51 Coursen Place
Staten Island, NY 10304BBL 5-00557-0004Map
Owner of record: 51 Coursen Place
51 Coursen Place is a walk-up apartment building built in 1971 in Staten Island, 10304. It has 30 residential units across 3 floors. The owner of record is 51 Coursen Place. HPD has recorded 360 housing violations here, most recently on September 2, 2026. 25 of the 50 most recent violations are still open.
- HPD violations
- 360
- DOB violations
- 6
- ECB violations
- 8
- HPD complaints
- 730
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 360
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1j, 1st story, 3rd apartment from south at west
Sep 2, 2026 · Apt 1J
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchen located at apt 1j, 1st story, 3rd apartment from west at north
Aug 19, 2026 · Apt 1J
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1j, 1st story, 3rd apartment from west at north
Aug 19, 2026 · Apt 1J
Open — First no access to re- inspect violation - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at building entrance door , 1st story
Jul 10, 2026
Open — Nov sent out - ANon-hazardous
Replace with new the missing safety caps at 1st electrical outlet from north at east at laundry room at north at public hall, 2nd story
Jul 10, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at vestibule area , 1st story
Jul 10, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at vestibule area , 1st story
Jul 10, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door at south at basement level at public hall
Jun 21, 2026
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing safety caps at all electrical outlets at all walls at public hall, 2nd story
Jun 21, 2026
Open — Nov certified on time - ANon-hazardous
Replace with new the missing safety caps at all electrical outlets at all walls at public hall, 1st story
Jun 21, 2026
Open — Nov certified on time
Show 40 more ↓
- BHazardous
Remove all encumbrances consisting of household items at basement level at public hall
Jun 21, 2026
Open — Nov certified on time - ANon-hazardous
Replace with new the missing safety caps at all electrical outlets at all walls at basement level at public hall
Jun 21, 2026
Open — Nov certified on time - CImmediately hazardous
Remove the illegal fastening slidebolt capable of padlock at fire door at south at basement level at public hall
Jun 21, 2026
Open — Not complied with - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at building entrance , 1st story
Jun 21, 2026
Open — Nov certified on time - BHazardous
Remove all encumbrances consisting of household items at public hall, 2nd story
Jun 21, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile at public hall stairs, 2nd story
Jun 21, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at fire door at west at public hall, 1st story
Jun 21, 2026
Open — False certification - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at 2nd fire door at north at public hall, 1st story
Jun 21, 2026
Open — False certification - CImmediately hazardous
Remove the illegal fastening slidebolt capable of padlock at laundry room at north at public hall, 2nd story
Jun 21, 2026
Open — Not complied with - CImmediately hazardous
Provide seal at opening at south wall at public hall stairs, 2nd story
Jun 21, 2026
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from east at south located at apt 3b, 2nd story, 2nd apartment from east at south , section at west
May 5, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the 1st room from east at south located at apt 3b, 2nd story, 2nd apartment from east at south , section at west
May 5, 2026 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3a, 2nd story, 1st apartment from west at north , section at west
May 5, 2026 · Apt 3A
Open — Violation will be reinspected - CImmediately hazardous
Remove device preventing door from being self-closing consisting of wood wedge at fire door to stairs at public hall, 2nd story
May 5, 2026
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of wood wedge at fire door to laundry room at public hall, 2nd story
May 5, 2026
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of wood wedge at fire door to east section at public hall, 2nd story
May 5, 2026
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of wood wedge at fire door to west section at public hall, 2nd story
May 5, 2026
Closed — Violation closed - BHazardous
