roofy

1918 Richmond Terrace

Staten Island, NY 10302BBL 5-01008-0043Map

Owner of record: Yang, Li Yu

1918 Richmond Terrace is a mixed residential and retail building built in 1931 in Staten Island, 10302. It has 4 residential units across 3 floors. The owner of record is Yang, Li Yu. HPD has recorded 190 housing violations here, most recently on July 15, 2026. 42 of the 50 most recent violations are still open.

HPD violations
190
DOB violations
4
ECB violations
4
HPD complaints
178

What to know

Concern
11 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Jul 15, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 190

  • A

    Properly repair with similar material the broken or defective fire retardant plaster at east wall at public hall, 3rd story

    Jul 15, 2026

    Open — First no access to re- inspect violation
  • A

    Paint with light colored paint to the satisfaction of this department at south wall at public hall, 1st story

    Jul 15, 2026

    Open — First no access to re- inspect violation
  • A

    Paint with light colored paint to the satisfaction of this department at east wall at public hall, 2nd story

    Jul 15, 2026

    Open — First no access to re- inspect violation
  • A

    Paint with light colored paint to the satisfaction of this department at east wall at public hall, 3rd story

    Jul 15, 2026

    Open — First no access to re- inspect violation
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at south wall at public hall, 1st story

    Jul 15, 2026

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective fire retardant plaster at south wall at public hall, 1st story

    Jul 15, 2026

    Open — First no access to re- inspect violation
  • A

    Properly repair with similar material the broken or defective fire retardant plaster at east wall at public hall, 2nd story

    Jul 15, 2026

    Open — First no access to re- inspect violation
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations ,missing in the entire apartment located at apt 2a, 3rd story, 1st apartment from north at east

    Jul 14, 2026 · Apt 2A

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules ,missing in the entire apartment located at apt 2a, 3rd story, 1st apartment from north at east

    Jul 14, 2026 · Apt 2A

    Open — Nov sent out
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at building entrance door , 1st story

    Oct 11, 2025

    Open — Nov sent out
Show 40 more ↓
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 3rd story, 1st apartment from west at north

    Oct 11, 2025 · Apt 2A

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective mechanical air vent at ceiling in the bathroom located at apt 2a, 3rd story, 1st apartment from west at north

    Oct 11, 2025 · Apt 2A

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2a, 3rd story, 1st apartment from west at north

    Oct 11, 2025 · Apt 2A

    Open — Nov sent out
  • B

    Refit door in the entrance located at apt 2a, 3rd story, 1st apartment from west at north

    Oct 11, 2025 · Apt 2A

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2a, 3rd story, 1st apartment from west at north

    Oct 11, 2025 · Apt 2A

    Open — Notice of issuance sent to tenant
  • A

    Paint or post a sign indicating floors .. at public hall

    Jun 8, 2025

    Open — Nov sent out
  • A

    Paint or post a sign indicating floors missing near and or fire stairs at public hall, 2nd story

    Jun 8, 2025

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective wood floor at public hall, 2nd story

    Jun 8, 2025

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at fire door at west at public hall, 2nd story

    Jun 8, 2025

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective concrete facade at building west

    Jun 8, 2025

    Open — Nov sent out
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling near east wall in the 1st room from east located at apt 1b, 2nd story, 1st apartment from east at south

    Jun 8, 2025 · Apt 1B

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling near east wall in the 1st room from east located at apt 1b, 2nd story, 1st apartment from east at south

    Jun 8, 2025 · Apt 1B

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 1b, 2nd story, 1st apartment from east at south

    Jun 8, 2025 · Apt 1B

    Open — Nov sent out
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling near west wall in the 5th room from east located at apt 1b, 2nd story, 1st apartment from east at south

    Jun 8, 2025 · Apt 1B

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling near west wall in the 5th room from east located at apt 1b, 2nd story, 1st apartment from east at south

    Jun 8, 2025 · Apt 1B

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1b, 2nd story, 1st apartment from east at south

    Jun 8, 2025 · Apt 1B

    Closed — Violation dismissed
  • B

    Properly secure the loose washbasin in the bathroom located at apt 1b, 2nd story, 1st apartment from east at south

    Jun 8, 2025 · Apt 1B

    Open — Nov sent out
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 1b, 2nd story, 1st apartment from east at south

    Jun 8, 2025 · Apt 1B

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at secondary egress door at north in the 5th room from east located at apt 1b, 2nd story, 1st apartment from east at south

    Jun 8, 2025 · Apt 1B

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 3rd story, 1st apartment from north at east

    Mar 25, 2025 · Apt 2A

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2a, 3rd story, 1st apartment from north at east

    Mar 25, 2025 · Apt 2A

    Open — Notice of issuance sent to tenant
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130degrees at all hot water fixture in the entire apartment located at apt 2a, 3rd story, 1st apartment from north at east

    Mar 25, 2025 · Apt 2A

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). that is defective in the entire apartment located at apt 2a, 3rd story, 1st apartment from west at north

    Feb 9, 2025 · Apt 2A

    Open — Nov sent out
  • B

    Repair or replace the smoke detector that is defective in the entire apartment located at apt 2a, 3rd story, 1st apartment from west at north

    Feb 9, 2025 · Apt 2A

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2a, 3rd story, 1st apartment from west at north

