1918 Richmond Terrace
Staten Island, NY 10302BBL 5-01008-0043Map
Owner of record: Yang, Li Yu
1918 Richmond Terrace is a mixed residential and retail building built in 1931 in Staten Island, 10302. It has 4 residential units across 3 floors. The owner of record is Yang, Li Yu. HPD has recorded 190 housing violations here, most recently on July 15, 2026. 42 of the 50 most recent violations are still open.
- HPD violations
- 190
- DOB violations
- 4
- ECB violations
- 4
- HPD complaints
- 178
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 190
- ANon-hazardous
Properly repair with similar material the broken or defective fire retardant plaster at east wall at public hall, 3rd story
Jul 15, 2026
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall at public hall, 1st story
Jul 15, 2026
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall at public hall, 2nd story
Jul 15, 2026
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall at public hall, 3rd story
Jul 15, 2026
Open — First no access to re- inspect violation - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at south wall at public hall, 1st story
Jul 15, 2026
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at south wall at public hall, 1st story
Jul 15, 2026
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant plaster at east wall at public hall, 2nd story
Jul 15, 2026
Open — First no access to re- inspect violation - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations ,missing in the entire apartment located at apt 2a, 3rd story, 1st apartment from north at east
Jul 14, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules ,missing in the entire apartment located at apt 2a, 3rd story, 1st apartment from north at east
Jul 14, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at building entrance door , 1st story
Oct 11, 2025
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 3rd story, 1st apartment from west at north
Oct 11, 2025 · Apt 2A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective mechanical air vent at ceiling in the bathroom located at apt 2a, 3rd story, 1st apartment from west at north
Oct 11, 2025 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2a, 3rd story, 1st apartment from west at north
Oct 11, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Refit door in the entrance located at apt 2a, 3rd story, 1st apartment from west at north
Oct 11, 2025 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 3rd story, 1st apartment from west at north
Oct 11, 2025 · Apt 2A
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint or post a sign indicating floors .. at public hall
Jun 8, 2025
Open — Nov sent out - ANon-hazardous
Paint or post a sign indicating floors missing near and or fire stairs at public hall, 2nd story
Jun 8, 2025
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor at public hall, 2nd story
Jun 8, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door at west at public hall, 2nd story
Jun 8, 2025
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective concrete facade at building west
Jun 8, 2025
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling near east wall in the 1st room from east located at apt 1b, 2nd story, 1st apartment from east at south
Jun 8, 2025 · Apt 1B
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling near east wall in the 1st room from east located at apt 1b, 2nd story, 1st apartment from east at south
Jun 8, 2025 · Apt 1B
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 1b, 2nd story, 1st apartment from east at south
Jun 8, 2025 · Apt 1B
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling near west wall in the 5th room from east located at apt 1b, 2nd story, 1st apartment from east at south
Jun 8, 2025 · Apt 1B
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling near west wall in the 5th room from east located at apt 1b, 2nd story, 1st apartment from east at south
Jun 8, 2025 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1b, 2nd story, 1st apartment from east at south
Jun 8, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly secure the loose washbasin in the bathroom located at apt 1b, 2nd story, 1st apartment from east at south
Jun 8, 2025 · Apt 1B
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 1b, 2nd story, 1st apartment from east at south
Jun 8, 2025 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at secondary egress door at north in the 5th room from east located at apt 1b, 2nd story, 1st apartment from east at south
Jun 8, 2025 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 3rd story, 1st apartment from north at east
Mar 25, 2025 · Apt 2A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 3rd story, 1st apartment from north at east
Mar 25, 2025 · Apt 2A
Open — Notice of issuance sent to tenant - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130degrees at all hot water fixture in the entire apartment located at apt 2a, 3rd story, 1st apartment from north at east
Mar 25, 2025 · Apt 2A
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). that is defective in the entire apartment located at apt 2a, 3rd story, 1st apartment from west at north
Feb 9, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Repair or replace the smoke detector that is defective in the entire apartment located at apt 2a, 3rd story, 1st apartment from west at north
Feb 9, 2025 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2a, 3rd story, 1st apartment from west at north
Feb 9, 2025 · Apt 2A
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds the maximum temperature of 130 degrees fahrenheit in the kitchen located at apt 2a, 3rd story, 1st apartment from west at north
Feb 9, 2025 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective missing at vestibule entrance at public hall, 1st story
Feb 9, 2025
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 3rd room from north located at apt 2a, 3rd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 2nd radiator from west at north wall in the kitchen located at apt 2a, 3rd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 4th room from north at east located at apt 2a, 3rd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 4th room from north at east located at apt 2a, 3rd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 3rd room from north located at apt 2a, 3rd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 2nd radiator from west at north wall in the kitchen located at apt 2a, 3rd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2a, 3rd story, 1st apartment from west at north
Dec 16, 2024 · Apt 2A
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding allowable maximum temperature of 130 degrees in the kitchen located at apt 2a, 3rd story, 1st apartment from west at north
Dec 12, 2024 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 3rd story, 1st apartment from west at north
Dec 10, 2024 · Apt 2A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 3rd story, 1st apartment from west at north
Dec 10, 2024 · Apt 2A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective door frame at the east wall in the 4th room from north at east located at apt 2a, 3rd story, 1st apartment from west at north
Nov 8, 2024 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over the drop ceiling in the kitchen located at apt 2a, 3rd story, 1st apartment from west at north
Nov 8, 2024 · Apt 2A
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration the drop ceiling in the kitchen located at apt 2a, 3rd story, 1st apartment from west at north
Nov 8, 2024 · Apt 2A
Open — Nov sent out
DOB building violations · 4
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed
ECB violations · 4
- Class - 2
As per hmc-27-2033, no visible signage from front door for access to boiler room., maintain boiler
Oct 14, 2022
Resolve - Class - 1
B154,4a,5a,15,16,19b,24b,32a,36,38,50,50a,b,c. 50- boiler room not fire proof. 50a- flue pipe not supported. 50b- missing (clear out) at base of chimney. 50c- safety valve not piped down.
