6 Hamilton Street
Staten Island, NY 10304BBL 5-00649-0025Map
Owner of record: U.s. Bank Trust National Association
6 Hamilton Street is a two-family home built in 2003 in Staten Island, 10304. It has 2 residential units across 2 floors. The owner of record is U.s. Bank Trust National Association. HPD has recorded 27 housing violations here, most recently on May 17, 2016. 20 of the 27 most recent violations are still open.
- HPD violations
- 27
- DOB violations
- 1
- ECB violations
- 4
- HPD complaints
- 28
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 27
- BHazardous
Provide an adequate supply of gas to the fixtures at oven range in the kitchen located at apt 2ndfl, 2nd story
May 17, 2016 · Apt 2NDFL
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 2ndfl, 2nd story
May 17, 2016 · Apt 2NDFL
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures .. in the entire apartment located at apt 2ndfl, 2nd story
May 17, 2016 · Apt 2NDFL
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures .. in the entire apartment located at apt 1st, 1st story
Dec 22, 2015 · Apt 1ST
Open — Nov sent out - CImmediately hazardous
Section 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1, 1st story
Apr 1, 2015 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story
Apr 1, 2015 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story
Mar 20, 2015 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at kitchen and bathroom in the entire apartment located at apt ph, 1st story
Jan 30, 2015 · Apt PH
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures bathroom and kitchen in the entire apartment located at apt ph, 1st story
Jan 30, 2015 · Apt PH
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling in the 3rd room from north located at apt 2fl, 2nd story
Dec 27, 2012 · Apt 2FL
Open — Nov sent out
Show 17 more ↓
- BHazardous
Repair the roof so that it will not leak over ceilings in the entire apartment located at apt 2fl, 2nd story
Dec 27, 2012 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color 3 square feet unkeyed sheetrock at north closet ceiling in the 3rd room from north located at apt 2fl, 2nd story
Dec 27, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling in the 2nd room from north located at apt 2fl, 2nd story
Dec 27, 2012 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt 2fl lower level, 2nd story
Dec 27, 2012 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north at west located at apt 2fl, 2nd story
Dec 27, 2012 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the 3rd room from north at east located at apt 2fl, 2nd story
Nov 26, 2012 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls inside closet in the 3rd room from north at east located at apt 2fl, 2nd story
Nov 26, 2012 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the entire apartment located at apt 2fl, 2nd story
Aug 9, 2012 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the private hallway located at apt 2fl, 2nd story
Aug 9, 2012 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color 2 square feet unkeyed sheetrock ceiling in the 2nd room from north located at apt 2fl, 2nd story
Aug 9, 2012 · Apt 2FL
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... 4 square feet at ceiling in the 2nd room from north located at apt 2fl, 2nd story
Aug 9, 2012 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling in the kitchen located at apt 2fl lower level, 2nd story
Aug 9, 2012 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 2fl lower level, 2nd story
Aug 9, 2012 · Apt 2FL
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story
Aug 9, 2012 · Apt 2FL
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... 3 square feet at east wall in north closet in the 3rd room from north located at apt 2fl, 2nd story
Aug 9, 2012 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color east and west walls in the 1st room from north located at apt bsmt
Aug 1, 2012 · Apt BSMT
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... 2 square feet at ceiling in the 1st room from north located at apt bsmt
Aug 1, 2012 · Apt BSMT
Open — Nov sent out
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 13, 2016
Dob violation - active
ECB violations · 4
- Class - 2
Ati i observed a approx 6ft high cement wall approx 100-110ft long around the peremiter exp 4 & 1 of the property the wall has a number of large cracks & a separation of the walls along the exp1 area removal or
Jan 16, 2026 · Penalty $6,250
Active - Class - 2
1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess
Feb 25, 2025 · Penalty $6,250
Active - Class - 1
Failure to maintain bldg in code-compliant manner time of insp. 9:45am@ time of insp. i observed disconnected meter lines for kitchen, bathrom, & laundry machine in basement / cellar observed no hot water for t
Apr 20, 2016 · Penalty $5,000
Active - Class - 3
Failure to maintain building in code compliant manner.noted:at left side of home exposure 2 a piece of aluminium trim has pulled away from side of roof is hamging and indanger of falling at time of inspection.m
Jun 17, 2010 · Penalty $500
Active
Complaints
- Heat/hot water
Apartment only
May 13, 2016 · Apt 2NDFL
Close - Plumbing
Water supply
May 13, 2016 · Apt 2NDFL
Close - General
Cooking gas
May 13, 2016 · Apt 2NDFL
Close - Heat/hot water
Apartment only
Feb 16, 2016 · Apt 1FL
Close - Heat/hot water
Entire building
Feb 16, 2016 · Apt BLDG
Close - Electric
Power outage
Dec 16, 2015 · Apt 1ST
Close - Heat/hot water
Entire building
Apr 8, 2015 · Apt PH
Close - Heat/hot water
Entire building
Mar 30, 2015 · Apt 1
Close - Heat/hot water
Entire building
Mar 18, 2015 · Apt 1
Close - Heat/hot water
Entire building
Feb 10, 2015 · Apt BLDG
Close
Show 18 more ↓
- Plumbing
Water supply
Jan 28, 2015 · Apt PH
Close - Plumbing
Water-leaks
Dec 18, 2012 · Apt 2FL
Close - Plumbing
Water-leaks
Dec 18, 2012 · Apt 2FL
Close - Plumbing
Water-leaks
Nov 7, 2012 · Apt 2FL
Close - General
Windows
Jul 30, 2012 · Apt BSMT
Close - Appliance
Refrigerator
Jul 30, 2012 · Apt BSMT
Close - Paint/plaster
Wall
Jul 30, 2012 · Apt BSMT
Close - General
Cooking gas
Jul 30, 2012 · Apt BSMT
Close - Paint/plaster
Wall
Jul 29, 2012 · Apt 2FL
Close - Paint/plaster
Wall
Jul 29, 2012 · Apt 2FL
Close - Paint/plaster
Wall
Jul 29, 2012 · Apt 2FL
Close - Plumbing
Water-leaks
Jul 29, 2012 · Apt 2FL
Close - Plumbing
Water-leaks
Jul 29, 2012 · Apt 2FL
Close - Paint/plaster
Ceiling
Jul 29, 2012 · Apt 2FL
Close - Paint/plaster
Ceiling
Jul 29, 2012 · Apt 2FL
Close - Plumbing
Water-leaks
Jul 29, 2012 · Apt 2FL
Close - Plumbing
Water-leaks
Jul 29, 2012 · Apt 2FL
Close - Paint/plaster
Ceiling
Jul 29, 2012 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 2003
- Floors
- 2
- Residential units
- 2
- Building area
- 2,700 ft²
- Lot area
- 9,164 ft²
- Zoning
- R3A
- Community board
- 501
- Council district
- 49
- Block / lot
- 649 / 25
- Assessed value
- $55,980
- Landmark / historic district
- No
Questions about 6 Hamilton Street
Who owns 6 Hamilton Street?
The owner of record in NYC Department of City Planning PLUTO data is U.s. Bank Trust National Association.
Does 6 Hamilton Street have violations?
Yes. NYC HPD has recorded 27 housing violations at this property.
Is 6 Hamilton Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 6 Hamilton Street built?
City records list 2003 as the year it was built.
How many apartments are in 6 Hamilton Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.