227 Port Richmond Avenue
Staten Island, NY 10302BBL 5-01035-0009Map
Owner of record: Ndoye, Mamadou
227 Port Richmond Avenue is a store building built in 1931 in Staten Island, 10302. It has 1 residential unit across 2 floors. The owner of record is Ndoye, Mamadou. HPD has recorded 59 housing violations here, most recently on April 24, 2026. 45 of the 50 most recent violations are still open.
- HPD violations
- 59
- DOB violations
- 2
- ECB violations
- 4
- HPD complaints
- 46
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 59
- BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north original violation 18810645 issued 24-apr-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Apr 24, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective vinyl tile at floor in the private hallway located at apt 2a, 2nd story, 1st apartment from west at north
Apr 24, 2026 · Apt 2A
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the mildew on grout around bathtub and between ceramic tile at all walls in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Apr 24, 2026 · Apt 2A
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Apr 24, 2026 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective counter balance on lower sash at 1st window from west at north wall in the 2nd room from east at south located at apt 2a, 2nd story, 1st apartment from west at north
Apr 24, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance on lower sash at 4th window from south at west wall in the 4th room from east located at apt 2a, 2nd story, 1st apartment from west at north
Apr 24, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance on lower sash at 2nd window from south at west wall in the 4th room from east located at apt 2a, 2nd story, 1st apartment from west at north
Apr 24, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Apr 24, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Apr 24, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective connection at waste line under sink in the kitchen located at apt 2a, 2nd story, 1st apartment from west at north
Apr 24, 2026 · Apt 2A
Open — Nov sent out
Show 40 more ↓
- BHazardous
Remove all obstructions and repair all defects in at washbasin in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Dec 24, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at sink in the kitchen located at apt 2a, 2nd story, 1st apartment from west at north
Dec 24, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Dec 24, 2025 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Dec 24, 2025 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, east wall in the 3rd room from east located at apt 2a, 2nd story, 1st apartment from west at north
Dec 5, 2023 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, west wall in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Dec 5, 2023 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall in the kitchen located at apt 2a, 2nd story, 1st apartment from west at north
Dec 5, 2023 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from north at east wall in the 4th room from east located at apt 2a, 2nd story, 1st apartment from west at north
Dec 5, 2023 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 2a, 2nd story, 1st apartment from west at north
Dec 5, 2023 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 3rd room from east located at apt 2a, 2nd story, 1st apartment from west at north
Nov 28, 2023 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the 3rd room from east located at apt 2a, 2nd story, 1st apartment from west at north
Nov 28, 2023 · Apt 2A
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Nov 28, 2023 · Apt 2A
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Nov 28, 2023 · Apt 2A
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Nov 28, 2023 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... approximately 20 sq ft at ceiling and 10 sq ft at west wall in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Nov 28, 2023 · Apt 2A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Section 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2a, 2nd story, apartment at north
