1631 Castleton Avenue
Staten Island, NY 10302BBL 5-01085-0006Map
Owner of record: Russell Armfield
1631 Castleton Avenue is a two-family home built in 1899 in Staten Island, 10302. It has 2 residential units across 2.5 floors. The owner of record is Russell Armfield. HPD has recorded 14 housing violations here, most recently on May 20, 2026. 14 of the 14 most recent violations are still open.
- HPD violations
- 14
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 8
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
May 20, 2026 · Apt 2FL
Open — Violation will be reinspected - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
May 20, 2026 · Apt 2FL
Open — Violation will be reinspected - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at all light fixtures at ceiling in the 3rd room from north at east located at apt 2fl, 2nd story, 1st apartment from north at east
May 20, 2026 · Apt 2FL
Open — Violation will be reinspected - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at west located at apt 2fl, 2nd story, 1st apartment from north at east
May 20, 2026 · Apt 2FL
Open — Violation will be reinspected - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
May 20, 2026 · Apt 2FL
Open — Violation will be reinspected - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
May 20, 2026 · Apt 2FL
Open — Violation will be reinspected - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east
Nov 10, 2025 · Apt 2NDFLO
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish at bathtub by the method of reglazing in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Nov 10, 2025 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east
Nov 10, 2025 · Apt 2NDFLO
Open — Violation will be reinspected - BHazardous
Properly repair or replace the broken or defective counter balance lower sash 2nd window from north at east wall in the 4th room from north located at apt 2ndflo, 2nd story, 1st apartment from north at east
Nov 10, 2025 · Apt 2NDFLO
Open — Violation will be reinspected
Show 4 more ↓
- BHazardous
Properly repair or replace the broken or defective counter balance lower sash 1st, 2nd and 3rd window from east at south wall in the 4th room from north located at apt 2ndflo, 2nd story, 1st apartment from north at east
Nov 10, 2025 · Apt 2NDFLO
Open — Violation will be reinspected - BHazardous
Properly repair or replace the broken or defective wall cabinet at north wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Nov 10, 2025 · Apt 2NDFLO
Open — Violation will be reinspected - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east
Nov 10, 2025 · Apt 2NDFLO
Open — Violation will be reinspected - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east
Nov 10, 2025 · Apt 2NDFLO
Open — Violation will be reinspected
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Water leak
Heavy flow
May 19, 2026 · Apt 2FL
Close - Electric
Power outage
May 19, 2026 · Apt 2FL
Close - Door/window
Window pane
Nov 7, 2025 · Apt 2NDFLO
Close - General
Cabinet
Nov 7, 2025 · Apt 2NDFLO
Close - Door/window
Window frame
Nov 7, 2025 · Apt 2NDFLO
Close - Electric
Outlet/switch
Nov 7, 2025 · Apt 2NDFLO
Close - Paint/plaster
Wall
Nov 7, 2025 · Apt 2NDFLO
Close - Electric
Power outage
Jun 27, 2025 · Apt 2FLOOR
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1899
- Floors
- 2.5
- Residential units
- 2
- Building area
- 1,830 ft²
- Lot area
- 2,500 ft²
- Zoning
- R3A
- Community board
- 501
- Council district
- 49
- Block / lot
- 1085 / 6
- Assessed value
- $32,400
- Landmark / historic district
- No
Questions about 1631 Castleton Avenue
Who owns 1631 Castleton Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Russell Armfield.
Does 1631 Castleton Avenue have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 1631 Castleton Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1631 Castleton Avenue built?
City records list 1899 as the year it was built.
How many apartments are in 1631 Castleton Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.