vertical cracking over front entrance. east elevation exp#3 6th flr balcony chipped and broken pcs
Nov 13, 2015 · Penalty $1,250
Resolve - Class - 2
Failure to file an acceptable technical report in compliance with codeprovisions: periodic inspection of exterior walls and appurtenances asrequired by article 28.302 and the dob rules and regulations.rmdy:file
Sep 21, 2015 · Penalty $2,000
Resolve
Show 15 more ↓
- Class - 2
Failure to maintain exterior bldg west elevation exp1 2nd fl masonry above entrance is chipped & cracked.vertical cracking over front entrance.east elevation exp3 6th fl balcony chipped & broke pieces of masonr
Aug 28, 2015 · Penalty $500
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
May 19, 2014 · Penalty $4,000
Resolve - Class - 1
Failure to provide protection.no sidewalk shed or other protection below the suspended scaffold. safety of the publc & property not protected from falling material,tools,debris or collapse.scaffold is still han
Dec 6, 2011 · Penalty $4,800
Resolve - Class - 1
Noted at time of insp suspended scaffold was hooked up and hanging at the 14fl on exp#1 work was in progress caulking windows sills from 14 down to 8th over top the main entrance w/ no protection rem: provide s
Oct 19, 2011 · Penalty $2,400
Resolve - Non-hazardous
74b11,35z09,30z09,57z09.74b-fire service repair.
Sep 28, 2000
Resolve - Non-hazardous
60o02,61k#,74d06,57z11, 60-k-02-clean & lube buffers. 61-k-# lube all safety linkage under car.74-d-06-secure alarm bell under car
Oct 24, 1998
Resolve - Non-hazardous
60k02,61k#, 60k02-clean & lube buffers 61-k# lube all safety linkage under car
Oct 24, 1998
Resolve - Non-hazardous
36
Nov 8, 1993 · Penalty $100
Active - Non-hazardous
36
Nov 8, 1993 · Penalty $100
Active - Non-hazardous
36
Nov 8, 1993 · Penalty $100
Active - Non-hazardous
36
Nov 8, 1993 · Penalty $100
Active - Non-hazardous
36
Nov 8, 1993 · Penalty $100
Active - Non-hazardous
36
Nov 8, 1993 · Penalty $100
Active - Non-hazardous
36
Nov 8, 1993 · Penalty $100
Active - Non-hazardous
36
Nov 8, 1993 · Penalty $100
Active
Complaints
- Electric
Power outage
Mar 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 14, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 14, 2025 · Apt BLDG
Close - Safety
Fire escape
Mar 14, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Mar 10, 2025 · Apt 12B
Close - Unsanitary condition
Mold
Mar 10, 2025 · Apt 12B
Close - Electric
Wiring
Oct 7, 2024 · Apt 12B
Close - Water leak
Slow leak
Dec 5, 2023 · Apt 12B
Close - Unsanitary condition
Mold
Dec 5, 2023 · Apt 12B
Close - Water leak
Heavy flow
Feb 28, 2023 · Apt PH
Close
Show 7 more ↓
- Unsanitary condition
Mold
Feb 28, 2023 · Apt PH
Close - Electric
Wiring
Feb 28, 2023 · Apt PH
Close - General
Signage missing
Jan 18, 2023 · Apt BLDG
Close - Water leak
Slow leak
Mar 11, 2017 · Apt 14D
Close - Water leak
Slow leak
Mar 11, 2017 · Apt 14D
Close - Flooring/stairs
Floor
Dec 6, 2016 · Apt 2D
Close - Plumbing
Water-leaks
Dec 8, 2003 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RD)
- Year built
- 1989
- Floors
- 14
- Residential units
- 60
- Building area
- 71,466 ft²
- Lot area
- 38,500 ft²
- Zoning
- R4
- Community board
- 501
- Council district
- 49
- Block / lot
- 2829 / 7501
- Assessed value
- $2,740,456
- Landmark / historic district
- No
HPD registration #501212, last renewed Sep 18, 2025.
Questions about 31 Hylan Boulevard
Who owns 31 Hylan Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Oceanview Condominum.
Does 31 Hylan Boulevard have violations?
Yes. NYC HPD has recorded 36 housing violations at this property.
Is 31 Hylan Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 31 Hylan Boulevard built?
City records list 1989 as the year it was built.
How many apartments are in 31 Hylan Boulevard?
It has 60 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.