Replace with new the missing handles on door in the entrance located at apt 3f, 2nd story, 1st apartment from west at north , section ''east''
Mar 23, 2026 · Apt 3F
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 3f, 2nd story, 1st apartment from west at north , section ''east''
Mar 23, 2026 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 2nd story, 1st apartment from west at north , section ''east''
Mar 23, 2026 · Apt 3F
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective wood subfloor in the kitchenette located at apt 3f, 2nd story, 1st apartment from west at north , section ''east''
Mar 23, 2026 · Apt 3F
Closed — Violation dismissed - BHazardous
Properly secure the loose lower and upper hinges on doors at base cabinet in the kitchenette located at apt 3f, 2nd story, 1st apartment from west at north , section ''east''
Mar 23, 2026 · Apt 3F
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood subfloor in the 1st room from north located at apt 3f, 2nd story, 1st apartment from west at north , section ''east''
Mar 23, 2026 · Apt 3F
Closed — Violation dismissed - BHazardous
Properly secure the loose lower and upper hinges on doors at wall cabinet in the kitchenette located at apt 3f, 2nd story, 1st apartment from west at north , section ''east''
Mar 23, 2026 · Apt 3F
Closed — Violation dismissed - BHazardous
Properly secure the loose wash basin at south wall in the bathroom located at apt 3f, 2nd story, 1st apartment from west at north , section ''east''
Mar 23, 2026 · Apt 3F
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 3f, 2nd story, 1st apartment from west at north , section ''east''
Mar 23, 2026 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3f, 2nd story, 1st apartment from west at north , section ''east''
Mar 23, 2026 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl tile at floor in the kitchenette located at apt 3f, 2nd story, 1st apartment from west at north , section ''east''
Mar 23, 2026 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tile at floor in the bathroom located at apt 3f, 2nd story, 1st apartment from west at north , section ''east''
Mar 23, 2026 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at entrance door to fire stairs at public hall, 1st story
Jan 15, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Nov 26, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective leading to section west, latch at public hall, 1st story
Nov 26, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door , 1st story
Nov 19, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2h, 2nd story, 2nd apartment from west at north , section ''east''
May 24, 2025 · Apt 2H
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door , 1st story
May 24, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective mechanical air vent at south wall in the kitchen located at apt 2h, 2nd story, 2nd apartment from west at north , section ''east''
May 24, 2025 · Apt 2H
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the foyer located at apt 2h, 2nd story, 2nd apartment from west at north , section ''east''
May 24, 2025 · Apt 2H
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical outlet at south wall in the bathroom located at apt 2h, 2nd story, 2nd apartment from west at north , section ''east''
May 24, 2025 · Apt 2H
Closed — Violation closed
DOB building violations · 6
- Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Nov 25, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 8, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 4, 1993
Dob violation - dismissed
ECB violations · 8
- Class - 1
At time of inspection observed facade in disrepair, at exposure 2 and 4 cracks on facade wall at multiple locations, bricks damaged eroded mortar joints at all exposures., maintain exterior building wall
Feb 3, 2023 · Penalty $625
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order.on 05/19/2017 @ 10:20am,respondent listed above conducted inspections under permit #520276834 while notice of stop work order was in effect.s.w.o i
May 22, 2017
Resolve - Class - 1
Work w/o a permit. noted: at time of inspection, observed plumbingworktaken place in bldg in stairwell for laundry room on 3rd floor w/o a dept issued permit. rmdy: obtain permit.
Feb 22, 2017 · Penalty $400
Resolve - Class - 1
Unapproved,unsafe,unsuitable electrical equipment apparatus,materials,devices,appliances or wiring in use.observed @ am that outdoor fixtures had been installed & occupied w/ indoor materials.emt electrical met
Apr 21, 2015 · Penalty $400
