148 John Street
Staten Island, NY 10302BBL 5-01124-0046Map
Owner of record: Sino, Sabrije
148 John Street is a two-family home built in 1935 in Staten Island, 10302. It has 2 residential units across 2.5 floors. The owner of record is Sino, Sabrije. HPD has recorded 15 housing violations here, most recently on August 14, 2024. 9 of the 15 most recent violations are still open.
- HPD violations
- 15
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 27
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 15
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1stflo, 1st story, 1st apartment from west at north
Aug 14, 2024 · Apt 1STFLO
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in waste line at washbasin in the bathroom located at apt 1stflo, 1st story, 1st apartment from west at north
Aug 14, 2024 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the mildew on grout around shower stall in the bathroom located at apt 1stflo, 1st story, 1st apartment from west at north
Aug 14, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at front yard
Aug 14, 2024
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1stflo, 1st story, 1st apartment from west at north
Aug 14, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door in the entrance located at apt 1stflo, 1st story, 1st apartment from west at north
Aug 14, 2024 · Apt 1STFLO
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 22, 2024
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the private hallway located at apt 2, 2nd story, 1st apartment from west at north
Apr 20, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Apr 20, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 2nd room from east at north located at apt 2, 2nd story, 1st apartment from west at north
Apr 20, 2024 · Apt 2
Closed — Violation closed
Show 5 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the foyer located at apt 2, 2nd story, 1st apartment from west at north
Apr 20, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Apr 20, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from west at north
Apr 20, 2024 · Apt 2
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from west at north wall in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Apr 20, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from north at east wall in the private hallway located at apt 2, 2nd story, 1st apartment from west at north
Apr 20, 2024 · Apt 2
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Plumbing
Toilet
Sep 25, 2024 · Apt 2
Close - Heat/hot water
Apartment only
Aug 13, 2024 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Aug 10, 2024 · Apt 1STFLO
Close - Unsanitary condition
Sewage
Jul 8, 2024 · Apt 2
Close - Unsanitary condition
Sewage
Jul 8, 2024 · Apt 2
Close - Paint/plaster
Wall
Apr 18, 2024 · Apt 2
Close - Paint/plaster
Wall
Apr 18, 2024 · Apt 2
Close - Heat/hot water
Entire building
Mar 7, 2024 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Mar 7, 2024 · Apt 1STFLO
Close - Unsanitary condition
Pests
Feb 28, 2024 · Apt 2
Close
Show 17 more ↓
- Paint/plaster
Wall
Feb 28, 2024 · Apt 2
Close - Door/window
Window frame
Feb 28, 2024 · Apt 2
Close - Unsanitary condition
Pests
Feb 28, 2024 · Apt 2
Close - Water leak
Heavy flow
Jan 31, 2024 · Apt FL1
Close - Plumbing
Water supply
Jan 31, 2024 · Apt FL1
Close - Water leak
Heavy flow
Jan 31, 2024 · Apt FL1
Close - Heat/hot water
Entire building
Jan 22, 2024 · Apt 1FL
Close - Heat/hot water
Entire building
Jan 20, 2024 · Apt 1
Close - Water leak
Heavy flow
Jan 18, 2024 · Apt 1FLOOR
Close - Heat/hot water
Apartment only
Jan 18, 2024 · Apt 1FLOOR
Close - Electric
Power outage
Jan 9, 2024 · Apt 1
Close - Water leak
Slow leak
Jan 9, 2024 · Apt 1
Close - Electric
No lighting
Oct 4, 2023 · Apt 1FLOOR
Close - Heat/hot water
Apartment only
Oct 4, 2023 · Apt 1FLOOR
Close - Electric
Lighting
Oct 3, 2023 · Apt 1
Close - Plumbing
Water supply
Oct 3, 2023 · Apt 1
Close - Paint/plaster
Wall
Aug 11, 2023 · Apt 1STFLO
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1935
- Floors
- 2.5
- Residential units
- 2
- Building area
- 1,848 ft²
- Lot area
- 2,500 ft²
- Zoning
- R3-2
- Community board
- 501
- Council district
- 49
- Block / lot
- 1124 / 46
- Assessed value
- $40,380
- Landmark / historic district
- No
HPD registration #18315, last renewed Aug 8, 2025.
Questions about 148 John Street
Who owns 148 John Street?
The owner of record in NYC Department of City Planning PLUTO data is Sino, Sabrije.
Does 148 John Street have violations?
Yes. NYC HPD has recorded 15 housing violations at this property.
Is 148 John Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 148 John Street built?
City records list 1935 as the year it was built.
How many apartments are in 148 John Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.