Jan 29, 2014 · Apt 2A
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). '' missing '' in the entire apartment located at apt 2a, 2nd story, apartment at north
Jan 29, 2014 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling in the kitchen located at apt 2a, 2nd story, apartment at north
Jan 29, 2014 · Apt 2A
Open — Nov sent out - BHazardous
Replace with new the missing light fixture at ceiling in the kitchen located at apt 2a, 2nd story, apartment at north
Jan 29, 2014 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the north wall in the kitchen located at apt 2a, 2nd story, apartment at north
Jan 29, 2014 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the nuisance consisting of mold ... present at ceiling ( approx- 32 sq,ft ) north wall ( approx- 16 sq,ft ) and west wall ( approx- 8 sq,ft ) in the bathroom located at apt 2a, 2nd story, apartment at north
Jan 29, 2014 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Remove all obstructions from water closet ..toilet-bowl in the bathroom located at apt 2a, 2nd story, apartment at north
Jan 29, 2014 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed at entrance door located at apt 2a, 2nd story, apartment at north
Jan 29, 2014 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and east wall in the 4th room from east located at apt 2a, 2nd story, apartment at north
Jan 29, 2014 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair the broken or defective inoperable ( 2 ) front burners at gas-range in the kitchen located at apt 2a, 2nd story, apartment at north
Jan 29, 2014 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair the broken or defective inoperative burners at front and rear right side of gas range in the kitchen located at apt 2a, 2nd story
Dec 28, 2011 · Apt 2A
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at washbasin in the bathroom located at apt 2a, 2nd story
Dec 28, 2011 · Apt 2A
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures at washbasin in the bathroom located at apt 2a, 2nd story
Dec 28, 2011 · Apt 2A
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electrical wires at ceiling ( no sparks ) in the foyer located at apt 2a, 2nd story
Dec 28, 2011 · Apt 2A
Open — Nov sent out - BHazardous
Replace with new the missing light fixture at ceiling in the foyer located at apt 2a, 2nd story
Dec 28, 2011 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the nuisance consisting of mold ... present at ceiling ( approx- 26 sq.ft ) and west wall ( approx- 6 sq.ft ) in the bathroom located at apt 2a, 2nd story
Dec 28, 2011 · Apt 2A
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electrical wires at north wall ( no sparks ) at public hall, 2nd story
Dec 28, 2011
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electrical wires at ceiling ( no sparks ) at public hall, 1st story
Dec 28, 2011
Open — Nov sent out - BHazardous
Replace with new the missing light fixture at ceiling at public hall, 1st story
Dec 28, 2011
Open — Nov sent out - BHazardous
Provide adequate lighting for light fixture at ceiling at public hall, 2nd story
Dec 28, 2011
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2a, 2nd story
Dec 28, 2011 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2a, 2nd story
Dec 28, 2011 · Apt 2A
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of exposed electrical wires at ceiling light fixture at public hall, 2nd story
Mar 13, 2009
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story
Mar 13, 2009 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story
Mar 4, 2009 · Apt 2
Open — Nov sent out
DOB building violations · 2
- Construction other optional
Observed facade in state of disrepair with parapet wall leaning toward sidewalk. bricks bulging outward on left side on exp 1.
Jun 16, 2026
Dob violation - active - Immediate emergency anythingoptional
Install approximately 26 linear feet of sidewalk shed along the entire front of exposure 1 and extend 8 feet past the building to protect the adjacent property at 255 port richmond avenue (exposure 2). the sidewalk shed shal be installed tight back to the building and extend across the sidewalk. total shed - 26 linear feet
