316 Pulaski Avenue
Staten Island, NY 10303BBL 5-01169-0045Map
Owner of record: Grinberg Ventures LLC
316 Pulaski Avenue is a two-family home built in 1901 in Staten Island, 10303. It has 2 residential units across 2 floors. The owner of record is Grinberg Ventures LLC. HPD has recorded 42 housing violations here, most recently on October 3, 2019.
- HPD violations
- 42
- DOB violations
- 3
- ECB violations
- 5
- HPD complaints
- 34
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 42
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Oct 3, 2019 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective concrete floor throughout at cellar
Oct 3, 2019
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood cornice at front of building
Nov 2, 2018
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective concrete floor throughout at cellar
Sep 28, 2017
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective rain leader at north side at building rear
Dec 15, 2016
Closed — Violation closed - ANon-hazardous
Provide a gutter, properly connected to drainage system, for proper drainage at rear roof
Dec 15, 2016
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1stfl, 1st story
Dec 11, 2014 · Apt 1STFL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood and vinyl tiles floor in the kitchen located at apt 1stfl, 1st story
Dec 11, 2014 · Apt 1STFL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 1stfl, 1st story
Dec 11, 2014 · Apt 1STFL
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures '' no volume '' in the entire apartment located at apt 1flr, 1st story
Nov 21, 2014 · Apt 1FLR
Closed — Violation closed
Show 32 more ↓
- CImmediately hazardous
Provide adequate supply of cold water for the fixtures '' no volume '' in the entire apartment located at apt 1flr, 1st story
Nov 21, 2014 · Apt 1FLR
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at north located at apt 1flr, 1st story
Nov 21, 2014 · Apt 1FLR
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and south wall in the 2nd room from east at north located at apt 1flr, 1st story
Nov 21, 2014 · Apt 1FLR
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and north wall in the 1st room from east at south located at apt 1flr, 1st story
Nov 21, 2014 · Apt 1FLR
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... present at ceiling ( approx- 16 sq,ft ) and north wall ( approx- 4 sq.ft ) in the 1st room from east at south located at apt 1flr, 1st story
Nov 21, 2014 · Apt 1FLR
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and north wall in the 1st room from east at south located at apt 1, 1st story
Aug 11, 2014 · Apt 1
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... present at ceiling ( approx- 2 sq,ft ) and north wall ( approx- 2 sq,ft ) in the 1st room from east at south located at apt 1, 1st story
Aug 11, 2014 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the broken or defective inoperative electrical outlets at lower north and east walls in the 1st room from east at south located at apt 1, 1st story
Aug 11, 2014 · Apt 1
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1, 1st story
Aug 11, 2014 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective 6 ft. x 4 ft. collapsing wood landing platform at south stairs leading in to rear yard
Aug 11, 2014
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 1, 1st story
Aug 11, 2014 · Apt 1
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective closet-doors in the 1st room from east at north located at apt 1, 1st story
Aug 11, 2014 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and south wall in the 2nd room from east at north located at apt 1, 1st story
Aug 11, 2014 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at north located at apt 1, 1st story
Aug 11, 2014 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tiles floor in the bathroom located at apt 1, 1st story
Aug 11, 2014 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 1st story
Aug 11, 2014 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood and vinyl tiles floor in the kitchen located at apt 1, 1st story
Aug 11, 2014 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and north wall in the kitchen located at apt 1, 1st story
Aug 11, 2014 · Apt 1
Closed — Violation closed - CImmediately hazardous
Cleanse and disinfect to the satisfaction of this department after removing the accumulation of water/ sewage at front at cellar
May 3, 2012
Closed — Violation closed - CImmediately hazardous
Remove all obstructions and repair all defects in house sewer at front at cellar
May 3, 2012
Closed — Violation closed - CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1fl, 1st story
Dec 19, 2011 · Apt 1FL
Closed — Violation dismissed - CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1f, 1st story
Nov 4, 2011 · Apt 1F
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective metal flue pipes from both gas boilers to chimney at boiler room at cellar
Nov 4, 2011
Closed — Violation closed - BHazardous
Abate the nuisance consisting of evidence of water leak at ceiling in the bathroom located at apt 1, 1st story