    Feb 9, 2025 · Apt 2A

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of hot water exceeds the maximum temperature of 130 degrees fahrenheit in the kitchen located at apt 2a, 3rd story, 1st apartment from west at north

    Feb 9, 2025 · Apt 2A

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective missing at vestibule entrance at public hall, 1st story

    Feb 9, 2025

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 3rd room from north located at apt 2a, 3rd story, 1st apartment from west at north

    Dec 20, 2024 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 2nd radiator from west at north wall in the kitchen located at apt 2a, 3rd story, 1st apartment from west at north

    Dec 20, 2024 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 4th room from north at east located at apt 2a, 3rd story, 1st apartment from west at north

    Dec 20, 2024 · Apt 2A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the east wall in the 4th room from north at east located at apt 2a, 3rd story, 1st apartment from west at north

    Dec 20, 2024 · Apt 2A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the east wall in the 3rd room from north located at apt 2a, 3rd story, 1st apartment from west at north

    Dec 20, 2024 · Apt 2A

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 2nd radiator from west at north wall in the kitchen located at apt 2a, 3rd story, 1st apartment from west at north

    Dec 20, 2024 · Apt 2A

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2a, 3rd story, 1st apartment from west at north

    Dec 16, 2024 · Apt 2A

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of hot water exceeding allowable maximum temperature of 130 degrees in the kitchen located at apt 2a, 3rd story, 1st apartment from west at north

    Dec 12, 2024 · Apt 2A

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2a, 3rd story, 1st apartment from west at north

    Dec 10, 2024 · Apt 2A

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 3rd story, 1st apartment from west at north

    Dec 10, 2024 · Apt 2A

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective door frame at the east wall in the 4th room from north at east located at apt 2a, 3rd story, 1st apartment from west at north

    Nov 8, 2024 · Apt 2A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak over the drop ceiling in the kitchen located at apt 2a, 3rd story, 1st apartment from west at north

    Nov 8, 2024 · Apt 2A

    Open — Nov sent out
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration the drop ceiling in the kitchen located at apt 2a, 3rd story, 1st apartment from west at north

    Nov 8, 2024 · Apt 2A

    Open — Nov sent out

DOB building violations · 4

  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed

ECB violations · 4

  • Class - 2

    As per hmc-27-2033, no visible signage from front door for access to boiler room., maintain boiler

    Oct 14, 2022

    Resolve
  • Class - 1

    B154,4a,5a,15,16,19b,24b,32a,36,38,50,50a,b,c. 50- boiler room not fire proof. 50a- flue pipe not supported. 50b- missing (clear out) at base of chimney. 50c- safety valve not piped down.

    Sep 3, 2010 · Penalty $1,000

    Resolve
  • Non-hazardous

    Work does not conform to approved plan.non-conforming work noted:new curb cut does not conform to approved plans.the plans shows 8 feet butthe actual curb cut was 11 feet.remedy:conform to approve plans

    Nov 17, 2003

    Resolve
  • Non-hazardous

    Work without a permit work noted concreting the vacant space at the right side yard approxiniately 10'x 57 illegaly.remedy:obtain permit or restore to prior legal condition

    Nov 17, 2003

    Resolve

Complaints

  • Paint/plaster

    Wall

    Jul 10, 2026 · Apt 2A

    Close
  • Electric

    Wiring

    Jul 10, 2026 · Apt 2A

    Close
  • Electric

    Lighting

    Jul 10, 2026 · Apt 2A

    Close
  • Electric

    Wiring

    Jul 10, 2026 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Jul 10, 2026 · Apt 2A

    Close
  • Electric

    Power outage

    Jul 8, 2026 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Oct 11, 2025 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Oct 10, 2025 · Apt 2A

    Close
  • Plumbing

    Toilet

    Jun 1, 2025 · Apt 1B

    Close
  • Plumbing

    Basin/sink

    Jun 1, 2025 · Apt 1B

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Apr 7, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Apr 7, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Apr 2, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Mar 25, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Mar 21, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Mar 14, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Feb 24, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Feb 23, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Feb 22, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Feb 14, 2025 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Feb 12, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Feb 10, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Feb 7, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Feb 3, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Jan 22, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Jan 2, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Jan 1, 2025 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Dec 31, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 24, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 18, 2024 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2024 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Dec 16, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 15, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 15, 2024 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Dec 13, 2024 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Dec 12, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 11, 2024 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Dec 10, 2024 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Dec 10, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 28, 2024 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Nov 28, 2024 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Nov 27, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 27, 2024 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Nov 27, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 27, 2024 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Nov 21, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 21, 2024 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Nov 12, 2024 · Apt 2A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S9)
Year built
1931
Floors
3
Residential units
4
Building area
7,686 ft²
Lot area
5,144 ft²
Zoning
R4
Community board
501
Council district
49
Block / lot
1008 / 43
Assessed value
$434,250
Landmark / historic district
No

HPD registration #500138, last renewed Aug 26, 2025.

Questions about 1918 Richmond Terrace

Who owns 1918 Richmond Terrace?

The owner of record in NYC Department of City Planning PLUTO data is Yang, Li Yu.

Does 1918 Richmond Terrace have violations?

Yes. NYC HPD has recorded 190 housing violations at this property.

Is 1918 Richmond Terrace rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1918 Richmond Terrace built?

City records list 1931 as the year it was built.

How many apartments are in 1918 Richmond Terrace?

It has 4 residential units and 6 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.