Jun 16, 2026
Dob violation - dismissed
ECB violations · 4
- Class - 1
Failure to maintain building in code-compliant manner. no certificate of correction on file for vio#39189155j as of 6/16/2026,, repair and/replace
Jun 16, 2026 · Penalty $2,530
Active - Class - 1
At front of building,above 2nd floor window,section of fascia missing,also noted aluminum finish hangs loose., maintain exterior building wall
May 19, 2026 · Penalty $5,030
Active - Class - 2
Failure to maintain, i observed broken sewage pipe spilling waste on basement floor, pipe should be maintained in proper operating condition as per pc 102.3, the use of a dasher drain hose to discharge sewage f
Mar 11, 2026
Resolve - Class - 2
Failure to maintain building in a code-compliant manner, 28-301.1: atoi on a 2-story, 2-unit, commercial, nfp building, in c4-2 district, observed, at the cellar level, excessive water leakage on the cellar flo
Mar 19, 2023
Resolve
Complaints
- Plumbing
Basin/sink
Dec 27, 2025 · Apt 2A
Close - Unsanitary condition
Pests
Dec 27, 2025 · Apt 2A
Close - Appliance
Electric/gas range
Dec 27, 2025 · Apt 2A
Close - Safety
Carbon monoxide detector
Dec 27, 2025 · Apt 2A
Close - Door/window
Window frame
Dec 27, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Dec 23, 2025 · Apt 2A
Close - Unsanitary condition
Pests
Dec 7, 2025 · Apt 2A
Close - Plumbing
Basin/sink
Dec 7, 2025 · Apt 2A
Close - Plumbing
Toilet
Dec 7, 2025 · Apt 2A
Close - Plumbing
Bathtub/shower
Dec 7, 2025 · Apt 2A
Close
Show 36 more ↓
- Heat/hot water
Apartment only
Nov 24, 2023 · Apt 2A
Close - Heat/hot water
Apartment only
Nov 21, 2023 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Nov 7, 2023 · Apt 2A
Close - Appliance
Electric/gas range
Jan 22, 2014 · Apt 2A
Close - Plumbing
Radiator
Jan 22, 2014 · Apt 2A
Close - General
Cooking gas
Jan 22, 2014 · Apt 2A
Close - Heating
Heat-plant
Jan 17, 2014 · Apt 2A
Close - Appliance
Electric/gas range
Jan 17, 2014 · Apt 2A
Close - Heating
Heat related
Jan 17, 2014 · Apt 2A
Close - Nonconst
Smoke detector
Apr 29, 2013 · Apt 2A
Close - Nonconst
Carbon monoxide
Apr 29, 2013 · Apt 2A
Close - Heating
Heat related
Jan 17, 2012 · Apt 2A
Close - Heating
Heat related
Dec 27, 2011 · Apt 2FL
Close - Heating
Heat related
Mar 12, 2009 · Apt 2B
Close - Heating
Heat related
Mar 3, 2009 · Apt 2
Close - General
Doors
Mar 3, 2009 · Apt 2
Close - Plumbing
Water supply
Jan 8, 2009 · Apt 2B
Close - General
Doors
Jan 8, 2009 · Apt 2B
Close - Heating
Heat related
Jan 8, 2009 · Apt 2B
Close - Heating
Heat related
Nov 26, 2008 · Apt 2A
Close - General
Mailbox
Nov 26, 2008 · Apt 2A
Close - Electric
Wiring
Nov 26, 2008 · Apt 2A
Close - Heating
Heat related
Nov 21, 2008 · Apt 2A
Close - General
Cooking gas
Nov 19, 2008 · Apt 2B
Close - Heating
Heat related
Nov 19, 2008 · Apt 2B
Close - General
Cooking gas
Nov 13, 2008 · Apt 2B
Close - Heating
Heat related
Nov 13, 2008 · Apt 2B
Close - Heating
Heat related
Oct 13, 2008 · Apt 2A
Close - Paint/plaster
Wall
Oct 12, 2008 · Apt 2B
Close - General
Locks
Oct 12, 2008 · Apt 2B
Close - Nonconst
Vermin
Oct 12, 2008 · Apt 2B
Close - Plumbing
Basin/sink
Oct 12, 2008 · Apt 2B
Close - Plumbing
Basin/sink
Oct 12, 2008 · Apt 2B
Close - Nonconst
Vermin
Sep 1, 2008 · Apt 2A
Close - Heating
Heat related
Sep 1, 2008 · Apt 2A
Close - Electric
Wiring
Sep 1, 2008 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K2)
- Year built
- 1931
- Floors
- 2
- Residential units
- 1
- Building area
- 2,502 ft²
- Lot area
- 2,340 ft²
- Zoning
- C4-2
- Community board
- 501
- Council district
- 49
- Block / lot
- 1035 / 9
- Assessed value
- $122,850
- Landmark / historic district
- No
Questions about 227 Port Richmond Avenue
Who owns 227 Port Richmond Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Ndoye, Mamadou.
Does 227 Port Richmond Avenue have violations?
Yes. NYC HPD has recorded 59 housing violations at this property.
Is 227 Port Richmond Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 227 Port Richmond Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 227 Port Richmond Avenue?
It has 1 residential units and 2 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.