82 Brabant Street
Staten Island, NY 10303BBL 5-01246-0050Map
Owner of record: Allinsan LLC
82 Brabant Street is a two-family home built in 1925 in Staten Island, 10303. It has 2 residential units across 2 floors. The owner of record is Allinsan LLC. HPD has recorded 45 housing violations here, most recently on February 13, 2026. 1 of the 45 most recent violations are still open.
- HPD violations
- 45
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 87
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 45
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... at west window sill (less than 10 sq ft) in the 1st room from north located at apt 1, 1st story, 1st apartment from south at west
Feb 13, 2026 · Apt 1
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at west window sill (less than 10 sq ft) in the 1st room from north located at apt 1, 1st story, 1st apartment from south at west original violation 18641944 issued 13-feb-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Feb 13, 2026 · Apt 1
Open — Defect letter issued - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Feb 13, 2026 · Apt 1
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Feb 13, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures no volume in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Feb 13, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures no running cold water supply to 1st sty west 1 apt #1 (break in supply line) due to frozen pipes in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Feb 13, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Feb 13, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 21, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st section from south at west
Jan 21, 2026 · Apt 1
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 26, 2025
Closed — Violation dismissed
Show 35 more ↓
- BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt apt1, 1st story, 1st apartment from south at west
Aug 28, 2025 · Apt APT1
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt apt1, 1st story, 1st apartment from south at west
Aug 28, 2025 · Apt APT1
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Mar 12, 2025 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Mar 12, 2025 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at north wall in the 2nd room from north located at apt 1, 1st story, 1st apartment from south at west
Mar 12, 2025 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood frame around building entrance door
Mar 12, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective 1st marble treads from bottom up at stoop
Mar 12, 2025
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 8, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of hotwater exceeding the maximum temperature of 130 degrees in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 8, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 8, 2025 · Apt 1
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 8, 2025 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Dec 27, 2024 · Apt 1
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Dec 27, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding allowable maximum temperature of 130 degrees in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Dec 27, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Dec 6, 2024 · Apt 1
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Dec 6, 2024 · Apt 1
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 5, 2024
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the 5th room from north located at apt 2, 2nd story, 1st apartment from east at south
Oct 2, 2023 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Oct 2, 2023 · Apt 2
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Oct 2, 2023 · Apt 2
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of expose wires at east and south wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Oct 2, 2023 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Oct 2, 2023 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
May 23, 2023 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
May 23, 2023 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2fl, 2nd story, 1st apartment from east at south
Apr 7, 2023 · Apt 2FL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2fl, 2nd story, 1st apartment from east at south
Apr 7, 2023 · Apt 2FL
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at south wall inside the upper wood cabinet and west wall in the kitchen located at apt 2fl, 2nd story, 1st apartment from east at south
Apr 7, 2023 · Apt 2FL
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). that is defective in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Jan 4, 2023 · Apt 2