Resolve - Class - 1
Electrical work w/o permit.electrical wiring & installation of outsidelighting fixtures & raceways branch circuits priot to obtaining permit.rem:obtain permit
Apr 21, 2015
Resolve - Non-hazardous
Failure to maintain building.noted:the fence on the right side of the building is leaning over the adjacent property due to the debris being stored against the fence.broken glasses and fine garbages were on the
May 3, 2004 · Penalty $180
Resolve - Hazardous
Failure to maintain noted: the front facade at left to middle of buildign starting from top of lintels of top 3rd story to top of stone copying of parapet wall has collpsed the remaining protion of front facade
May 14, 1997 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior building wall; in that approximately 25' of parapet wall on the fourth west corner of premises collapse onto front of property a remaining portion of parapet wall about 50 is out
May 13, 1997
Resolve
Complaints
- Unsanitary condition
Pests
Aug 31, 2026 · Apt 3J
Close - General
Cabinet
Aug 31, 2026 · Apt 3J
Close - Door/window
Window frame
Aug 31, 2026 · Apt 3J
Close - Plumbing
Toilet
Aug 31, 2026 · Apt 3J
Close - Plumbing
Basin/sink
Aug 31, 2026 · Apt 3J
Close - Water leak
Heavy flow
Aug 21, 2026 · Apt 1J
Close - Water leak
Slow leak
Jul 27, 2026 · Apt 1J
Close - Water leak
Slow leak
Jul 21, 2026 · Apt 1J
Close - Unsanitary condition
Pests
Jun 6, 2026 · Apt 2G
Close - Water leak
Heavy flow
Jun 6, 2026 · Apt 2G
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Jun 6, 2026 · Apt 2G
Close - Unsanitary condition
Pests
Mar 30, 2026 · Apt 3F
Close - Paint/plaster
Wall
Mar 30, 2026 · Apt 3F
Close - Paint/plaster
Wall
Mar 30, 2026 · Apt 3F
Close - General
Cabinet
Mar 30, 2026 · Apt 3F
Close - Flooring/stairs
Floor
Feb 18, 2026 · Apt 3F
Close - General
Cabinet
Feb 18, 2026 · Apt 3F
Close - Flooring/stairs
Floor
Feb 18, 2026 · Apt 3F
Close - Unsanitary condition
Mold
Dec 19, 2025 · Apt 3B
Close - Water leak
Heavy flow
Dec 19, 2025 · Apt 3B
Close - Appliance
Electric/gas range
Dec 5, 2025 · Apt 2H
Close - Appliance
Electric/gas range
Dec 4, 2025 · Apt 2H
Close - Plumbing
Water supply
Nov 22, 2025 · Apt 2D
Close - Unsanitary condition
Pests
Oct 2, 2025 · Apt 2G
Close - Water leak
Heavy flow
May 21, 2025 · Apt 2H
Close - Unsanitary condition
Mold
May 21, 2025 · Apt 2H
Close - Unsanitary condition
Pests
May 21, 2025 · Apt 2H
Close - Door/window
Window frame
Mar 3, 2025 · Apt 3B
Close - Heat/hot water
Apartment only
Feb 16, 2025 · Apt 3A
Close - Water leak
Heavy flow
Feb 16, 2025 · Apt 3A
Close - Plumbing
Bathtub/shower
Feb 16, 2025 · Apt 3A
Close - Plumbing
Basin/sink
Feb 16, 2025 · Apt 3A
Close - Heat/hot water
Apartment only
Feb 8, 2025 · Apt 3A
Close - Plumbing
Basin/sink
Feb 8, 2025 · Apt 3A
Close - Water leak
Heavy flow
Feb 8, 2025 · Apt 3A
Close - Plumbing
Bathtub/shower
Feb 8, 2025 · Apt 3A
Close - Electric
Wiring
Feb 8, 2025 · Apt 3A
Close - Safety
Fire escape
Jan 25, 2025 · Apt BLDG
Close - Paint/plaster
Ceiling
Jun 24, 2024 · Apt 1G
Close - Water leak
Heavy flow
Jun 24, 2024 · Apt 1G
Close - Paint/plaster
Ceiling
Jun 12, 2024 · Apt 1G
Close - Water leak
Heavy flow
Jun 12, 2024 · Apt 1G
Close - Electric
Lighting
Jun 5, 2024 · Apt 1F
Close - Unsanitary condition
Garbage/recycling storage
May 29, 2024 · Apt BLDG
Close - Water leak
Slow leak
May 22, 2024 · Apt 1F
Close - Paint/plaster
Ceiling
May 6, 2024 · Apt 1G
Close - Appliance
Electric/gas range
May 6, 2024 · Apt 1G
Close - Door/window
Door
May 6, 2024 · Apt 1G
Close - Paint/plaster
Ceiling
May 6, 2024 · Apt 1G
Close - Flooring/stairs
Floor
May 6, 2024 · Apt 1G
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C9)
- Year built
- 1971
- Floors
- 3
- Residential units
- 30
- Building area
- 19,386 ft²
- Lot area
- 19,350 ft²
- Zoning
- R3A
- Community board
- 501
- Council district
- 49
- Block / lot
- 557 / 4
- Assessed value
- $967,050
- Landmark / historic district
- No
HPD registration #501015, last renewed Sep 13, 2025.
Questions about 51 Coursen Place
Who owns 51 Coursen Place?
The owner of record in NYC Department of City Planning PLUTO data is 51 Coursen Place.
Does 51 Coursen Place have violations?
Yes. NYC HPD has recorded 360 housing violations at this property.
Is 51 Coursen Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 51 Coursen Place built?
City records list 1971 as the year it was built.
How many apartments are in 51 Coursen Place?
It has 30 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.