143 Charles Avenue
Staten Island, NY 10302BBL 5-01082-0001Map
Owner of record: Faber Lot LLC
143 Charles Avenue is a mixed residential and retail building built in 1920 in Staten Island, 10302. It has 2 residential units across 2.5 floors. The owner of record is Faber Lot LLC. HPD has recorded 44 housing violations here, most recently on June 16, 2025. 42 of the 44 most recent violations are still open.
- HPD violations
- 44
- DOB violations
- 22
- ECB violations
- 7
- HPD complaints
- 179
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 44
- CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at building entrance door , 1st story
Jun 16, 2025
Open — Nov sent out - ANon-hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at ceiling at vestibule area , 1st story
Jun 16, 2025
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... 4 sq.ft. ceiling in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east
Feb 7, 2024 · Apt 1FL
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east
Feb 7, 2024 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the 2nd room from north at east located at apt 1fl, 1st story, 1st apartment from north at east
Feb 7, 2024 · Apt 1FL
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked to boiler room at cellar
Feb 7, 2024
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... 4 sq.ft. ceiling in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east original violation 16656138 issued 07-feb-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Feb 7, 2024 · Apt 1FL
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair the broken or defective locking device at building front entrance door , 1st story
Dec 7, 2022
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures no volume at sink in the kitchen located at apt 2, 2nd story
Jan 16, 2013 · Apt 2
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures no volume at sink in the kitchen located at apt 2, 2nd story
Jan 16, 2013 · Apt 2
Open — Nov sent out
Show 34 more ↓
- BHazardous
Properly secure the loose hand rail at public hall stairs, 2nd story
Jan 16, 2013
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story
Jan 16, 2013 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective window crank at east wall in the kitchen located at apt 2, 2nd story
Jan 16, 2013 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective window crank at west wall in the private hallway located at apt 2, 2nd story
Jan 16, 2013 · Apt 2
Open — Nov sent out - ANon-hazardous
Refit window lower sash at north wall in the bathroom located at apt 2, 2nd story
Jan 16, 2013 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective window glass at east wall in the 1st room from east located at apt 2, 1st story
Jan 16, 2013 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 2, 2nd story
Jan 16, 2013 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 2, 2nd story
Jan 16, 2013 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2, 2nd story
Jan 16, 2013 · Apt 2
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 3rd room from north located at apt 2, 2nd story, section ''bldg#145''
Jul 18, 2012 · Apt 2
Open — Nov sent out - BHazardous
Properly secure the loose wall cabinets pulling away from south wall in the kitchen located at apt 2, 2nd story, section ''bldg#145''
Jul 13, 2012 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2, 2nd story, section ''bldg#145''
Jul 13, 2012 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective inoperative vent fan in the bathroom located at apt 2, 2nd story, section ''bldg#145''
Jul 13, 2012 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood and vinyl tiles floor in the kitchen located at apt 2, 2nd story, section ''bldg#145''
Jul 13, 2012 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls in the bathroom located at apt 2, 2nd story, section ''bldg#145''
Jul 13, 2012 · Apt 2
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, section ''bldg#145''
Jul 13, 2012 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls in the private hallway located at apt 2, 2nd story, section ''bldg#145''
Jul 13, 2012 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color east and north walls in the 3rd room from north located at apt 2, 2nd story, section ''bldg#145''
Jul 13, 2012 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective crack center glass pane at south west window in the 3rd room from north located at apt 2, 2nd story, section ''bldg#145''
Jul 13, 2012 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 2, 2nd story, section ''bldg#145''
Jul 13, 2012 · Apt 2
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ( toilet ) in the bathroom located at apt 2, 2nd story, section ''bldg#145''
Jul 13, 2012 · Apt 2
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the nuisance consisting of mold ... present at lower wall panel ( approx-4 sq.ft ) around shower-stall in the bathroom located at apt 2, 2nd story, section ''bldg#145''
Jul 13, 2012 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective crack glass pane at upper sash north window in the bathroom located at apt 2, 2nd story, section ''bldg#145''
Jul 13, 2012 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective inoperable window in the bathroom located at apt 2, 2nd story, section ''bldg#145''
Jul 13, 2012 · Apt 2
Open — Nov sent out - BHazardous
Properly secure the loose washbasin to west wall in the bathroom located at apt 2, 2nd story, section ''bldg#145''
Jul 13, 2012 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective inoperable window in the private hallway located at apt 2, 2nd story, section ''bldg#145''
Jul 13, 2012 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective door in the 1st room from north at west located at apt 1, 1st story
Jun 9, 2010 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1, 1st story
Jun 9, 2010 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective wood door frame in the bathroom located at apt 1, 1st story
Jun 9, 2010 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the missing wood doors and draws at base cabinets in the kitchen located at apt 1, 1st story
Jun 9, 2010 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of evidence of leak at ceiling in the kitchen located at apt 1, 1st story
Jun 9, 2010 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1fl, 1st story, section ''#145''
Aug 14, 2009 · Apt 1FL
Open — Nov certified late - BHazardous
Properly repair the broken or defective doors and draws at base cabinets in the kitchen located at apt 1fl, 1st story, section ''#145''
Aug 14, 2009 · Apt 1FL
Open — Not complied with - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed at front entrance door to building
Apr 22, 2009
Open — Nov certified late
DOB building violations · 22
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 12 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 4, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 5, 2017
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 5, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed
ECB violations · 7
- Class - 1
Failure to comply with the commissioner's order contained in summons/violation #35163689n issued 12/22/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for fall gut renovation i
Mar 21, 2018 · Penalty $2,500
Active - Class - 1
Work w/o permit. observed: this comm/residential space gutted entire bldg put up all new framing all new electrical & plumbing all floor joist are compromised an not structurally done right & a 5 inch hole thru
Dec 22, 2017 · Penalty $1,600
Active - Class - 1
4a,19b. 51-missing low water cut-off; 51a-missing manual reset aqua stat. do not operate boiler until all hazardous conditions are immediately correct and dob is notified to reinspect to lift the cease-use or
Jan 9, 2017 · Penalty $5,000
Active - Class - 1
4a,19b. 51-missing low water cut-off; 51a-missing manual reset aqua stat. do not operate boiler until all hazardous conditions are immediately correct and dob is notified to reinspect to lift the cease-use or
Jan 9, 2017 · Penalty $5,000
Active - Class - 2
Occupancy contrary to c of o#64442.note:cert of occupancy 64442 states 2 fam & 3 offices.@ time of inspec there are 4families & 1 office-2 families on front & 1 office & 2 families on second.rem:discontinue ill
Jul 17, 2012 · Penalty $6,000
Active - Class - 2
Failure to maintain bldg.note:roof shingle loose-shingles falling onto adjoining property.molding @ soffit not connected.handrail @ interior is loose/broke.window @ 2 flr get very loose only 2 screws.bldg exter
Jul 17, 2012 · Penalty $2,500
Active - Non-hazardous
Failure to maintain premises. noted: a large tree in parking lot with dried branches is in danger of falling. remedy: prrone the/ dried branches and branches that are enchoaching adjacent proper/ immediately.