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at east and south walls in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jan 4, 2023 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jan 4, 2023 · Apt 2
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures ( no volume ) at sink in the kitchen located at apt 2, 2nd story
May 28, 2010 · Apt 2
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures ( no volume ) at sink in the kitchen located at apt 2, 2nd story
May 28, 2010 · Apt 2
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ( toilet ) in the bathroom located at apt 2, 2nd story
Jul 28, 2008 · Apt 2
Closed — Violation closed - ANon-hazardous
Refit door off top hinge in the 2nd room from north at west located at apt 2, 2nd story
Jul 28, 2008 · Apt 2
Closed — Violation closed - ANon-hazardous
Refit closet-doors of track in the 2nd room from north at west located at apt 2, 2nd story
Jul 28, 2008 · Apt 2
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 3
Work does not conform to approved construction documents/amendments. noted: at cellar area. observed at the time of my insp at right side aroom was created (bed,tv,etc) at rear left side a 2pc bathroom (toilet
Nov 17, 2008 · Penalty $200
Resolve
Complaints
- Electric
Wiring
Sep 6, 2026 · Apt 2
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt 1
Open - Plumbing
Water supply
Feb 9, 2026 · Apt 1
Open - Heat/hot water
Apartment only
Feb 5, 2026 · Apt 1
Close - Door/window
Window frame
Sep 30, 2025 · Apt 1
Close - Unsanitary condition
Pests
Sep 30, 2025 · Apt 1
Close - Paint/plaster
Ceiling
Sep 22, 2025 · Apt 1FLOOR
Close - General
Ventilation system
Sep 22, 2025 · Apt 1FLOOR
Close - Door/window
Window frame
Sep 22, 2025 · Apt 1FLOOR
Close - Unsanitary condition
Mold
Sep 22, 2025 · Apt 1FLOOR
Close
Show 40 more ↓
- Unsanitary condition
Pests
Sep 22, 2025 · Apt 1FLOOR
Close - Unsanitary condition
Pests
Aug 29, 2025 · Apt 1
Close - Plumbing
Bathtub/shower
Aug 29, 2025 · Apt 1
Close - Door/window
Window frame
Aug 29, 2025 · Apt 1
Close - Unsanitary condition
Mold
Aug 14, 2025 · Apt APT1
Close - Unsanitary condition
Pests
Mar 4, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Mar 3, 2025 · Apt 1
Close - Unsanitary condition
Pests
Mar 3, 2025 · Apt 1
Close - Door/window
Window frame
Mar 3, 2025 · Apt 1
Close - Unsanitary condition
Pests
Mar 3, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Jan 10, 2025 · Apt 1STFL
Close - Heat/hot water
Apartment only
Jan 9, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Jan 7, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Dec 23, 2024 · Apt 1
Close - Unsanitary condition
Pests
Dec 4, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Dec 4, 2024 · Apt 1
Close - Paint/plaster
Wall
Sep 1, 2024 · Apt 1
Close - Paint/plaster
Door/frame
Sep 1, 2024 · Apt 1
Close - Flooring/stairs
Floor
Sep 1, 2024 · Apt 1
Close - Plumbing
Basin/sink
Sep 1, 2024 · Apt 1
Close - Unsanitary condition
Pests
Sep 1, 2024 · Apt 1
Close - Unsanitary condition
Pests
Sep 1, 2024 · Apt 1
Close - Flooring/stairs
Floor
Aug 9, 2024 · Apt 1
Close - Unsanitary condition
Pests
Aug 9, 2024 · Apt 1
Close - Paint/plaster
Window/frame
Aug 9, 2024 · Apt 1
Close - Paint/plaster
Door/frame
Aug 9, 2024 · Apt 1
Close - Unsanitary condition
Pests
Aug 9, 2024 · Apt 1
Close - Unsanitary condition
Pests
Aug 9, 2024 · Apt 1
Close - Electric
Power outage
Jun 13, 2024 · Apt 2FL
Close - Flooring/stairs
Floor
Jun 13, 2024 · Apt 2FL
Close - Safety
Carbon monoxide detector
Jun 13, 2024 · Apt 2FL
Close - Electric
Wiring
Jun 13, 2024 · Apt 2FL
Close - Plumbing
Bathtub/shower
Jun 13, 2024 · Apt 2FL
Close - Flooring/stairs
Floor
Jun 13, 2024 · Apt 2FL
Close - Electric
Wiring
Jun 13, 2024 · Apt 2FL
Close - General
Ventilation system
Jun 13, 2024 · Apt 2FL
Close - Appliance
Refrigerator
Jun 13, 2024 · Apt 2FL
Close - Electric
Outlet/switch
Mar 10, 2024 · Apt 1
Close - Plumbing
Basin/sink
Mar 10, 2024 · Apt 1
Close - Water leak
Heavy flow
Sep 26, 2023 · Apt 2
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 4, 2026 | $760,000 | Two family dwellings | 2 |
Building details
- Building type
- Two-family home (B2)
- Year built
- 1925
- Floors
- 2
- Residential units
- 2
- Building area
- 1,656 ft²
- Lot area
- 3,509 ft²
- Zoning
- R3A
- Community board
- 501
- Council district
- 49
- Block / lot
- 1246 / 50
- Assessed value
- $39,060
- Landmark / historic district
- No
HPD registration #17702, last renewed Mar 5, 2026.
Questions about 82 Brabant Street
Who owns 82 Brabant Street?
The owner of record in NYC Department of City Planning PLUTO data is Allinsan LLC.
Does 82 Brabant Street have violations?
Yes. NYC HPD has recorded 45 housing violations at this property.
Is 82 Brabant Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 82 Brabant Street built?
City records list 1925 as the year it was built.
How many apartments are in 82 Brabant Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.