Sep 3, 2010 · Penalty $1,000
Resolve - Non-hazardous
Work does not conform to approved plan.non-conforming work noted:new curb cut does not conform to approved plans.the plans shows 8 feet butthe actual curb cut was 11 feet.remedy:conform to approve plans
Nov 17, 2003
Resolve - Non-hazardous
Work without a permit work noted concreting the vacant space at the right side yard approxiniately 10'x 57 illegaly.remedy:obtain permit or restore to prior legal condition
Nov 17, 2003
Resolve
Complaints
- Paint/plaster
Wall
Jul 10, 2026 · Apt 2A
Close - Electric
Wiring
Jul 10, 2026 · Apt 2A
Close - Electric
Lighting
Jul 10, 2026 · Apt 2A
Close - Electric
Wiring
Jul 10, 2026 · Apt 2A
Close - Paint/plaster
Wall
Jul 10, 2026 · Apt 2A
Close - Electric
Power outage
Jul 8, 2026 · Apt 2A
Close - Heat/hot water
Entire building
Oct 11, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Oct 10, 2025 · Apt 2A
Close - Plumbing
Toilet
Jun 1, 2025 · Apt 1B
Close - Plumbing
Basin/sink
Jun 1, 2025 · Apt 1B
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Apr 7, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Apr 7, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Apr 2, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Mar 25, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Mar 21, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Mar 14, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Feb 24, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Feb 23, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Feb 22, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Feb 14, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Feb 12, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Feb 10, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Feb 7, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Feb 3, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Feb 1, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Jan 22, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Jan 2, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Jan 1, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Dec 31, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 26, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 18, 2024 · Apt 2A
Close - Heat/hot water
Apartment only
Dec 16, 2024 · Apt 2A
Close - Heat/hot water
Entire building
Dec 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 15, 2024 · Apt 2A
Close - Heat/hot water
Apartment only
Dec 13, 2024 · Apt 2A
Close - Heat/hot water
Entire building
Dec 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 11, 2024 · Apt 2A
Close - Heat/hot water
Apartment only
Dec 10, 2024 · Apt 2A
Close - Heat/hot water
Entire building
Dec 10, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 28, 2024 · Apt 2A
Close - Heat/hot water
Apartment only
Nov 28, 2024 · Apt 2A
Close - Heat/hot water
Entire building
Nov 27, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 27, 2024 · Apt 2A
Close - Heat/hot water
Entire building
Nov 27, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 27, 2024 · Apt 2A
Close - Heat/hot water
Entire building
Nov 21, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 21, 2024 · Apt 2A
Close - Heat/hot water
Apartment only
Nov 12, 2024 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1931
- Floors
- 3
- Residential units
- 4
- Building area
- 7,686 ft²
- Lot area
- 5,144 ft²
- Zoning
- R4
- Community board
- 501
- Council district
- 49
- Block / lot
- 1008 / 43
- Assessed value
- $434,250
- Landmark / historic district
- No
HPD registration #500138, last renewed Aug 26, 2025.
Questions about 1918 Richmond Terrace
Who owns 1918 Richmond Terrace?
The owner of record in NYC Department of City Planning PLUTO data is Yang, Li Yu.
Does 1918 Richmond Terrace have violations?
Yes. NYC HPD has recorded 190 housing violations at this property.
Is 1918 Richmond Terrace rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1918 Richmond Terrace built?
City records list 1931 as the year it was built.
How many apartments are in 1918 Richmond Terrace?
It has 4 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.