Aug 16, 2011 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles floor in the bathroom located at apt 1, 1st story
Aug 16, 2011 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color west and south walls in the bathroom located at apt 1, 1st story
Aug 16, 2011 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood and vinyl tiles floor in the kitchen located at apt 1, 1st story
Aug 16, 2011 · Apt 1
Closed — Violation closed - ANon-hazardous
Repair the broken or defective rain leader at north yard
Aug 16, 2011
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story
Jul 15, 2011 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas-range in the kitchen located at apt 1f, 1st story
Apr 15, 2011 · Apt 1F
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor throughout at cellar
Apr 15, 2011
Closed — Violation closed - BHazardous
Properly repair the broken or defective paving concrete floor throughout at cellar
Apr 15, 2011
Closed — Violation dismissed
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 4, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 4, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 4, 2016
Dob violation - dismissed
ECB violations · 5
- Class - 1
Failure to have new or altered plumbing system tested. re: gas piping at the time of my inspection 11:35am on 2/8/16 at above address i observed installation of new 1"gas piping approx 25'from the house side of
Feb 8, 2016
Resolve - Class - 2
Failure to maintain building in code-compliant manner:service equipment boiler:on my inspection at the above address in the cellar on 2/8/16at 11:40am i observed paint cans,rubbish as in paper,wood,insulation &
Feb 8, 2016
Resolve - Class - 1
Gas being supplied to building w/o inspection and certification by dobat time of inspection 11:35am on 2/8/16 at above address i observed new installed gas piping from house side of meter to back of cellar to
Feb 8, 2016
Resolve - Class - 1
Work w/o permit re:at the time of inspection 11:35am on 2/8/16 at above address i observed in cellar new gas work installed with a new hot water heater installed and new gas fittings.work performed w/o any per
Feb 8, 2016
Resolve - Class - 2
Failure to maintain building in code compliant manner:failure to comply w/the law of drainage system per pc 107.1 27-911:on my inspection atabove address on 2/8/16 at 11:35am i observed in the cellar open waste
Feb 8, 2016
Resolve
Complaints
- Electric
Power outage
Jul 3, 2019 · Apt 2
Close - Paint/plaster
Ceiling
Jul 1, 2019 · Apt 2
Close - Electric
Power outage
Jul 1, 2019 · Apt 2
Close - Heat/hot water
Apartment only
Mar 2, 2016 · Apt 1
Close - Heat/hot water
Apartment only
Feb 8, 2016 · Apt 1FL
Close - Heat/hot water
Apartment only
Aug 10, 2015 · Apt 1FL
Close - Unsanitary condition
Pests
Dec 3, 2014 · Apt 1STFL
Close - Plumbing
Basin/sink
Dec 3, 2014 · Apt 1STFL
Close - Paint/plaster
Ceiling
Dec 3, 2014 · Apt 1STFL
Close - Plumbing
Water supply
Dec 3, 2014 · Apt 1STFL
Close
Show 24 more ↓
- Plumbing
Basin/sink
Dec 3, 2014 · Apt 1STFL
Close - Heat/hot water
Entire building
Nov 19, 2014 · Apt 1FLR
Close - Water leak
Heavy flow
Nov 19, 2014 · Apt 1FLR
Close - Plumbing
Water supply
Nov 19, 2014 · Apt 1FLR
Close - Unsanitary condition
Pests
Sep 8, 2014 · Apt 1ST
Close - Paint/plaster
Wall
Aug 11, 2014 · Apt 1
Close - Plumbing
Water-leaks
Nov 21, 2013 · Apt 2
Close - Plumbing
Water-leaks
Nov 21, 2013 · Apt 2
Close - Electric
Electric-supply
Nov 21, 2013 · Apt 2
Close - Plumbing
Sewer
May 1, 2012 · Apt 2
Close - Heating
Heat related
Dec 16, 2011 · Apt GFL
Close - Heating
Heat related
Dec 16, 2011 · Apt GFL
Close - Heating
Heat related
Nov 1, 2011 · Apt 1F
Close - Construction
Roof
Aug 15, 2011 · Apt 1
Close - Construction
Roof
Aug 15, 2011 · Apt 1
Close - Paint/plaster
Ceiling
Aug 15, 2011 · Apt 1
Close - Heating
Heat related
Jul 21, 2011 · Apt 1F
Close - Heating
Heat related
Jul 12, 2011 · Apt 2
Close - Heating
Heat related
Jun 29, 2011 · Apt 2
Close - Heating
Heat related
Apr 20, 2011 · Apt 1FL
Close - General
Cooking gas
Apr 20, 2011 · Apt 1FL
Close - General
Cooking gas
Apr 13, 2011 · Apt 1F
Close - Heating
Heat related
Apr 13, 2011 · Apt 1F
Close - Plumbing
Water-leaks
Nov 20, 2009 · Apt 1F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1901
- Floors
- 2
- Residential units
- 2
- Building area
- 1,408 ft²
- Lot area
- 2,560 ft²
- Zoning
- R3-2
- Community board
- 501
- Council district
- 49
- Block / lot
- 1169 / 45
- Assessed value
- $36,780
- Landmark / historic district
- No
HPD registration #14719, last renewed Aug 27, 2025.
Questions about 316 Pulaski Avenue
Who owns 316 Pulaski Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Grinberg Ventures LLC.
Does 316 Pulaski Avenue have violations?
Yes. NYC HPD has recorded 42 housing violations at this property.
Is 316 Pulaski Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 316 Pulaski Avenue built?
City records list 1901 as the year it was built.
How many apartments are in 316 Pulaski Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.