Oct 23, 2003
Resolve
Complaints
- Heat/hot water
Apartment only
Feb 6, 2024 · Apt 1FL
Close - Unsanitary condition
Mold
Feb 6, 2024 · Apt 1FL
Close - Heat/hot water
Apartment only
Dec 20, 2022 · Apt 2FL
Close - Electric
No lighting
Dec 20, 2022 · Apt 2FL
Close - Electric
Power outage
Dec 4, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2022 · Apt BLDG
Close - Heating
Heat related
Jan 17, 2013 · Apt 2NDFL
Close - General
Stairs
Jan 7, 2013 · Apt 2
Close - General
Ventilation system
Jan 7, 2013 · Apt 2
Close - Nonconst
Smoke detector
Jan 7, 2013 · Apt 2
Close
Show 40 more ↓
- Nonconst
Carbon monoxide
Jan 7, 2013 · Apt 2
Close - Paint/plaster
Wall
Jan 7, 2013 · Apt 2
Close - Paint/plaster
Wall
Jan 7, 2013 · Apt 2
Close - General
Windows
Jan 7, 2013 · Apt 2
Close - Appliance
Electric/gas range
Jan 7, 2013 · Apt 2
Close - Electric
Lighting
Jan 7, 2013 · Apt 2
Close - General
Mold
Jan 7, 2013 · Apt 2
Close - General
Windows
Jan 7, 2013 · Apt 2
Close - General
Windows
Jan 7, 2013 · Apt 2
Close - General
Windows
Jan 7, 2013 · Apt 2
Close - General
Floor
Jan 7, 2013 · Apt 2
Close - General
Floor
Jan 7, 2013 · Apt 2
Close - General
Floor
Jan 7, 2013 · Apt 2
Close - General
Floor
Jan 7, 2013 · Apt 2
Close - Nonconst
Vermin
Jan 7, 2013 · Apt 2
Close - Nonconst
Vermin
Jan 7, 2013 · Apt 2
Close - Heating
Heat related
Dec 16, 2012 · Apt 2
Close - Heating
Heat related
Dec 14, 2012 · Apt 2
Close - Heating
Heat related
Oct 17, 2012 · Apt 2
Close - General
Floor
Jul 16, 2012 · Apt 2
Close - Plumbing
Water-leaks
Jul 16, 2012 · Apt 2
Close - Nonconst
Carbon monoxide
Jul 16, 2012 · Apt 2
Close - Nonconst
Smoke detector
Jul 16, 2012 · Apt 2
Close - Plumbing
Basin/sink
Jul 16, 2012 · Apt 2
Close - Plumbing
Basin/sink
Jul 16, 2012 · Apt 2
Close - General
Mold
Jul 16, 2012 · Apt 2
Close - Electric
Wiring
Jul 16, 2012 · Apt 2
Close - Electric
Wiring
Jul 16, 2012 · Apt 2
Close - General
Mold
Jul 16, 2012 · Apt 2
Close - General
Stairs
Jul 16, 2012 · Apt 2
Close - General
Windows
Jul 16, 2012 · Apt 2
Close - Heating
Heat related
Jul 16, 2012 · Apt 2
Close - Paint/plaster
Wall
Jul 13, 2012 · Apt 1F
Close - Nonconst
Vermin
Jul 13, 2012 · Apt 1F
Close - Nonconst
Vermin
Jul 13, 2012 · Apt 1F
Close - Paint/plaster
Wall
Jul 13, 2012 · Apt 1F
Close - Paint/plaster
Wall
Jul 13, 2012 · Apt 1F
Close - Plumbing
Water-leaks
Jul 13, 2012 · Apt 1F
Close - General
Doors
Jul 13, 2012 · Apt 1F
Close - Electric
Wiring
Jul 13, 2012 · Apt 1F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1920
- Floors
- 2.5
- Residential units
- 2
- Building area
- 7,000 ft²
- Lot area
- 7,748 ft²
- Zoning
- C4-2
- Community board
- 501
- Council district
- 49
- Block / lot
- 1082 / 1
- Assessed value
- $396,000
- Landmark / historic district
- No
Questions about 143 Charles Avenue
Who owns 143 Charles Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Faber Lot LLC.
Does 143 Charles Avenue have violations?
Yes. NYC HPD has recorded 44 housing violations at this property.
Is 143 Charles Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 143 Charles Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 143 Charles Avenue?
It has 2 residential units and 4 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.